Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Grayson Road Resurfacing Program

Closed
PE-66984-NONST-2026-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to the 2025 Grayson Road Resurfacing Program in Georgia, involving extensive roadway improvements such as milling, asphalt overlay, restriping, curb and gutter installation, storm pipe cleaning, sidewalk repair, sinkhole patching, and crosswalk restriping across multiple locations including Rocksprings Road, Glenns Farm Way, Windsor Creek Drive, and S.R. 84 frontage at 993 Grayson Parkway. The project aims to enhance roadway safety and infrastructure within a 60-day completion window, with the work scope clearly defined through quantities and specifications for each segment. Bids are to be submitted as lump sum proposals, with the lowest responsible bidder awarded the contract, which is anticipated to be finalized in mid-November 2025. The procurement process requires a sealed bid, a 5% bid bond or cashier’s check, and adherence to strict submission guidelines, including no conditional bids or alterations to the bid form. The project is overseen by the City of Grayson, with primary contact Kathy Barker from Precision Planning, Inc., who manages bid requests and inquiries. The contractual framework emphasizes standard bid submission and security requirements but does not incorporate specific federal or state clauses such as FAR provisions, performance bonds, or quality assurance clauses. The documents do not specify detailed inspection, acceptance, or administrative procedures, nor do they reference attachments, technical specifications, or referenced standards beyond the scope outlined in the main project description. The award is based solely on the lump sum bid, with no additional evaluation criteria or technical ratings specified. Administrative details such as payment offices, invoicing procedures, or contract management personnel are not explicitly provided in the available documentation. Overall, the contract is structured as a straightforward, price-driven project with clear scope, strict bid submission protocols, and a focus on local compliance within Georgia’s regulatory environment.

General Info

Agency

Georgia → GRAYSON, CITY OF

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

2025 Grayson Road Resurfacing Program Advertisement for Bids

PDF, High priority: read this first2 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66984 GRAYSON, PE-66984-NONST-2026-000000004 to PE-66984-NONST-2026-000000004.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → GRAYSON, CITY OF
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → GRAYSON, CITY OF
Office AddressN/A

Full Description

Show more
The project consists of milling, final coat of asphalt topping, restriping, adding curb & gutter, cleaning storm pipe, and sidewalk repair along Rocksprings Road. The project also consists of patching and leveling a sinkhole on Glenns Farm Way, and edge milling, final coat of asphalt topping, and restriping the entrance to Windsor Creek Drive. The project also consists of restriping an existing crosswalk along S.R. 84 at the Windsor Place Circle intersection, and the installation of sidewalk along S.R. 84 across the frontage of 993 Grayson Parkway.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS