Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

2024-2029 Housing Element Update and Safety Element Update IS/ND

Forecast
FG-25-24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sonora is updating its Housing and Safety Elements of the General Plan to comply with current state laws, ensuring alignment with other general plan components and addressing recently enacted legislation. The Housing Element Update assesses the city’s housing needs across all income levels, identifies challenges, and establishes measurable goals and policies for the preservation, improvement, and development of housing over the 2024–2029 period. The Safety Element Update evaluates natural and human-caused hazards—including climate change and wildfire risks—and outlines strategies to reduce potential injury, death, property loss, and community hardship through updated goals, policies, and actionable mitigation measures. Both updates are policy-driven and do not involve any physical development or construction. The project was processed under the California Environmental Quality Act (CEQA) and determined to have no significant environmental impact, resulting in the adoption of a Negative Declaration. No construction, physical delivery, or product shipment is involved; all deliverables are planning documents requiring regulatory compliance, public availability, and official adoption by the city. Fees totaling $3,161.50 were paid for environmental review and filing but are not part of a procurement contract for services. The lead agency, the City of Sonora, oversees all aspects of compliance, review, and approval with no formal contracting officer, COR, COTR, or federal acquisition clauses involved. The project is governed solely by state planning and environmental law, with all activities centered at the city’s offices in Sonora, California.

General Info

Sonora updates housing and safety elements for 2024–2029 via policy changes, no construction, CEQA Negative Declaration adopted.

Place of Performance

Sonora, CA, 95370

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sonora
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Sonora is updating the General Plan Housing and Safety Elements in order to align them with other General Plan Elements, as required by State law. Both updates strive to align with recently enacted State laws and meet State requirements. The Safety Element Update is intended to adopt new climate change and wildfire mitigation strategies that will help the City better prepare for possible new and more severe climate scenarios. The proposed Housing Element Update describes and analyzes the housing needs of Sonora residents and the issues confronted by the City, and provides goals, policies, and quantified objectives related to the maintenance, preservation, improvement, and development of housing. The Safety Element Update (SEU) analyzes potential natural and human-caused hazards to safety in the City and provides goals, policies, and actions to minimize these hazards. The SEU evaluates hazards that may affect existing and future development and growth and provides guidelines for protecting the community and minimizing harm to the extent feasible. The goal of the SEU is to reduce the risk of injury, death, property loss, and other hardships to acceptable levels. Periodic updates of the Safety Element ensure that goals and policies remain relevant and responsive to community needs, hazard situations, and State law.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS