This Solicitation opportunity from Pennsylvania was posted on April 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This contract involves the removal and replacement of concrete curb, sidewalk, and curb ramps at designated locations within Perkasie Borough, Pennsylvania. It includes a base bid and one alternate bid, with all required materials, labor, and equipment to be supplied in accordance with PennDOT Publication 408 and Borough Standards. The project aims to improve pedestrian infrastructure and accessibility, adhering to specified standards and regulations. The solicitation, titled "2024 Concrete Program," was posted on April 30, 2024, with a response deadline of May 14, 2024. The contract is managed by the Perkasie Borough and is associated with the NAICS code 238110, which pertains to concrete work and construction services. The primary point of contact for inquiries is Douglas Rossino, reachable via email at [email hidden] or by phone at [phone hidden].
HighAI Summary for 00 41 00 Bid Form: A placeholder document for the Bid Form (00 41 00), directing users to the PennBid website to locate the specific form for the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2024 Concrete Program - List of Drawings: A list of drawing sheets for the 2024 Concrete Program, including traffic calming exhibits for W. Blooming Glen Drive and a site improvement plan for the Perkasie Borough Police Station.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for 24-04175 Perkasie Borough 2024 Concrete Program Prevailing Wage Rates: Prevailing minimum wage determination for the Perkasie Borough 2024 Concrete Program (Serial Number 24-04175), dated April 24, 2024. The document specifies hourly rates and fringe benefits for various labor classifications, including carpenters, laborers, and iron workers, for a project involving the removal and replacement of concrete curb, sidewalk, and curb ramps in Bucks County.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 48-Doc 00 01 15 01 List of Drawings - 2024 Concrete Program: A list of drawings and site map for the 2024 Concrete Program, specifically referencing Pine Street. This document serves as a technical specification for the project's visual and spatial requirements.
XLSX
XLSX, High priority: read this firstbid-tabulation
HighAI Summary for 49-2024 Concrete Program Bid Tab: Bid tabulation sheet dated 2024-05-14 for the Concrete Program (49-2024). The document compares unit and total pricing for base and alternate bid items, including concrete curb and sidewalk removal and replacement, across three vendors: G&B Construction, JDC Construction Services, Inc., and T. Schiefer Contractors, Inc.
PDF
PDF, High priority: read this firstifb
HighAI Summary for CN 2024-02: 2024 Concrete Program Advertisement for Bids: Advertisement for Bids issued by the Borough of Perkasie for Contract 2024-02 (2024 Concrete Program). The project involves the removal and replacement of concrete curb, sidewalk, and curb ramps. Sealed bids are due by 10:30 A.M. on May 14, 2024. Requirements include a 10% bid bond/certified check, compliance with PennDOT Publication 408, and adherence to the Pennsylvania Prevailing Wage Act.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CN 2024-02 W Blooming Glen Dr - List of Drawings: A list of drawings associated with project CN 2024-02 for W Blooming Glen Dr, serving as a technical reference for the procurement file.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 2024-00011: 2024 Concrete Program Estimated Quantities: This document provides a detailed breakdown of estimated replacement quantities for the Perkasie Borough 2024 Concrete Program (Contract 2024-00011). It specifies linear footage (LF) for curbs and square footage (SF) for sidewalks and concrete curb ramps across various street addresses, including a base bid and an alternate bid section.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 2024-02: 2024 Concrete Program Agreement: Agreement between the Borough of Perkasie (Owner) and a Contractor for the 2024 Concrete Program (Contract 2024-02). The scope includes the removal and replacement of concrete curbs, sidewalks, and curb ramps. The document specifies a substantial completion timeframe of 60 calendar days, liquidated damages of $500.00 per day for delays, and payment terms including a 90-95% progress payment structure with retainage.
PDF
PDF, High priority: read this firstbidder-acknowledgement
HighAI Summary for Contract 2024-02: 2024 Concrete Program - Bidder Acknowledgement Form: A formal acknowledgement form for bidders responding to Contract 2024-02 (2024 Concrete Program). The document requires bidders to certify their agreement to the contract terms, acknowledge receipt of addenda, confirm site visits, and certify that the bid is genuine and non-collusive.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Contract 2024-02: Bidder Qualification Statement: A mandatory Bidder Qualification Statement for Contract 2024-02 (2024 Concrete Program). The document requires bidders to provide organizational background, work history for projects completed or in progress over the last five years, financial statements, and a notarized affidavit certifying the accuracy of the submitted information.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract No. 2024-02: 2024 Concrete Program Project Manual: Project Manual for the 2024 Concrete Program (Contract No. 2024-02), prepared by Gilmore & Associates, Inc. for Perkasie Borough, dated May 2024.
PDF
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for Doc 00 21 13.1 Instructions for Electronic Bidding: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It covers registration, document downloading, the submission and finalization process, and how to withdraw or revise bids. Additionally, it lists the specific required documents for submission, including the Bid Form Questionnaire, Bid Bond, Bidder's Acknowledgement Form, Bidder Qualification Statement, Non-Collusion Affidavit, Agreement of Surety Company, and the Public Works Employment Verification Form.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Document 00 21 13 - Instructions to Bidders: This document provides the formal Instructions to Bidders for a construction project. It outlines the rules and procedures for bidding, including bidder qualifications, site examination requirements, bid submission protocols, and the evaluation process for awarding the contract. It specifically references the use of PennBid for document access and requires a Bidder Qualification Statement for submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Document 00 43 13 Bid Bond (Penal Sum Form): A standard Bid Bond form for the Borough of Perkasie. This document establishes the legal obligation of the Bidder and Surety to pay a penal sum to the Owner upon the Bidder's default in executing the Agreement and providing required performance and payment bonds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Document 00 73 00 Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCDC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement times, outlines the schedule of values, and specifies requirements for contract documents, subsurface conditions, and insurance. It also references compliance with the Pennsylvania Prevailing Wage Act and the Public Works Employment Verification Act.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Document 00 91 13 Addenda: This document outlines the procedure for issuing and accessing addenda for the bidding process, specifying that addenda are either included in the Bidding Documents or posted on the PennBid website.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract: Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). This document establishes the legal and operational framework for construction contracts, covering definitions, contractor and owner responsibilities, bonds, insurance, change orders, payment terms, and dispute resolution.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Perkasie Borough Contract No. 2024-02 2024 Concrete Program - Table of Contents: Table of Contents for Perkasie Borough Contract No. 2024-02 regarding the 2024 Concrete Program. The document outlines the structure of the solicitation, including procurement requirements (bid forms, bonds), contracting requirements (agreements, insurance), general requirements (measurement and payment), and technical specifications for demolition, concrete reinforcement, and paving.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 11 13 Summary of Work - Perkasie Borough: This document provides the Summary of Work for a project in Perkasie Borough involving the removal and replacement of concrete curbs, sidewalks, and curb ramps. It outlines the scope of work, including base and alternate bids, coordination with other parties and roadway work, contractor responsibilities regarding site use and utility protection (per Pennsylvania Act 287), and compliance with PennDOT Publication 408 and OSHA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 Measurement and Payment: Technical specifications detailing the measurement and payment criteria for concrete work, including vertical/depressed curbs, sidewalks, and curb ramps. It defines unit price compensation, material requirements (3,000 PSI Class A concrete), and compliance with PennDOT Publications 408 and 72.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This technical specification section outlines the administrative requirements for contract management, including the submission of the Schedule of Values, procedures for monthly applications for payment, and detailed protocols for handling change orders (stipulated price, unit price, and time and material) and work change directives.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for coordination, field engineering, and meeting protocols. It outlines the contractor's responsibilities for survey control, the requirements for the preconstruction meeting (including required attendees and agenda items), and the scheduling and documentation of progress meetings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: Technical specification section 01 33 00 detailing the requirements and procedures for project submittals. It outlines the processes for construction progress schedules, product data, shop drawings, certificates, and manufacturer's instructions, including submission timelines and Engineer review requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Control: Technical specification section 01 40 00 detailing quality control requirements for a construction project. It covers quality assurance, installation tolerances, reference standards, mock-up requirements, testing laboratory services, observation services, and manufacturer field services, as well as requirements for site examination and preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specifications detailing the contractor's requirements for temporary utilities, sanitary facilities, site barriers, water and dust control, security, parking, and progress cleaning during construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specifications detailing the contractor's obligations for traffic regulation and control. It covers the implementation of traffic control plans, notification requirements for local authorities, construction parking controls, the use of flag persons, haul routes, and the installation/removal of traffic signs and signals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 13 - Soil Erosion and Sediment Control: Technical specifications for Soil Erosion and Sediment Control, requiring the contractor to implement and maintain a control plan in accordance with Pennsylvania DEP and PennDOT Publication 408 standards. It details requirements for temporary and permanent control measures, including silt fences, inlet protection, and seeding, as well as inspection and maintenance protocols.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specification section 01 60 00 detailing requirements for the procurement, transportation, handling, storage, and protection of materials and equipment. It includes specific protocols for product options and the formal procedure for requesting substitutions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the requirements for contract closeout, including final cleaning, project record documents, punchlist completion, and required final documentation such as payroll certifications and lien waivers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 71 13 - Mobilization: Technical specifications for Section 01 71 13 regarding Mobilization. The document outlines requirements for the assembly and set-up of facilities, permits, insurance, and bonds. It specifically mandates video and photographic documentation of existing concrete conditions for the Borough Engineer and Perkasie Borough. It notes that mobilization is incidental to other work and will not be paid as a separate line item.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 - Demolition: Technical specifications for demolition work, including the removal of concrete curbs, sidewalks, handicap ramps, and driveway aprons. The document outlines requirements for site protection, dust control, utility protection, and the removal of demolished materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 20 00 - Concrete Reinforcement: Technical specifications for concrete reinforcement, including reinforcing steel bars, wire fabric, and accessories. The document outlines quality assurance standards (ACI, ASTM, CRSI), submittal requirements, material grades (ASTM A615, 60 ksi), and execution guidelines for placement and fabrication.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 23 - Restoration of Paved Surfaces: Technical specifications for the restoration of paved surfaces, including walkways, driveways, and curb and gutter repairs. The document mandates compliance with PennDOT Publication 408 and specifies materials for concrete and asphalt paving, as well as execution requirements for saw cutting and reconstruction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 13 13 - Portland Cement Concrete Paving: Technical specifications for Portland Cement Concrete Paving, covering the construction of concrete sidewalks, curbs, and driveway aprons. The document details quality assurance standards (ACI, ASTM, PennDOT), material requirements for forms and reinforcement, concrete mix criteria (Class A, 3,000 psi 28-day strength), and execution procedures for subgrade preparation, forming, and finishing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 17 23.43 - ADA Detectable Warning Surfaces: Technical specifications for the installation of ADA/PennDOT compliant replaceable cast-in-place detectable warning surfaces (DWS). The document outlines requirements for installer qualifications (5 years experience), product standards conforming to PennDOT Publication 408, specific dimensions, Colonial Red color, and a five-year written guarantee.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 00 - Landscaping: Technical specifications for landscaping services, including soil preparation, planting, seeding, and sodding. The document details specific seed mixtures (Formulas B, D, E, L, and W), application rates, fertilizer requirements, and maintenance standards compliant with Pennsylvania Department of Transportation Publication 408.
PDF
PDF, Low prioritycontract-document
LowAI Summary for 2024 Concrete Program - Consent of Surety to Final Payment: A legal form titled 'Consent of Surety to Final Payment' for the 2024 Concrete Program between The Borough of Perkasie and a contractor. The document serves as a formal approval by the surety company for the final payment to be released to the contractor, confirming that all labor and material claims have been settled while maintaining the surety's obligations under the bond.
PDF
PDF, Low priorityother
LowAI Summary for Appendix B - Public Works Employment Verification Form: A Commonwealth of Pennsylvania compliance form requiring contractors and subcontractors to affirm their use of the federal E-Verify Program (EVP) to verify employment eligibility for all employees hired post-January 1, 2013, in accordance with the Public Works Employment Verification Act.
PDF
PDF, Low priorityperformance-bond
LowAI Summary for Borough of Perkasie - Performance Bond Template: A standard performance bond form for the Borough of Perkasie. The document outlines the legal obligations of the Contractor and Surety to ensure the completion of the contract, including procedures for declaring contractor default and the remedies available to the Owner.
PDF
PDF, Low prioritymaintenance-bond
LowAI Summary for Contract 2024-02: 2024 Concrete Program - Maintenance Bond: A legal bond template for Contract 2024-02 (2024 Concrete Program) requiring the Principal to provide a maintenance bond for 100% of the completed contract amount. The bond ensures the repair of defects in materials or workmanship for twelve months following final completion and acceptance.
PDF
PDF, Low priorityother
LowAI Summary for Contract 2024-02: Agreement of Surety Company: A legal template for an Agreement of Surety Company regarding Contract 2024-02 (2024 Concrete Program) for the Borough of Perkasie, PA. The document outlines the surety's commitment to provide performance and payment bonds totaling 100% of the contract amount if the bid is awarded.
PDF
PDF, Low priorityspecifications
LowAI Summary for Contract 2024-02: Certificate of Insurance (Doc 00 62 16): This document specifies the insurance requirements for the 2024 Concrete Program (Contract 2024-02), identifying Perkasie Borough and Gilmore & Associates, Inc. as required additional insureds and referencing Document 00 73 00 for specific coverage and limit requirements.
PDF
PDF, Low priorityother
LowAI Summary for Contract 2024-02: Contractor's Affidavit: A legal affidavit template for the Borough of Perkasie's 2024 Concrete Program (Contract 2024-02). The document serves as a sworn statement by the contractor that all labor, materials, and claims associated with the work and approved change orders have been paid in full.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Contract 2024-02: Contractor's Release of Liens: A legal release of liens form for the Borough of Perkasie regarding Contract 2024-02 (2024 Concrete Program). The document serves as a formal discharge of claims and demands by the contractor upon receipt of final payment.
PDF
PDF, Low priorityother
LowAI Summary for Document 00 45 19 - Non-Collusion Affidavit: A legal affidavit form for the Borough of Perkasie requiring bidders to swear that they have not engaged in collusion or restraint of free, competitive bidding for the project.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Document 00 61 13.16 - Payment Bond (Borough of Perkasie): A standard Payment Bond form (EJCIC C-615(A) Modified) for the Borough of Perkasie. The document outlines the legal obligations of the Contractor and Surety to ensure payment for labor, materials, and equipment furnished by claimants during the performance of the contract.
PDF
PDF, Low priorityspecifications
LowAI Summary for Section 01 42 13 - Organization and Reference Acronyms: This document is a technical specification section providing a comprehensive list of acronyms and their corresponding organizations or references (such as AASHTO, ANSI, and OSHA) used throughout the Project Manual.
This contract includes a base bid and one alternate bid for the removal and replacement of concrete curb, sidewalk, and curb ramps at specified locations within Perkasie Borough. All material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Borough Standards.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award