Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on July 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Water Valve Replacement

Closed
95State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Winooski, Vermont, is soliciting bids for the 2025 Water Valve Replacement project, identified as solicitation number STR-26-01. The scope of work involves the procurement and installation of three 8-inch gate valves along with associated ductile iron fittings and appurtenances, which must be connected to an existing 6-inch cast iron main located at the intersection of Franklin Street and George Street. Due to the necessity of a water service shutdown, the installation must be completed within a single day, with the Winooski Department of Public Works providing a supporting role. The project is subject to strict timelines, with a substantial completion deadline of Tuesday, August 26, 2025, and a final completion deadline of Friday, August 29, 2025. Interested parties must submit sealed bids by the deadline of July 23, 2025, though some documentation notes a submission cutoff of July 25, 2025, at 1:00 pm. A non-mandatory pre-bid conference is scheduled for July 16, 2025. All inquiries and bidding documents are managed by the project engineer, Ryan Lambert.

General Info

Winooski bids for 2025 water valve replacement at Franklin and George Street.

Documents

1

C-111-2018 Advertisement for Bids - 2025 Water Valve Replacement

PDF, High priority: read this firstadvertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → City of Winooski
Contacts1 person available
OfficeN/A
Organization / AgencyVermont → City of Winooski
Office AddressN/A
Contacts

Full Description

Show more
The Project includes the following Work: Procurement and installation of three 8-in gate valves and associated ductile iron fittings and appurtenances, and connection to existing 6-in cast iron main at the intersection of Franklin Street and George Street. Work will require shutdown of water service, and therefore, the installation shall be completed in one day. Winooski DPW will provide a supporting role in the Work. Refer to Bidding Documents for full description of Work. The Project has a Substantial Completion deadline of Tuesday, August 26, 2025, and a Final Completion deadline of Friday, August 29, 2025.Click here to download the full details and instructionsView this listing on the Vermont Bid Registry

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS