Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Pump and Well Repairs

Closed
63State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves comprehensive pump replacement and repair services at multiple water stations within the City of Vancouver, Washington. The scope includes labor, tools, appliances, materials, and equipment necessary for tasks such as motor inspection and repair at Well 8, as well as the installation and servicing of 4-stage vertical turbines at Wells 7 and 12. Additionally, the project requires the removal and disposal of motors and well pumps at Wells 3 and 5. The work must be physically completed within 60 working days from the issuance of the Notice to Proceed, with an estimated project cost of $200,000. The solicitation, titled "2025 Pump and Well Repairs," was posted on September 17, 2025, with a response deadline of October 7, 2025. It is managed under NAICS code 237110, indicating general water and sewer line and related structures construction. The project is overseen by the City of Vancouver's procurement services, with Mark Nowak serving as the primary contact. The contract aims to ensure reliable water station operations through timely and efficient pump and well repairs, supporting the city's infrastructure maintenance efforts. More details can be accessed through the city's procurement portal.

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Vancouver
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This project includes all labor, tools, appliances, materials, and equipment for pump replacement and/or repair work and televising the following: Water Station 1, Well 8 – 250 HP - Motor inspection and repair Water Station 1, Well 7 – 4 Stage Vertical Turbine Water Station 1, Well 12 – 4 Stage Vertical Turbine Water Station 1, Well 3 – Motor & Well Pump Removal/Disposal Water Station 1, Well 5 – Motor & Well Pump Removal/Disposal The Contract Work shall be Physically Complete within 60 Working Days from the Notice to Proceed. Engineer's Estimate - $200,000

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS