This Solicitation opportunity from Idaho was posted on June 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Ada County Highway District (ACHD) is seeking Statements of Qualifications from professional firms interested in providing on-call consulting services for the 2025-2027 period, following the successful establishment of its previous list effective from October 2021 to September 2024. This procurement aims to select qualified firms across multiple categories, including roadway and bridge design, bridge inspection and structural analysis, environmental services, traffic signal timing, construction inspection, geotechnical services, surveying, transportation planning, and public outreach. Firms that qualify will be eligible to perform work on an as-needed basis within these categories, supporting ACHD’s ongoing infrastructure projects and maintenance efforts.
Interested firms must submit their qualifications electronically via the OpenGov portal by June 26, 2024, ensuring a single combined PDF response that addresses both the overall project and each specific category. Submissions must be complete and uploaded by the deadline, as failure to submit the overall response may disqualify individual category submissions. The contract has a maximum value of $300,000 and is open to organizations within Idaho, with the primary contact being Shannon Shaffer. This solicitation represents a key opportunity for engineering, environmental, and planning firms to be part of ACHD’s comprehensive transportation initiatives across Ada County.
HighAI Summary for 2025-27 On-Call Consultant Services RFQ MISC24-12: This document is a Request for Qualifications (RFQ) issued by Ada County Highway District (ACHD) for the 2025-27 On-Call Consultant Services (OCCS) List, identified as MISC24-12, dated June 4, 2024. The RFQ seeks Statements of Qualifications (SoQ) from firms interested in providing professional services on an on-call, as-needed basis for various categories including design, bridge inspection, environmental services, traffic signal timing, construction inspection, geotechnical services, surveying, transportation planning, and public involvement. The OCCS List will be effective from October 1, 2024, to September 30, 2027. The document includes instructions for submission, evaluation phases, and encourages attendance at a pre-submission meeting. The deadline for SoQ submission is June 26, 2024, with inquiries due by June 20, 2024.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for A1a Roadway Design Under $300k Statement of Work: This document is a Statement of Work (SOW) for On-Call Consultant Services in Roadway Design projects under $300,000 for Ada County Highway District (ACHD). Revised on 05/10/2024, it outlines the scope including public involvement, roadway, bridge, irrigation, street lighting, drainage, right-of-way design, surveying, geotechnical investigation, utility coordination, and ADA compliance. It emphasizes context sensitive design considering school sites, pedestrian/bike routes, lane widths, and design speed. Minimum requirements include a Professional Engineer's License in Idaho and five years of relevant experience.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for A2a Roadway Design Over $300,000 Statement of Work: This document is a Statement of Work (SOW) for On-Call Consultant Services in the Roadway Design category for projects over $300,000 by Ada County Highway District (ACHD). Revised on 05/10/2024, it outlines the scope including public involvement, intersection, roadway, bridge, structural, irrigation, drainage, right-of-way, street lighting design, surveying, geotechnical investigation, utility and railroad coordination, floodplain and environmental evaluation, and ADA compliance. It emphasizes context sensitive design considering pedestrian/bike routes, urban form, and unique project area features. Minimum requirements include a Professional Engineer's License in Idaho, five years of relevant experience, and completion of five large urban roadway projects over $250,000.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for A3a Bridge Design Statement of Work 5-28-24: This document is a Statement of Work (SOW) for On-Call Consultant Services related to Bridge Design under Ada County Highway District (ACHD) projects, revised on May 10, 2024. It outlines the scope of bridge and related design services including structural, irrigation, drainage, right-of-way, surveying, geotechnical, utility and railroad coordination, floodplain and environmental evaluation, mitigation design, and ADA compliance. The SOW emphasizes the concept design phase to address long-range transportation needs and context sensitive design considerations such as pedestrian/bike routes, urban form, and unique project area features. Minimum requirements include a licensed Professional Engineer in Idaho with at least five years of structural design experience authorized to sign and seal design plans.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for A4a Intersection Signal Design Statement of Work: This document is a Statement of Work (SOW) for On-Call Consultant Services related to Intersection and Signal Design for the Ada County Highway District (ACHD). Revised on 05/10/2024, it outlines the scope of work including intersection design plans with roadway modifications, bicycle lanes, sidewalks, pedestrian ramps, turn lane calculations, capacity and safety analyses, and traffic control plans. Signal design includes traffic signal plans, pedestrian crossing signals, vehicular detection, and signal phasing diagrams. All designs must comply with the Manual on Uniform Traffic Control Devices (MUTCD) and ACHD standards. Minimum requirements include professional engineering registration in Idaho.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for A5 Roundabout Design Statement of Work: This document is a Statement of Work (SOW) for On-Call Consultant Services related to roundabout design for the Ada County Highway District (ACHD), revised on 05/10/2024. It outlines the consultant's responsibilities including preparing roundabout capacity analyses, concept layouts, design vehicle path reviews, and supporting public involvement. The work must conform to ACHD Policy 5108 and Idaho Standards for Public Works Construction. Consultants must be licensed Professional Engineers in Idaho and may need to team with firms on the ACHD On-Call Consultant Services List if not already listed.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for A6 Landscape Architecture Statement of Work: This document is a Statement of Work (SOW) for On-Call Consultant Services in the Landscape Architecture A6 category, revised on 05/10/2024. It outlines the qualifications required for consultants, including experience with green stormwater infrastructure (GSI) projects, a relevant bachelor's degree, and professional registration in Idaho. The SOW details the scope of services such as project concept and design development for vegetated GSI, permeable pavement, stormwater tree cells, traditional stormwater best management practices, design criteria and guidance, irrigation system design, preliminary design, and preparation of contract documents including landscape site plans and specifications.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for ACHD On-Call Consultant Services Public Involvement and Outreach SOW: This Statement of Work (SOW) dated 05/10/24 outlines the requirements for On-Call Consultant Services for Public Involvement and Outreach for Ada County Highway District (ACHD) projects. The projects vary in complexity and include tasks such as intersection, roadway, bridge, and structural design, among others. The SOW emphasizes the need for public involvement and outreach activities including renderings, videos, public materials, stakeholder outreach, survey development, and coordination of public meetings. It requires adherence to ADA compliance and best practices in public participation. Minimum qualifications include five years of experience in public involvement and outreach, preferably in transportation, and submission of a portfolio demonstrating competency in these areas.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Ada County Highway District Construction Inspection SOW: This document is a Statement of Work (SOW) for On-Call Construction Inspection Consultant Services for the Ada County Highway District (ACHD), revised on 5/10/2024. It outlines the scope of services required including field sampling, materials handling and testing, construction administration, field inspection, traffic control inspections, material source and plant inspections, daily diaries, pay item tracking, safety problem resolution, warranty inspections, coordination of warranty work, and preparation of 'As-Constructed' drawings. It also includes monitoring contract project permit requirements and environmental compliance such as SWPPP inspection. Minimum requirements specify that firms must have at least one employee certified in Inspector Qualification Program and Western Alliance for Quality Transportation Construction.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Ada County Highway District Transportation Planning On-Call Consultant Services SOW: This Statement of Work (SOW) outlines the Ada County Highway District's (ACHD) need for On-Call Consultant Services to support transportation planning and project development. The document details three primary sub-categories of work: 1) Transportation Policy, Project Prioritization, and Asset Management Tools including policy development, prioritization methodologies, and asset management systems; 2) Project Development and Planning including alignment studies, public involvement, access management, and GIS analysis; 3) Land Use Transportation Joint Planning addressing land use changes, corridor studies, and multi-jurisdictional coordination. The SOW emphasizes data-driven decision making, cost-effectiveness, and compliance with ADA and Complete Streets principles.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Ba-Bridge On-Call Consultant Services SOW: This Statement of Work (SOW) dated 05/10/24 outlines the requirements for on-call consultant services for bridge inspection, evaluation, structural analysis, and design of retrofits/repairs for the Ada County Highway District (ACHD). It specifies qualifications for consultants, including licensure as a Professional Engineer in Idaho with at least five years of relevant experience. The document emphasizes expertise in bridge inspections, load rating analysis, bridge management programs, special investigations, and design of rehabilitation techniques and retrofits/repairs.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for C10 Stormwater Quality - ESC Statement of Work: This Statement of Work (SOW) dated 5/10/2024 outlines the requirements for on-call consultant services for stormwater quality focusing on erosion and sediment control. Ada County Highway District (ACHD) seeks consultants to assist with construction site stormwater runoff control plan review and inspection to support implementation of ACHD's National Pollutant Discharge Elimination System (NPDES) permits covering Boise, Garden City, Meridian, Eagle, and urbanized unincorporated Ada County. The SOW specifies qualifications including a Bachelor's degree, five years of experience, Boise City training certification, and CPESC certification or commitment to obtain it. Key tasks include erosion and sediment control plan review, stormwater pollution prevention plan review, and construction site inspections.
PDF
PDF, High priority: read this first3 pages · sow
HighAI Summary for C1-5a Environmental Services Statement of Work: This document is a Statement of Work (SOW) for On-Call Environmental Services, revised on 5/10/2024. It outlines the scope and minimum qualifications for consultants in various environmental service categories including Environmental Report Documentation and Management, Wetlands, Biological Studies, Archaeological/Cultural, and Hazardous Materials/Waste. Each category specifies required experience, educational background, and key tasks such as NEPA compliance, wetland delineation, endangered species assessments, cultural resource evaluations, and hazardous site investigations. The document serves as a guideline for consultants to declare their qualifications and submit relevant documentation for procurement consideration.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for C6 Wastewater Management Statement of Work: This Statement of Work (SOW) dated 5/10/2024 outlines the requirements for on-call consultant services in the areas of wastewater management, solid waste management, and hazardous materials management under category C6. Consultants must declare the specific service(s) they are submitting qualifications for, including wastewater facility evaluation, monitoring, solid waste management, and hazardous materials management. Minimum requirements include an Idaho Professional Engineering license and at least five years of relevant experience.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for C7 Stormwater Quality Monitoring Statement of Work May 2024: This Statement of Work (SOW) dated May 10, 2024, outlines the requirements for on-call consultant services to support Ada County Highway District's stormwater quality monitoring program. The consultants will assist in implementing aspects of two National Pollutant Discharge Elimination System (NPDES) permits covering Boise, Garden City, Meridian, Eagle, and urbanized unincorporated Ada County. Key tasks include wet weather stormwater monitoring, sample collection with rapid mobilization, equipment maintenance, wet weather forecasting, preparation of monitoring and quality assurance plans, analytical reporting, BMP and Green Stormwater Infrastructure monitoring, pollutant loading evaluation, and groundwater quality monitoring. Consultants must have a minimum of a Bachelor's degree and five years of relevant experience, with local expertise emphasized.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for C8 Stormwater Quality Program Development and Assessment SOW May 2024: This Statement of Work (SOW) dated May 10, 2024, outlines the requirements for on-call consultant services for the Stormwater Quality – Stormwater Management Program Development and Assessment under category C8. Ada County Highway District (ACHD) seeks consultants with at least five years of experience and a related Bachelor of Science degree to assist with stormwater management program control measures and pollution reduction activities. The services support implementation of ACHD's two National Pollutant Discharge Elimination System (NPDES) permits covering Boise, Garden City, Meridian, Eagle, and urbanized unincorporated Ada County. Key tasks include program assessment, pollutant loading evaluation, Total Maximum Daily Load analysis, watershed planning, policy development, and pollution prevention.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for C9 Stormwater Quality Green Stormwater Infrastructure SOW: This Statement of Work (SOW) dated 5/10/2024 outlines the requirements for on-call consultant services to support Ada County Highway District's Green Stormwater Infrastructure (GSI) program. Consultants are sought with expertise in stormwater quality and GSI to assist in implementing aspects of two National Pollutant Discharge Elimination System (NPDES) permits covering Boise, Garden City, Meridian, Eagle, and urbanized unincorporated Ada County. Required qualifications include a relevant Bachelor's degree, professional engineering or landscape architecture license, and at least five years of experience in GSI. The SOW details five service areas including design of vegetated GSI, constructed stormwater wetlands, permeable pavements, stormwater tree cells, and development of GSI BMP policy and guidance.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for D2a Signal Timing Statement of Work: This document is a Statement of Work (SOW) for Traffic Signal Timing under the ACHD On-Call Consultant Services Procurement, revised on 5/10/2024. It outlines the consultant services required to prepare signal timing and coordination plans for transportation corridors, including the use of Synchro 10 software for optimized signal timing. The SOW includes development of final reports documenting travel time reductions, fuel savings, and benefit/cost ratios. It also covers reviewing and adjusting traffic signal performance measures to optimize corridor performance. The document recommends teaming with firms having expertise in signal timing if consultants lack this specialization.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Fa-Geotech_Services_SOW - Geotechnical Services Statement of Work: This document is a Statement of Work (SOW) for Geotechnical Services issued by Ada County Highway District (ACHD) dated 5/10/2024. It outlines the scope of on-call consultant services for roadway projects including geotechnical borings, soil analysis, testing, pavement design, and documentation per ACHD and ITD standards. The SOW specifies minimum requirements such as WAQTC Certified Laboratory and licensing in the geotechnical field. The selected consultants must provide in-house laboratory testing and ongoing construction testing services.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Ga-Surveying Statement of Work for On-Call Consultant Services: This document is a Statement of Work (SOW) dated 5/10/2024 for on-call surveying consultant services by the Ada County Highway District (ACHD). It outlines the need for professional surveyors licensed in Idaho to support capital project design, right-of-way acquisition, and construction surveying for transportation facilities. The SOW specifies required services including project control surveys, boundary determination, topographic data collection, and legal descriptions for right-of-way. Surveyors must demonstrate relevant experience within the last five years. The document serves as a basis for evaluating proposals for contractual surveying services.
PDF
PDF, Low priority1 page · proposal-structure
LowAI Summary for Sample Proposal Structure for Firm Applying in Three Categories: This document outlines a sample proposal structure for a firm applying in three categories and/or sub-categories. It includes sections such as Title/Cover Page, Key Personnel, Summary Resumes, Firm History & Organization for Category/Sub-Category 1, Understanding of Service Category Requirements, Relevant Project Descriptions, and Control Procedures. The structure is organized into chapters covering these topics for each category or sub-category.
The Ada County Highway District (ACHD) conducts a formal procurement once every three years to establish its On-Call Consultant Services (OCCS) List. In June of 2021, ACHD issued a Request for Qualifications (RFQ) and established the 2022-2024 OCCS List. The OCCS List became effective on October 1, 2021 and will terminate on September 30, 2024.Given this background, ACHD is requesting a Statement of Qualifications (SoQ) from firms interested in providing professional and other services on an on-call, as-needed basis for the 2025-2027 OCCS List to become effective on October 1, 2024 and will terminate on September 30, 2027.Respondent firms deemed qualified will be selected to perform work in each of the following categories:A. Design: Roadway with Estimated Values under $300,000 and over $300,000; Bridge; Intersection/Signal; Roundabouts; and Landscape Architecture Design.B. Bridge Inspection, Evaluation, Structural Analysis, and Design of Retrofit/Repairs.C. Environmental Services: Environmental Report Documentation and Management, Wetlands, Biological Studies, Archaeological/Cultural, Hazardous Material/Waste, Wastewater Management, Facility Design, and Solid Waste Management. In addition, Stormwater Quality – Monitoring, Stormwater Management Program Development and Assessment, Green Stormwater Infrastructure, and Erosion and Sediment Control.D. Traffic Signal Timing.E. Construction Inspection.F. Geotechnical Services.G. Surveying.H. Transportation Planning and Projects.I. Public Involvement and Outreach.Firms interested in this project must submit a SoQ electronically through the OpenGov online portal. All firms are required to submit an electronic response for the overall On-Call Consultant Services project, and submit the same PDF electronic response for each category. Failure to submit an electronic response for the overall On-Call Consultant Service project may result in any individual category submissions being deemed non-responsive.Submittal requirements:▪ Submittals must be uploaded to the OpenGov website by the submittal due date and time.▪ Submit one combined PDF, to the overall On-Call Consultant Service project that addresses all requirements.▪ Submit the same one combined PDF SoQ for each category . See the CATEGORY LIST.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award