This Solicitation opportunity from Pennsylvania was posted on July 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Sealed bids for the 2026 Water Main Replacement, Contract No. W-57, are being solicited by the Municipal Authority of the Borough of Morrisville in Bucks County, Pennsylvania, with submissions required electronically through PennBidTM by 9:00 AM on June 18, 2026. The project involves the installation of a 6-inch ductile iron water main over 2,500 linear feet, along with 60 water services, six fire hydrants, six wet taps, connections to existing mains, and removal of existing valve boxes and hydrants. The contractor is responsible for all labor, equipment, supervision, and transportation, as well as trench, curb, sidewalk, and asphalt restoration, while the Authority will supply the main pipe materials except for tapping valves and sleeves, which the contractor must provide. Bids must include a certified check or bond equal to at least 10 percent of the bid amount, issued by a company licensed to do business in Pennsylvania, and remain irrevocable for 60 days after submission. The award will go to the lowest responsible bidder, with pass/fail criteria requiring the bidder or subcontractor to have completed at least three similar projects, each valued at no less than 75 percent of this contract’s estimated value. All proposed work must comply with OSHA safety standards, prevailing wage laws, and applicable state statutes including the Steel Products Procurement Act, Act 287, and Act 127. Contractors must obtain and submit all required permits and certifications, furnish performance, labor and materials, and maintenance bonds at 100 percent, 100 percent, and tiered amounts up to 25 percent of the first $200,000 and 10 percent thereafter for amounts exceeding $200,000, with bond durations extending one to two years past final acceptance. Payment is based on measured work performed, authorized by the Engineer, using unit prices from the certified Tabulation of Bids, with monthly invoicing requiring detailed documentation, original receipts, and sworn affidavits. The project must be completed within 60 consecutive calendar days following official notice to proceed. All bidders must conduct a site visit, submit bids exclusively through PennBidTM without exception, and may be required to provide original signed documents within three days of bid opening. Bidders operating under fictitious names or foreign corporations must be registered in Pennsylvania and submit verified financial statements and experience
General Info
Morrisville seeks electronic bids for 2026 Bucks County water main replacement, due June 18.
HighAI Summary for 01025 - Measurement and Payment - Addendum 1: This document is Addendum 1 to Section 01025 titled 'Measurement and Payment.' It outlines payment terms for various construction items under the contract, specifying unit prices and what each price includes. Items covered include installation of ductile iron pipe water mains, copper services, fire hydrant assemblies, wet taps, connections to existing mains, and removal of valve boxes and hydrants. The addendum details the scope of work, materials, labor, equipment, permits, testing, and other incidental items included in the payment. It serves as a contractual amendment clarifying payment measurement and conditions for the project.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 2025 Water Main Replacement Manor Park Contract No. W-54: This document is the Request for Bid (RFB) for the 2025 Water Main Replacement project at Manor Park, Contract No. W-54, issued by The Municipal Authority of the Borough of Morrisville, Bucks County, Pennsylvania. It includes the advertisement, instructions to bidders, forms of bid and guaranty, general and special conditions, construction specifications, form of agreement, bonds, contract drawings, and standard details. The document outlines bid submission procedures, bid security requirements, contract conditions, and technical specifications for the project. Bids are to be submitted electronically via PennBid by August 7, 2025, with a bid bond or certified check of at least 10% of the bid amount. The document is prepared by Pennoni Associates and includes detailed contract terms and construction requirements.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 2026 Water Main Replacement Contract No. W-57 - Construction Specifications and Bid Instructions: This document is the solicitation package for the 2026 Water Main Replacement project, Contract No. W-57, issued by The Municipal Authority of the Borough of Morrisville, Bucks County, Pennsylvania. It includes the advertisement for bids, instructions to bidders, forms of bid and guaranty, general and special conditions, construction specifications, form of agreement, bonds, contract drawings, and standard details. Bids are to be submitted electronically via PennBid by June 18, 2026, with a bid bond or certified check of at least 10% of the bid amount required. The document outlines bidder responsibilities, submission procedures, and contract terms, providing comprehensive guidance for prospective contractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 Water Main Replacement Contract No. W-57 Plans: This document contains the detailed engineering plans for the 2026 Water Main Replacement project under Contract No. W-57, prepared for the Municipal Authority of the Borough of Morrisville. It includes a location map, a comprehensive sheet list with site plans, intersection details, and track profile views. The plans are issued for bid and specify that permanent substitution of existing materials is prohibited. The document serves as a critical technical specification for the project, providing layout and construction details necessary for bidding and execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 for KTC Sanitary Treatment Plant Pump Upgrades: This document is Addendum No. 2 issued in September 2025 for the KTC Sanitary Treatment Plant Pump Upgrades project by Morrisville Municipal Authority. It supplements the original contract documents with clarifications and additions, specifically adding specification 15061 for Stainless Steel Pipe. The addendum details materials, components, fabrication, and standards for stainless steel piping, including pipe types, fittings, joints, and hardware requirements. It instructs bidders to consider these changes in their proposals and acknowledges the project scope remains unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 - 2026 Water Main Replacement - Morrisville Municipal Authority: Addendum No. 1 for the 2026 Water Main Replacement project issued by Morrisville Municipal Authority on June 12, 2026. This document provides supplemental data amending the contract documents, including clarifications on owner-supplied materials, contractor responsibilities, coordination requirements, insurance mandates, and revisions to project plans such as pipe sizes and fittings. It also includes responses to bidder questions and updated technical details essential for bid preparation and project execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 - Morrisville Municipal Authority 2025 Water Main: Addendum No. 1 for the Morrisville Municipal Authority 2025 Water Main project issued on August 1, 2025. This document amends the contract documents with supplemental data including owner-supplied materials, coordination requirements for system shutdowns, revised plans for water service locations, and updates to the bid form adding line items for paving restoration and added valve. It also details payment terms for these new items and incorporates responses to bidder questions posted on PennBID. The addendum must be acknowledged in proposals and considered in bid preparation.
PDF
PDF, High priority: read this firstaddendum
HighAI Summary for Addendum No 1 - Water Main Plans MORAM00578: This document is Addendum No 1 for the Water Main Plans related to project MORAM00578 dated 2025-05-20. It includes updated location maps and detailed drawings at scales 1"=1000' and 1"=30'. The addendum appears to cover multiple sheets (4 and 5 of 9) with annotations and approvals noted, indicating revisions or additions to the original project plans.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Bid Form Addendum 1 - Water Main Project: This document is Bid Form Addendum 1 for a water main construction project. It includes a detailed bid schedule with item numbers, estimated quantities, and descriptions for base bid items such as 6-inch water main, water services, fire hydrant assemblies, wet taps, and various restoration works. It also includes an add alternate for mill and overlay work. The form requires bidders to have completed at least three similar projects, each at least 75% of the proposed contract amount, and to provide reference projects. The contract award will be based on the lowest dollar amount for any combination of base bid and add alternates, with the owner reserving the right to eliminate add alternates based on funding.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Keystone Trade Center River Pump Station Low Lift Pump Upgrades Plan Set June 2025: This document is the plan set for the Keystone Trade Center (KTC) River Pump Station Low Lift Pump Upgrades, prepared for Morrisville Municipal Authority, dated June 2025. It includes mechanical and electrical sheet lists, construction and demolition notes, and detailed drawings for pump and gate removals and installations. The plan set provides technical specifications and construction instructions necessary for bidding and execution of the mechanical and electrical contracts (KTC-S-02M and KTC-S-02E). The document is essential for contractors to understand the scope, sequencing, and technical requirements of the pump station upgrade project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KTC River Pump Station Low Lift Pump Upgrades Contract Specifications: This document contains the construction specifications for the KTC River Pump Station Low Lift Pump Upgrades, Contract Nos. KTC-S-02M (Mechanical) and KTC-S-02E (Electrical), prepared by Pennoni Associates Inc. dated June 2025. It includes detailed sections such as advertisement, instructions to bidders, forms of bid and guaranty, general and special conditions, construction specifications, forms of agreement and bonds, contract drawings, and appendices. The document outlines bidder responsibilities, bid submission instructions via PennBid™, contract conditions, insurance requirements, wage rates, and detailed technical specifications across multiple divisions including sitework, concrete, metals, finishes, equipment, mechanical, and electrical work. It also specifies a non-mandatory preconstruction meeting and bid bond requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for KTC STP Influent Pump Improvements Addendum 1 Plan Set: This document is an addendum plan set for the KTC STP Influent Pump Improvements project, contract numbers KTC-S-03M and KTC-S-03E, prepared for Morrisville Municipal Authority in Bucks County, PA, dated July 2025. It includes detailed mechanical and electrical sheets covering general notes, demolition plans, structural details, architectural plans, HVAC plans, and pump station details. The document also contains specifications for door hardware sets and glazing systems. It serves as an amendment providing updated technical drawings and specifications essential for construction and contractor responsibilities, including locating underground utilities and compliance with PA Act 287 of 1974.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KTC STP Influent Pump Improvements Demolition Notes Issued for Bidding: This document titled 'KTC STP Influent Pump Improvements' dated 7.18.2025 contains demolition notes issued for bidding. It details the demolition scope including sewer, water, steam piping, valves, supports, instrumentation hangars, stands, HVAC, duct work, pumps, motors, and catwalks removal. It specifies that bypass plans must be approved and active before demolition, and structural columns and beams remain unless indicated otherwise. The document serves as technical specifications for demolition work as part of the project bid package.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for KTC WWTP Influent Pump Station No. 1 Improvements Construction Specifications and Bid Documents: This document is the construction specifications and bid package for the KTC WWTP Influent Pump Station No. 1 (PS-Y) Improvements, Contract Nos. KTC-S-03M and 03E, prepared by Pennoni Associates Inc. dated July 2025. It includes advertisement, instructions to bidders, forms of bid and guaranty, general and special conditions, construction specifications, form of agreement, bonds, contract drawings, and standard details. The document outlines the scope of work, bidding instructions, contract conditions, and technical specifications for the project located in Morrisville, Bucks County, Pennsylvania. Bids are to be submitted electronically via PennBid by August 5, 2025, with a non-mandatory preconstruction meeting scheduled for July 29, 2025.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for MORAM12002 Addendum 1 for River Pump Station Low Lift Pump Upgrades: Addendum No. 1 issued on July 28, 2025, for the Morrisville Municipal Authority River Pump Station Low Lift Pump Upgrades project. This amendment revises contract documents to include relocation of controls equipment to a prefabricated building, updates to mechanical and electrical specifications, and changes to bid forms. Key modifications include addition of a USEMCO control building, updated drawing sets, new specification sections for control building, aluminum grating, site lighting, and lightning protection systems. Mechanical scope now includes installation of the prefabricated building and associated equipment, while electrical scope reflects coordination with mechanical contractor furnished equipment. Vendor Q&A responses are incorporated. Excavated material disposal and other site work details are also addressed.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for MORAM12002 Addendum 2 for River Pump Station Upgrades: Addendum No. 2 issued on July 30, 2025, for the Morrisville Municipal Authority River Pump Station Low Lift Pump Upgrades project. This amendment modifies contract documents including replacement of sheets D-2003 and D-3001 with updated plans, revision of Table 1 in Section 11160 Stainless Steel Sluice Gates, and incorporation of Pre-bid Meeting Minutes. The document provides detailed sluice gate schedules, project scope, prevailing wage requirements, and coordination instructions for bidders. It supplements the original solicitation with critical technical and procedural updates for proposal preparation.
XLSX
XLSX, High priority: read this firstpricing-section
HighAI Summary for Pricing Section BT-19BC: This document is the Pricing Section for contract BT-19BC, containing detailed bid pricing information from multiple vendors including Brendan Stanton Inc., PKF-Mark III, Inc., Pact Two, LLC, and Wiremen Electric Inc. It includes unit prices, total costs, and quantities for various line items such as mobilization, demolition, installation, and electrical work. The document highlights lowest bid prices and selected items with color-coded cells. The pricing data is essential for evaluating vendor bids and making award decisions.
XLSX
XLSX, High priority: read this firstpricing-section
HighAI Summary for Pricing Section BT-69CR: This document is the Pricing Section for contract BT-69CR, containing detailed cost breakdowns from multiple vendors for various line items related to mobilization, demolition, installation, and electrical work. It includes unit prices, total costs, and quantity required for each item, highlighting the lowest bids and selected items with color-coded cells. The pricing data is essential for evaluating vendor proposals and making award decisions.
XLSX
XLSX, High priority: read this firstpricing-section
HighAI Summary for Pricing Section BT-89KW: This document is the Pricing Section for contract BT-89KW. It contains detailed bid pricing information from multiple vendors including Earle Asphalt Company, Joao & Bradley Construction Co., Inc., Passerini & Sons, Inc., and RIII Construction Inc. The sheet lists various construction items with unit prices, quantities required, and total costs. It highlights the lowest prices and selected items using color-coded cells. The document is essential for evaluating vendor bids and determining the lowest and selected prices for contract line items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for PS #1 Addendum 1 - Morrisville Municipal Authority KTC Influent Pump Station Improvements: Addendum No. 1 issued on August 18, 2025, for the Morrisville Municipal Authority KTC Influent Pump Station No. 1 Improvements project. This amendment replaces the previously posted incomplete plans and specifications with a complete reissued set. It includes revised bid forms and extends the bid due date to September 9, 2025. The addendum also provides prebid meeting minutes from July 29, 2025, detailing project scope, prevailing wage requirements, and coordination instructions. Key modifications include demolition and installation work for mechanical and electrical systems, temporary bypass setup, and architectural improvements. Bidders must acknowledge this addendum in their proposals.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for PSY Technical Specifications Addendum 1 for KTC PS1 Pump Station Upgrades: Addendum 1 to the technical specifications for the KTC PS1 Pump Station Mechanical/Electrical Upgrades project by Morrisville Municipal Authority. This document, dated as the first addendum, includes detailed divisions covering general requirements, pump station work, concrete, metals, finishes, equipment, mechanical and plumbing, and electrical work. It outlines contractor responsibilities, permitting, contract types, codes and standards, work sequence, and construction limits. The addendum clarifies the scope for both mechanical and electrical contracts, including reference to contract drawings and specifications. It emphasizes the importance of maintaining facility operations and coordination between contractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Technical Specifications for KTC PS1 Pump Station Mechanical/Electrical Upgrades: This document contains the technical specifications for the KTC PS1 Pump Station Mechanical and Electrical Upgrades project by Morrisville Municipal Authority. It includes a detailed table of contents covering general requirements, site work, concrete, metals, finishes, equipment, mechanical, and electrical divisions. The specifications outline contractor responsibilities, permitting, contract types, codes and standards, work sequence, and construction limits. It is a multi-prime project with separate mechanical and electrical contracts, emphasizing the need to keep the sanitary treatment plant operational throughout the work. The document serves as a comprehensive guide for contractors to ensure compliance with all technical and regulatory requirements for a complete and operational facility.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for KTC Low Lift River Pump Bid Tabulation: This document is a bid tabulation for the KTC Low Lift River Pump project. It includes detailed line items for mechanical and electrical base contract work, such as mobilization, demolition, installation, and furnishing tasks. Each item is listed with quantity, type, and total price columns, although specific prices are not provided in the excerpt. The document serves to summarize bids received for various components of the project.
PDF
PDF, Low priorityphoto-log
LowAI Summary for KTC River Pump Station Low Lift Pump Upgrades Appendix A Photo Log: This document is Appendix A, a Photo Log for the KTC River Pump Station Low Lift Pump Upgrades project by Morrisville Municipal Authority in Morrisville, PA. It contains photographic documentation of various site components including general site views, existing pumps, existing screens, control building, basin 1, and electrical references. The photo log serves as a visual record to support the project documentation.
PDF
PDF, Low priorityother
LowAI Summary for MORAM00578 Manor Park Location Map: Document titled MORAM00578 Manor Park dated 2025-05-20 contains location maps with scales 1"=1000' and 1"=30'. It includes project identification and drawing approval information but lacks solicitation or contract details.
Ref. #: The Municipal Authority of the Borough of Morrisville, Bucks County The Municipal Authority of the
Borough of Morrisville
35 Union Street
Morrisville, PA 19067 Sealed bids will be received electronically through PennBidTM by The Municipal Authority of the Borough of Morrisville for “2025 Water Main Replacement - Manor Park”, Contract No. W-54 until 10:00 o'clock AM, prevailing time, on the 7th day of August 2025 at which time they will be publicly read at the Municipal Authority of the Borough of Morrisville office, 35 Union Street, Morrisville, PA 19067. All documents and solicitation details are available anytime at PennBidTM (https://pennbid.bonfirehub.com). Click on the “Solicitations” and “View” tabs. The Scope of Work for these projects is available through PennBidTM. Owner will purchase all water system materials under separate contract. Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the state where the Owner is located will be accepted and the bond shall so state same. Bids must be submitted unconditionally. No bidder may withdraw bid within SIXTY (60) days after the scheduled closing time for receipt of bids. The Owner reserves the right to waive any informalities, or to reject any or all bids.
John J. Warenda Jr.
Executive Director
More opportunities from Pennsylvania → Bucks County