Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 12, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

20 -- CHT PIPING AND MODIFIC ATIONS O THE CHT TANK

Closed
Reference-Number-N21441-7096-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

811219 - Other Electronic and Precision Equipment Repair and Maintenance

Place of Performance

NORFOLK, VA 23523, AE

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Fleet Support Command
Contacts2 people available
OfficeFPO, AE, 09622-0023, USA
Office AddressFPO, AE, 09622-0023, USA
Contacts
RICHARD A. MADISONCONTRACT SPECIALIST

Full Description

Show more
N21441-7096-00091.0 ABSTRACT: This item describes the repair of the CHT piping and modifications to the CHT tank. 2.0 REFERENCES/ENCLOSURES: None 3.0 LOCATION/QUANTITY/DESCRIPTION: 3.1 Sewage Treatment Room, CHT Tank 3-36-0-W. 3.2 Suction piping; 3 90/10 approximately 20 LF. Include elbows. 3.3 Material for tank modifications as detailed in paragraph 7.3 3.4 Services of a Marine Chemist. 4.0 GOVERNMENT FURNISHED MATERIAL/SERVICES 4.1 GFS - ABS Surveyor 5.0 NOTES 5.1 Ship check to determine the exact piping to be replaced. The USNS Grasp is available for ship check. Contact the Port Engineer. 5.2 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all GTR's. 5.3 The crew will move ashore for the duration of this work. The sewage system will be secured for approximately seven (7) days. 6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional 7.0 STATEMENT OF WORK REQUIRED 7.1 Piping Repair; Crop out and replace the suction piping up to the pump suction valves on the aspirator and sewage pumps. Include all three existing suctions and three tank penetrations. 7.2 Sewage Tank Repair: Clean and gas free safe for hot work. 7.2.1 Provide the services of a Certified Marine Chemist. Gas free - Safe for Hot Work all work spaces including surrounding compartments and spaces. a. Update gas free certifications on a daily basis during scope of work utilizing a competent person. b. Post one (1) copy at the gangway, one (1) copy at the space/location of hot work, and provide one (1) copy to the Chief Engineer. 7.2.2 Replace wasted steel in way of the suction boss. Replace boss. 7.3 CHT tank modifications: Install new penetrations on the CHT tank; two 4 flanges welded onto the tank, two 1 threaded coupling bosses installed. The 4 flanges should be installed as follows: One on top of the tank just above and inboard of the tank access. One installed just fwd of the existing flange for the high level sensor on the inboard side of the tank. The bosses should be installed on the fwd bulkhead of the tank, in the passageway. One near the top of the tank, and one lower on the tank just below the level of the tank access plate. These penetrations are for future improvements of monitoring tank level, and also to set up the tank so that if it overflows it overflows to the CHT pump room vice overflowing through the deck drains in the level above. Install blanks on the installed 4 flanges after installation, and install plugs into the 1 coupling bosses after installation. 7.4 Prepare, prime and paint all new and disturbed areas to match existing. 7.5 Provide three (3) porta-poties (toilets), two for use by the contractor and one for use by the ships force exclusive. Insure they are serviced as needed. Supply the toilets through the entire week the sewage system will be secured on the vessel. 8.0 GENERAL REQUIREMENTS: None Additional

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS