Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026-470-Mi Escuela Montessori

Closed
260014195

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 517111
New
Federal
Local SIP Hardware Modernization, Remote ESIP Upgrade, Legacy Voice Transition
Solicitation # FA4690-27-R-SIP1
The Department of Defense, through the 28th Contracting Squadron, is seeking sources for a turn-key Session Initiation Protocol (SIP) boundary hardware modernization and remote Voice Protection System (VPS) Enterprise SIP (ESIP) software implementation at Ellsworth AFB, SD. This small business set-aside project under NAICS 517111 involves a two-phase approach: the installation and configuration of DoDIN APL-certified hardware—including redundant Session Border Controllers supporting 115 Concurrent Call Paths, edge gateway routers, and managed PoE+ switches—interfacing with Avaya Aura Communication Manager Version 10.2, and the uninterrupted sustainment of 17 legacy circuits for approximately nine months during the parallel build-out. The project concludes with a zero-downtime cutover within a 30-day window and a 12-month total period of performance. Key requirements include the delivery of a 42U equipment cabinet in Building 4307 and the demonstration of 100% compliant GETS and E911 emergency call routing. Contractors must provide personnel with OEM certifications for Avaya Aura, SecureLogix, and SBC platforms, and all staff must undergo Tier 1 background investigations and OPSEC training. Compliance with supply chain security standards per RFO Subpart 40.2 and FAR Clause 52.240-91 is mandatory. Final acceptance by the Contracting Officer is contingent upon successful System Acceptance Testing, a 30-day burn-in period, and the delivery of four hours of administrative knowledge transfer to 28 CS technicians.
FA4690 28 Cons Pkc

POSTED

about 17 hours ago

DEADLINE

in 14 days
NAICS: 517111
New
Federal
Local SIP Voice Trunk Telecommunications Services (Base plus 4 Option Years)
Solicitation # FA4690-26-R-SIP2
Solicitation FA4690-26-R-SIP2 is a small business set-aside for the provision of continuous, monthly recurring commercial Local Session Initiation Protocol (SIP) Voice Trunk dialing and transport services for Ellsworth AFB, South Dakota. The contractor will deliver carrier-class SIP voice trunk telecommunications to the demarcation point in Building 4307, interfacing with the base Avaya Aura Communication Manager Version 10.2. The requirement includes the delivery of 115 Concurrent Call Paths (CCPs), 9,000 Direct Inward Dialing (DID) numbers, and full support for E911 geolocation and Government Emergency Telecommunications Service (GETS) priority dialing. Technical performance standards require network availability of at least 99.9 percent, one-way latency of 50ms or less, jitter of 20ms or less, packet loss under 0.1 percent, and a minimum Mean Opinion Score of 4.0. The contract is structured as a firm-fixed-price commercial utility service with a twelve-month base year and four consecutive twelve-month option years, with a potential six-month extension under FAR 52.217-8, totaling a potential duration of 66 months. Performance and billing will only commence upon formal government written acceptance of a successful 30-day cutover and testing period. The contractor must ensure all facilities and services comply with DoDIN APL certification standards and supply chain risk requirements per RFO Subpart 40.2 and FAR 52.240-91. Administration is handled by the 28th Contracting Squadron, with surveillance retained by the Contracting Officer and electronic invoicing processed via Wide Area Workflow. Maintenance personnel must adhere to strict base access and security protocols, including REAL ID compliance and the protection of Controlled Unclassified Information.
FA4690 28 Cons Pkc

POSTED

about 17 hours ago

DEADLINE

in 14 days
NAICS: 517111
New
SLED
Internet Access Services
Solicitation # MO27-47001-270000847
Montgomery County Public Schools is soliciting proposals for high-capacity Internet Access services to support approximately 255 sites. The requirement specifies fiber optic transport delivered to data centers in Rockville and Germantown, Maryland, with a base bandwidth of 60 Gbps scalable in 10 Gbps increments up to 500 Gbps. The contract includes an initial five-year term with five optional one-year renewals, with a target deployment date of July 1, 2027. Key technical requirements include Border Gateway Protocol support for IPv4/IPv6, 24x7x365 monitoring via a Network Operations Center, and automated DDoS protection. The agency seeks to maintain 99.99% uptime, backed by a comprehensive Service Level Agreement covering latency, packet loss, and mean time to repair. The primary evaluation factor for award is price, though MCPS will also consider technical suitability, compatibility with existing infrastructure, previous performance, and experience within K-12 environments. Awardees must adhere to strict cybersecurity standards, including third-party assessments such as SOC2 or ISO27001, and ensure all confidential data remains stored within the United States. Insurance requirements include five million dollars for cyber/privacy liability and one million dollars for professional liability. Proposals must be submitted electronically by November 25, 2026, including a detailed implementation plan and pricing provided in an Excel spreadsheet.
Montgomery County Public Schools

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 517111
New
Federal
Enterprise Customer Experience 2 (ECX) 2 - Request for Information (RFI)
Solicitation # 70SBUR27I00000002
The Department of Homeland Security, through United States Citizenship and Immigration Services (USCIS), has issued Request for Information (RFI) 70SBUR27I00000002 for the Enterprise Customer Experience 2 (ECX2) project. This is a recompete of contract 70SBUR22F00000252 and seeks to identify qualified vendors capable of designing, developing, and integrating a complete replacement enterprise contact center platform. The required solution must operate independently of the incumbent contractor's proprietary infrastructure, support approximately 18 million annual calls and chats, and enable 100 percent remote work capability across 18 physical locations. Key technical requirements include an omnichannel interface integrating voice, IP-TTY, web chats, email, SMS, and social media, as well as AI-enhanced IVR, intelligent virtual assistant chatbots, and Section 508-compliant dashboards. The government is utilizing this RFI to determine the appropriate contract vehicle and evaluate whether small business set-asides are appropriate. Interested respondents must provide a vendor profile detailing their business size, socioeconomic category, and existing government contract vehicles. USCIS is specifically seeking information on relevant experience from the past three years, consumption-based pricing models, and strategies for AI adoption and FedRAMP Moderate security compliance. Responses are due by November 12, 2026, and should be submitted via email to the contracting office. This RFI is for planning purposes only and does not constitute a formal solicitation or an invitation for bids.
USCIS Contracting Office(erbur)

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

Mi Escuela Montessori is seeking proposals for internet services and infrastructure for a new 57,000 square foot two-story facility in Bartow, Florida, planned for occupancy by June 2026. Category 1 requirements include quotes for fiber or equivalent internet connections with speeds ranging from 1Gbps to 5Gbps, including all installation, configuration, and build-out costs across various contract lengths. Category 2 requirements focus on internal connections and maintenance for the new construction. The school requests quotes for 20 to 35 wireless access points, four switches, six UPS units, and two to four equipment racks, along with the installation and configuration of these components. Additionally, the project requires 10,000 to 23,000 feet of Cat 6A cabling for approximately 100 to 115 runs. Proposals must include basic maintenance services for both new and existing equipment and must comply with FCC LCP and security rules. All bids must be submitted via email to the primary contact and consultant, including the vendor's SPIN and the 470 number.

General Info

Internet and infrastructure proposals for Mi Escuela Montessori facility in Bartow, Florida.

Place of Performance

Lakeland, FL, 33812, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Mi Escuela Montessori
Contacts2 people available
OfficeLakeland, FL, 33812, USA
Office AddressLakeland, FL, 33812, USA
Contacts
Kelly De La CruzPrimary Contact

Full Description

Show more
Category 1: Mi Escuela Montessori is planning on moving locations for the 2026-2027 funding year. Their new address will be: 1702 North Wilson Avenue, Bartow FL, 33830. They plan on being in this building by June 2026.
Mi Escuela Montessori would like quotes for 1+ connection for internet access, ranging in speed from 1+Gbps to 5Gbps or equivalent. Please provide quotes for fiber equivalent in addition to whatever other options you can offer within this range.
Please include quotes for whatever contract lengths/options you can offer.
Please include any installation/configuration and/or special construction/build-out costs as well as quotes for any network components that are necessary to deliver your service that will be billed separately.
As per E-Rate rules, all equivalent solutions will be accepted and evaluated.
Vendors - Please include your SPIN and the 470 number with your proposal. Please be advised that the numbers above are approximate. Please list all assumptions used in creating your proposals. The preferred mode of contact is email. The applicant takes no responsibility for phone inquiries. Please email all bid responses to this 470 Application to both the applicant contact person listed under Contact Information on the 470 Application and the consultant (contact@example.gov). If a separate proposal is not received from the incumbent service provider, bills from the incumbent service providers may be considered bids for this E-Rate year. All proposals must comply with FCC LCP rules as well as state and local laws. By submitting a bid on the requested services herein, the vendor certifies that its proposed prices are consistent with the FCCs Lowest Corresponding Price (LCP) requirements and that its equipment and services are compliant with the FCCs Security Rules Order (FCC 19-121) prohibiting the sale, provision, maintenance, modification, or other support of equipment or services provided or manufactured by Huawei, ZTE Corporation, or any other covered company deemed a national security threat.
Category 2: Mi Escuela Montessori will be moving to a new location for/during the 2026/2027 funding year. The address of their new location is 1702 North Wilson Avenue Bartow, Florida, 33830. They would like quotes for E-Rate eligible equipment, cabling and all related components, including installation, for their new building in addition to quotes for BMIC/MIBS and to move their current equipment, per the details below. Please note that construction has not begun on their new building. No walk-throughs are available, and no floor plans will be given out. Please bid based on the information below and list any assumptions made.
EXPECTED BUILDING SET-UP: Mi Escuela Montessori expects their new building to be a two-story new construction building that will be approximately 57,000 square feet under one steel constructed building. They plan to have 19 classrooms, 17 offices, 1 data closet, 1 multi-purpose room and 1 outdoor patio on the first floor. They expect to have 12 classrooms, 11 offices, 1 data closet, 1 main middle school library and 1 outdoor patio on the second floor.
***PLEASE SEE ATTACHED DOCUMENT FOR MORE INFORMATION***
INTERNAL CONNECTIONS:
20-35+ Wireless Access Points (preferably Ubiquiti U7 Pro Max or equivalent) and all related components 4+ switches (preferably Ubiquiti Pro 48 PoE or equivalent) and all related components 6+ UPS (preferably 1500VA 900W Rackmount UPS or equivalent or greater) and all related components 2-4 racks and all related components including shelves. The school will have two data closets, one on each floor. They would like 1-2 racks per data closet. Please provide quotes for open racks in addition to whatever other options you believe will best meet their needs. The school would like one of the racks to hold 65-70% of their equipment and the other rack to hold around 30-35% of their equipment. They have 21 APs, 1 switch and 1 firewall/router in addition to the new equipment listed on this application.
Please provide quotes for installation and configuration. As per E-Rate rules, all equivalent solutions will be accepted and evaluated.
CABLING: Mi Escuela Montessori would like quotes for a total of approximately 10,000-23,000 feet of cabling (Cat 6A or equivalent) and all related components including installation, configuration and termination. This will be for a total of 100-115 runs, single drops, with an estimation of 100-200 feet per run. Please include quotes for conduit.
41-56 runs will be Wi-Fi drops. 59 runs will be Ethernet drops.
The cabling should include all related components including wall connections, terminating equipment, patch panels, patch cables, patch cords, cabling managers, LC connectors, PVC Junction Boxes, keystone jacks, and J-hooks, as needed.
Since the school is moving into a new building that has not yet been constructed or fully designed, they are uncertain about the exact quantity of equipment, cabling and related components they will need. They have given the best estimates they have at this time. Some quantities might need to be finalized closer to installation. Please quote the cabling per run and the equipment per unit.
If applicable, please provide the SKUs or manufacturer part numbers for the products/services listed in your quote.
As per E-Rate rules, all equivalent solutions will be accepted and evaluated.
BASIC MAINTENANCE AND/OR MIBS OR EQUIVALENT: Mi Escuela Montessori would like quotes for Basic Maintenance Services and/or MIBS or equivalent for the following equipment. 21 U7-PRO-MAX-US existing Access Points 1 USW-PRO-48-POE existing switch 1 UDM-PRO-MAX existing firewall/router 20-35 new Ubiquiti U7 Pro Max APs or equivalent 4 new Ubiquiti Pro 48 PoE switches or equivalent 6 new 1500VA 900W Rackmount UPS or equivalent
Vendors - Please include your SPIN and the 470 number with your proposal. Please be advised that the numbers above are approximate. Please list all assumptions used in creating your proposals. The preferred mode of contact is email. The applicant takes no responsibility for phone inquiries. Please email all bid responses to this 470 Application to both the applicant contact person listed under Contact Information on the 470 Application and the consultant (contact@example.gov). All proposals must comply with FCC LCP rules as well as state and local laws. By submitting a bid on the requested services herein, the vendor certifies that its proposed prices are consistent with the FCCs Lowest Corresponding Price (LCP) requirements and that its equipment and services are compliant with the FCCs Security Rules Order (FCC 19-121) prohibiting the sale, provision, maintenance, modification, or other support of equipment or services provided or manufactured by Huawei, ZTE Corporation, or any other covered company deemed a national security threat.
Requested services (21 line items): - Category 1 — Data Transmission And/Or Internet Access — Internet Access And Data Transmission Service - Category 2 — Basic Maintenance Of Internal Connections — Routers - Category 2 — Internal Connections — Switches And Necessary Software And Licenses - Category 2 — Internal Connections — Uninterruptable Power Supply/Battery Backup And Necessary Software And Licenses - Category 2 — Internal Connections — Wireless Access Points And Necessary Software And Licenses - Category 2 — Basic Maintenance Of Internal Connections — Wireless Access Points - Category 2 — Basic Maintenance Of Internal Connections — Switches - Category 2 — Basic Maintenance Of Internal Connections — Firewall Service And Components - Category 2 — Internal Connections — Racks - Category 2 — Internal Connections — Routers And Necessary Software And Licenses - Category 2 — Internal Connections — Firewall Service, Components, And Necessary Software And Licenses - Category 2 — Basic Maintenance Of Internal Connections — Uninterruptable Power Supply/Battery Backup - Category 2 — Internal Connections — Cabling
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260014195/17026865/20888195-USAC_FCC_FORM_470_APPLICATION_260014195_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260014195/17026865/20888042-2026%20FCC%20470%20260014195%20RFP.pdf

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS