2025 Partial Re-roofing of Chequamegon South Campus

Closed
202501State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 238160
New
Federal
Fenn Ranger Station roofing replacement
Solicitation # 1240LU26Q0130
Solicitation 1240LU26Q0130 is a firm fixed price contract for the Nez Perce-Clearwater National Forest to replace the cedar shake roofs on the Bunkhouse and Cookhouse at the Fenn Ranger Station in Kooskia, Idaho. This total small business set-aside under NAICS 238160 requires the contractor to provide all labor and materials, including 16-inch No. 1 Red Cedar premium grade shingles, underlayment, and weatherproofing. The project emphasizes maintaining the historical integrity of the structures and requires all roofing materials to be sourced from a single manufacturer for consistency. Old materials must be disposed of off-forest in accordance with state and federal laws. The award will be based on the best value, weighing technical criteria and price approximately equally. Technical evaluation factors include past performance, a proposed schedule, experience in cedar shingle roofing, and the technical approach. The period of performance is ten days after the notice to proceed, with a final delivery date not later than November 15, 2027. Key requirements include a payment bond for 100 percent of the award price, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Quotes must be submitted to the primary point of contact by November 5, 2026, and must include a completed SF 1442, price schedule, past performance questionnaire, and a written technical approach.
Nez Perce-Clearwater Nfs

POSTED

about 6 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Chequamegon School District is initiating a project for partial re-roofing at the Chequamegon South Campus, specifically targeting Roof Areas 6 and 8 located at 420 9th Street North, Park Falls, WI. This endeavor aims to replace the existing roofing materials with a ballasted EPDM roofing system, which is expected to enhance the structural integrity and durability of the school facilities. Oversight of the project is provided by Mr. Kevin Schuelke, the Maintenance Supervisor. The work primarily involves removing and disposing of existing materials such as the EPDM roof membrane, flashings, accessories, metal fascias, and copings. A Carlisle Sure-Seal Design 'B' Loose Laid Ballasted Roofing System or an equivalent will be installed using a .060” non-reinforced EPDM membrane, along with new metal fascias and copings. Existing stone ballast may be reused unless the roof insulation is found to be damaged or wet. Additional tasks include installing 3” of R-17 insulation across all roofs and ensuring a minimum of an 8-inch finished flashing height at rooftop equipment locations. The project also requires the installation of new wood nailers where needed and adherence to warranty requirements covering both labor and materials. Contractors are expected to meet specified insurance requirements, including worker’s compensation and liability coverage. The project is scheduled for substantial completion by August 22, 2025, with bids due by January 8, 2025, at 8:30 AM CST. The re-roofing work will take place at Chequamegon High School, reinforcing the infrastructure and ensuring it meets modern standards for safety and efficiency.

General Info

Chequamegon School District plans partial re-roofing with EPDM system by August 2025.

Place of Performance

WI, USA

Set-Aside

NONE

Documents

1

2025 CSD Roof Project - Areas 6 & 8

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Chequamegon School District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The project generally consists of removal and disposal of existing roofing materials including: existing EPDM roof membrane, EPDM flashings, EPDM accessories, metal fascias, metal copings and installing a new Carlisle Sure-Seal Design B Loose Laid Ballasted Roofing System, or equivalent, utilizing .060” non reinforced EPDM membrane in conjunction with EPDM accessories and new metal fascias and copings. The existing roof insulations are intended to remain in place, providing they are not damaged and are dry. Existing stone ballast may be reused. Refer to attached Roof Plan for designated roof areas to be re-roofed. Project should include additional 3” of R-17 insulation on all roofs.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS