Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on November 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2024 Landfill Gas Expansion Construction

Closed
PennBid: 161802State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves a comprehensive project to expand landfill gas extraction capabilities, including the installation of ten vertical extraction wells, with three featuring slip casings, and extensive piping work involving approximately 760 linear feet of 18-inch HDPE piping, 220 linear feet of 12-inch HDPE piping, 900 linear feet of 8-inch HDPE piping, and around 3,760 linear feet of 6-inch lateral piping. Additionally, the project requires the installation of approximately 2,000 linear feet of smaller diameter HDPE piping for compressed air and condensate forcemains. The scope also includes connecting new and existing wellheads and laterals to upgraded headers, installing wellheads, fittings, valves, and other appurtenances, and deploying seven vertical extraction well dewatering pumps, along with various valves for gas, air, and forcemain isolation and cleanout. The work encompasses the abandonment of existing piping and wells, site preparation, erosion control, and restoration activities to ensure environmental compliance and operational efficiency. The contract value ranges between 1.5 million and 3 million dollars, with a response deadline of December 13, 2024, and is managed by the Pennsylvania Department of Environmental Protection under solicitation number 161802.

General Info

Agency

Pennsylvania → 24-519-LFG-C

Place of Performance

PA, USA

Set-Aside

NONE

Documents

8

2024 Landfill Gas Collection System Expansion Construction - Bid Documents

PDF, High priority: read this firstrfb
High

2-2024 GCCS Expansion - Issued for Bidding Drawings

PDF, High priority: read this firstissued-for-bid-drawings
High

Bid Schedule BT-35AP 1738015463

XLSX, High priority: read this firstbid-schedule
High

Chester County Solid Waste Authority 2024 Landfill Gas Collection System Expansion - Bid Advertisement

PDF, High priority: read this firstrfb
High

Contract 24-519-LFG-C 2024 Landfill Gas Collection System Expansion Addendum 1

PDF, High priority: read this firstamendment
High

Contract 24-519-LFG-C 2024 Landfill Gas Expansion Addendum 3

PDF, High priority: read this firstamendment
High

Contract 24-519-LFG-C Landfill Gas Collection System Expansion Addendum 2

PDF, High priority: read this firstamendment
High

4-2024 LFG Sign-In Sheet 12-4-2024

PDF, Low prioritysign-in-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 13, 2024 to Jan 27, 2025. The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → 24-519-LFG-C
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → 24-519-LFG-C
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Project consists of the following: • Furnish and install 10 vertical extraction wells including 3 vertical extraction wells with slip casings. • Furnish and install approximately 760 linear feet of 18-inch HDPE piping to replace existing 8-inch below grade piping. • Furnish and install approximately 220 linear feet of 12-inch HDPE piping to replace existing 8-inch below grade piping. • Furnish and install approximately 900 linear feet of 8-inch HDPE piping. • Furnish and install approximately 3,760 linear feet of 6-inch HDPE lateral piping. • Furnish and install approximately 3,750 linear feet of 2-inch HDPE compressed air piping and 4-inch HDPE condensate forcemain piping. • Connection of all new and existing collection device wellheads and/or laterals from the existing 8-inch header to the new 18-inch and 12-inch headers and associated laterals. • Furnish and install all wellheads, fittings, valves and appurtenances. • Furnish and install 7 (seven) vertical extraction well dewatering pumps. • Furnish and install 6 (six) LFG valves. • Furnish and install 7 (seven) compressed air isolation and blow-off valves • Furnish and install 7 (seven) forcemain isolation and cleanout valves • Abandonment of existing 8-inch HDPE piping and associated laterals/risers in place. • Abandonment of 3 (three) vertical extraction wells; two having slip casings. • Surveying, site preparation, erosion and sediment controls and restoration.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS