This Solicitation opportunity from Iowa was posted on February 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026-27 Core Switch Refresh - Estherville Lincoln Central Sd
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Estherville Lincoln Central SD is seeking competitive bids for a core networking hardware refresh for Funding Year 2026. The project focuses on a chassis-only replacement of existing HPE/Aruba modular switches to maintain compatibility with current interface modules and SFP+ transceivers. The required equipment includes three 5406R zl2 switches, three 5412R zl2 switches, management modules, power supplies, and one 8-port SFP+ MACsec v3 module. Only new equipment is permitted, and while equivalents may be considered, there is a strong preference for HPE/Aruba hardware. The selected vendor will be responsible for the de-installation of old chassis, the migration of existing blades into new units, configuration to match current environment settings, and final deployment to ensure 10 Gbps backbone connectivity. Bidders must provide itemized pricing and demonstrate E-Rate compliance, including a valid SPIN. An on-site visit is strongly recommended and will be weighted positively during evaluation. Proposals must be submitted to Kevin Richardson by 9:00am CST on March 18, 2026, with pricing remaining firm through September 30, 2027.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- MSA-120 WorkstationsOpen now, due in 3 days
- M00P7602800 - ShareGate RenewalOpen now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The District currently utilizes HPE/Aruba modular switches. To maximize existing investments, the District intends to reuse all existing interface modules (blades) and SFP+ transceivers. This bid is specifically for the replacement of the physical chassis units, power supplies, and management components.
While equivalent solutions will be considered, the District prefers HPE/Aruba to ensure hardware-level compatibility with existing modules, operational continuity, and configuration familiarity.
Equipment: QTY: 3 J9821A - HPE Aruba Networking 5406R zl2 Switch - or equivalent QTY: 3 J9822A - HPE Aruba Networking 5412R zl2 Switch - or equivalent QTY: 2 J9827A - HPE Aruba Networking 5400R zl2 Management Module - or equivalent QTY: 12 J9830B - HPE Aruba 2750W PoE+ zl2 Power Supply - or equivalent QTY: 1 J9993A - HPE Aruba Networking 8-port 1G/10Gbe SFP+ MACsec v3 zl2 Module or equivalent Vendor Scope of Work (Professional Services) * De-installation: Vendor will safely remove the old modular chassis from the racks. * Migration: Vendor will extract existing modules (blades) from the old units and professionally install them into the new modular chassis. * Configuration: Vendor must program the new chassis to match current environment settings (VLANs, routing protocols, security policies, etc.). * Deployment: Complete physical installation and testing to ensure 10 Gbps backbone connectivity is restored to all rack rooms.
Mandatory On-Site Visit Due to the technical requirement of migrating existing modules into new hardware, the District strongly recommends an on-site visit to verify current module models, rack space, and power requirements. Contact: Kevin Richardson at •••••@•••••.•••Sign up to see this detail to schedule.
Evaluation: Bidders who complete an on-site visit will be awarded additional points on the bid evaluation matrix.
Bidder Requirements Itemized Proposals: Costs must be broken down by: * Chassis * Power Supplies * Management Modules * Specific 8-port SFP+ module * Professional Services (Installation/Configuration). * Shipping and Handling fees E-Rate Compliance: Bidders must provide a valid SPIN, certify compliance with FCC Order 19-121, and indicate if they support the Service Provider Invoice (SPI) billing method.
Only New equipment will be accepted. Refurbished or "gray-market" hardware is strictly prohibited.
Validity: Pricing must remain firm through September 30, 2027.
All purchases are contingent upon approval of E-Rate funding. The District reserves the right to reject any or all proposals.
All questions and proposals must be submitted via email to: Kevin Richardson - •••••@•••••.•••Sign up to see this detail.
The deadline for vendor proposals is 9:00am Central Standard Time on Wednesday March 18th, 2026. We reserve the right to reject late-submitted proposals. Proposals must be emailed to •••••@•••••.•••Sign up to see this detail.
Requested services (2 line items): - Category 2 — Internal Connections — Switches And Necessary Software And Licenses - Category 2 — Basic Maintenance Of Internal Connections — Switches
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260021485/132331/21172104-USAC_FCC_FORM_470_APPLICATION_260021485_CERTIFIED.pdf
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
