2026-60-FAC-Temporary Generator Connection for UPS Systems for ATS Maintenance

Active
c-tran-1238906State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

C-TRAN is soliciting bids for the repair or replacement of an Automatic Transfer Switch (ATS) and the provision of temporary power solutions at its 51st Circle Facility in Vancouver, Washington. The project is being executed as a Washington State Small Works Roster project, requiring all bidders to be registered on the MRSC Small Works Roster. The scope of work involves inspecting, troubleshooting, and restoring the ATS to safe, automatic operation while ensuring zero downtime for the Server Room's UPS systems. This requires the contractor to provide and install temporary generator connections, including load verification, cable deployment from a mobile generator in the parking lot, and subsequent system rollback and demobilization. The sourcing event was issued on August 28, 2026, with questions due by September 7 and the final closing date on September 14, 2026. Bidders must provide lump sum pricing via the official bid form and meet mandatory responsibility criteria, including a current certificate of registration, a State UBI number, and appropriate insurance coverage. Because the project is located in Clark County, contractors must adhere to Washington State Prevailing Wage Rates and submit the required Statement of Intent and Affidavit of Wages Paid. For contracts exceeding 5,000 dollars, payment and performance bonds as well as retainage requirements apply. All work must be performed by a licensed electrical contractor in accordance with NFPA and NEC standards.

General Info

C-TRAN seeks registered bidders for ATS repair and temporary power in Vancouver, Washington.

Agency

Washington → C-TRANView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(11)

Addendum Acknowledgement Form

PDF2 pagesamendment

Certification on Lobbying Form

PDFcertification

Non-Collusion Affidavit

PDF1 pagenon-collusion-affidavit

ATS front view.jpg

JPG

1000011753.jpg

JPG

General Information Form for Contract Submittal

PDF1 pagegeneral-information

Certification of Compliance with Wage Payment Statutes

PDF1 pagecertification

Affidavit Concerning Conflicts of Interest - C-TRAN

PDF2 pagesaffidavit

Certification Regarding Ineligible Contractors

PDF1 pagecertification

ATS spacing.jpg

JPG

event-1238906-attachments.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → C-TRAN
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → C-TRAN
View Agency Profile
Office AddressN/A

Full Description

Show more
Anticipated Sourcing Event Schedule Sourcing Event Issued: Friday, August 28, 2026. Pre-Bid: Site visit: N/A Questions Due: Monday, September 7, 2026 @ 5:00 PM PST Sourcing Event Closes: Monday, September 14, 2026 @ 3:00 PM PST 1. The following project will be accomplished as a Washington State Small Works Roster project in accordance with RCW 39.04.151 and RCW 39.04.152. 2. The State of Washington Prevailing Wage Rates applicable for this public works project, which is located in Clark County, may be found at the following website address of the Department of Labor and Industries: Prevailing Wage Rates. 3. The contractor shall pay the prevailing wage rate per the day of when the work was performed according to the trade performed. Contractor shall submit a Statement of Intent to Pay Prevailing Wages and an Affidavit of Wages Paid through the Department of Labor and Industries' Prevailing Wage Intent and Affidavit (PWIA) system in accordance with RCW 39.12.040 and RCW 39.12.070, with the Affidavit of Wages Paid approved prior to final payment. All bidders must be on the MRSC Small Works Roster (www.mrscrosters.org) in order to submit a quote. For questions about the MRSC Small Works Roster contact Ellen Hutchinson at (206) 625-1300 or by email: mrscrosters@mrscrosters.org. 4. Bidder Responsibility Criteria. Before award, a bidder must meet the mandatory responsibility criteria set forth in RCW 39.04.350, including but not limited to: (a) at the time of bid submittal, holding a current certificate of registration under chapter 18.27 RCW; (b) having a current State Unified Business Identifier (UBI) number; (c) if applicable, having industrial insurance coverage as required under Title 51 RCW, an Employment Security Department number as required under Title 50 RCW, and a state excise tax registration number as required under Title 82 RCW; and (d) not being disqualified from bidding on any public works contract under RCW 39.06.010 or RCW 39.12.065(3). C-TRAN reserves the right to establish and apply supplemental bidder responsibility criteria for this project pursuant to RCW 39.04.350(3). 5. Bonding and Retainage. Public works contracts valued at more than $5,000 are subject to contractor bond requirements under chapter 39.08 RCW and retainage requirements under chapter 60.28 RCW. Prior to commencement of work, Contractor shall furnish a good and sufficient payment and performance bond in the full amount of the contract. Retainage shall be withheld from progress payments and released in accordance with chapter 60.28 RCW, unless C-TRAN elects to reduce or waive retainage under RCW 60.28.011(1)(a), in which case C-TRAN assumes the associated statutory liability described therein. 6. Apprenticeship Utilization. This project's estimated cost is below the threshold currently established under RCW 39.04.320 for mandatory apprenticeship utilization (as of the date of this solicitation, $1.5 million, decreasing to $1 million effective July 1, 2028). Accordingly, apprenticeship utilization requirements do not apply to this project. 7. Scope of Work Background: C-TRAN's Administration Building lost power due to a reported accident on 112th Ave. Staff reported to the building finding the generator was running but no power was transferring to the building. The Automatic Transfer Switch (ATS) was inspected and found to be receiving power and was able to be manually activated. Once activated, emergency power was restored to the building to continue operations. As utility power was restored the ATS had to be manually deactivated and backup generator shutdown. C-TRAN’s 51st Circle Facility at 10600 NE 51st Circle, Vancouver, WA 98682, is served by an ATS that connects incoming utility power to an on-site backup generator, providing continuous power to critical building systems, including a Server Room supporting Uninterruptible Power Supply (UPS)-backed equipment. The existing ATS requires repair and/or replacement to restore full, safe, and reliable automatic operation between utility and generator power sources. Because scheduled maintenance work on the ATS will require the transfer switch itself to be taken offline, C-TRAN also requires temporary generator connections to the Server Room’s UPS systems in order to maintain continuous, zero-downtime operation of Server Room equipment throughout the ATS maintenance window. Contractor shall provide all labor, materials, equipment (including temporary generator to maintain power while work is completed), permits, and supervision necessary to inspect, test, troubleshoot, and repair and/or replace the existing ATS, including all associated controls, wiring, and connections, to restore the transfer switch to safe, code-compliant, fully automatic operation. All work shall be performed in accordance with manufacturer specifications; NFPA 110 (Standard for Emergency and Standby Power Systems); NFPA 70E (Standard for Electrical Safety in the Workplace); applicable National Electrical Code (NEC) requirements, including Articles 700, 701, 702, and/or 708 as applicable to the system’s classification; and all other applicable codes and site safety requirements. Work shall be performed by a Washington State L&I-licensed electrical contractor employing appropriately licensed journeyman or master electricians. 7.1 Temporary Generator Connection for UPS Systems during ATS Maintenance The objective of this portion of the Scope of Work is to safely install temporary power connections on two (2) separate UPS systems located in the Server Room, allowing a temporary mobile generator stationed in the parking lot to feed power directly to the UPS systems. This will ensure continuous Server Room operations and zero downtime during scheduled ATS maintenance. Phase 1: Pre-Maintenance & Engineering - Load Verification: Audit and verify the electrical load specifications (amperage, voltage, phase) of both UPS systems to match the temporary generator output. - Cable Route Planning: Map out a safe path for the temporary heavy-duty power cables, working with C-TRAN's Contract Manager, (e.g., SOOW cords) from the parking lot generator into the Server Room, utilizing existing conduit paths, windows, or designated cable ports. - Safety Barriers: Deploy cable ramps and high-visibility safety markers in the parking lot and walking paths to eliminate or minimize tripping hazards. Phase 2: Installation of Temporary Connections - Breaker De-energization: Safely isolate and lock-out/tag-out (LOTO) the primary input feeds to the UPS bypass/input breakers. - Plug Modification: Install industrial-grade temporary male inlet plugs (pin-and-sleeve or Cam-Lok style matching the generator requirements) onto the input terminals or temporary maintenance bypass lines of both UPS units. - Cable Deployment: Lay down and secure the temporary power cables from the parking lot generator position into the Server Room. Phase 3: Reversion & Demobilization (Post-ATS Maintenance) - System Rollback: Once ATS maintenance is complete, safely transition the UPS inputs back to utility/house power. - De-installation: Disconnect and completely remove the temporary plugs and cables. - Cleanup: Clear all safety ramps, secure the Server Room electrical panels, and restore the site to its original operating state. All materials furnished under this Scope of Work — including but not limited to ATS components, temporary power cables (e.g., SOOW cord), and pin-and-sleeve or Cam-Lok connectors and inlet plugs — shall be new, manufacturer-approved or equivalent replacement parts suitable for the intended voltage, amperage, phase, and application. Any additional parts or scope changes outside the original scope must be approved prior to installation by C-TRAN’s Contract Manager covering this project. Contractor shall conduct a functional test of the ATS following repair or replacement to confirm proper automatic transfer operation, timing, and signaling between utility and generator sources, and to confirm all essential safety systems are in working condition. Contractor shall also verify that all temporary UPS/generator connections have been safely installed and tested, and that — upon completion of ATS maintenance — all temporary connections have been fully removed and reverted to normal utility operation as described above. Dispose of all removed and/or replaced materials off-site, and clean and restore all work areas, including the Server Room and parking lot, upon completion of the project. 8. Quotes are considered firm for a period of 60 days from the date of the quote submitted. Should C-TRAN seek to go beyond that period, C-TRAN may request in writing for bidders to extend the pricing for an additional 30 days for a total period to not exceed 90 days. 8.1 Pricing C-TRAN is seeking lump sum pricing for (1) inspection, testing, and repair and/or replacement of the ATS, (2) installation, maintenance-window support, and demobilization of the temporary generator-to-UPS connections described in this Scope of Work, and (3) all associated materials required to complete the work. Pricing provided must be submitted for this sourcing event using the event's bid form to properly calculate the values for review. Failure to submit the information into the bid form will make a bidder non-responsive for this sourcing event. Bidders may elect to upload their company's quote as an additional document as a supplemental for the work but shall not replace the requirement for completing the bid form with their pricing. 9. Insurance Requirements The following insurance limits are identified below: 1. Workers Compensation: A. State: Statutory B. Applicable Federal (e.g., Longshoremen’s): Statutory C. Employers Liability: $1,000,000.00 2. Comprehensive General Liability (Including Premises Independent Contractor’s Protective; Products and Completed Operations; Broad Form Property Damage): A. Bodily Injury: $1,000,000.00. Each occurrence $1,000,000.00. Annual aggregate B. Property Damage: $1,000,000.00. Each occurrence $1,000,000.00. Annual aggregate C. Products and completed operations to be maintained for three (3) years after final payment. D. Property Damage Liability Insurance shall provide X, C or U coverage as applicable. 3. Contractual Liability: A. Bodily Injury: $1,000,000.00. Each occurrence B. Property Damage: $1,000,000.00. Each occurrence $1,000,000.00. Annual occurrence 4. Personal Injury, with employment exclusive deleted: $1,000,000. Annual aggregate 5. Comprehensive Automobile Liability: A. Bodily Injury: $1,000,000.00. Each person $1,000,000.00. Each occurrence 6. Umbrella Excess Liability: $1,000,000. Over primary insurance. $50,000. Retention for self-insured hazards each occurrence. 7. WA Stop Gap Liability $1,000,000. Each occurrence Certificates of Insurance and Endorsements acceptable to C-TRAN shall be filed with C-TRAN prior to commencement of the Work. These Certificates and the insurance policies required by this section shall contain a provision that coverages afforded under the policies will not be reduced, canceled or allowed to expire until at least 30 days prior written notice has been given to C-TRAN. C-TRAN shall be included as an additional insured on all such policies. Information concerning reduction of coverage shall be furnished by the Contractor with reasonable promptness in accordance with the Contractor’s information and belief. The Contractor shall furnish one copy of certificates of insurance herein required. The Contractor shall furnish to C-TRAN copies of any endorsements that are subsequently issued amending coverage or limits.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
MAIN GROUNDING ELECTRODE
Solicitation # WL-26-006
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, is soliciting a licensed electrical contractor to inspect and repair grounding systems across multiple campus buildings in Laurel, Maryland. The scope of work, identified as WL-26-006, includes the Aspen Dorm, Vocational Building, Willow Hall, Holly Dorm, Maple Dorm, and Oak Dorm, as well as necessary corrections to the Administration Building. All work must comply with NEC 2023, 250 standards, as well as EPA, OSHA, and Maryland state regulations. Technical requirements include the installation of #2/0 awg conductors, 16x2 inch ground bars, 8-foot ground rods with 6-foot separation, and the use of 3/4 inch EMT conduit for routing. This is a single lump sum contract with proposals due by September 3, 2026. Award decisions will be based on best value, weighted by price (60%), quality (20%), past performance (10%), and schedule (10%). Bidders must provide a detailed cost breakdown, a valid Maryland contractor's license, and proof of comprehensive insurance, including general liability of at least 1 million dollars per occurrence. The contractor must start work within 14 days of the Notice to Proceed and provide a one-year workmanship guarantee. Final payment is contingent upon the submission of a completed SF 1413, release of liens, and the successful completion of a final acceptance inspection. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
PANELBOARDS
Solicitation # WL – 26 -0004
This solicitation, identified as WL-26-0004, is for a single lump sum contract to perform electrical panelboard repairs and labeling at the Woodland Job Corps Center in Laurel, Maryland, operated by Adams and Associates for the U.S. Department of Labor. The scope of work requires the provision of non-handwritten circuit directories for buildings E, F, G, K, and M, the reinstallation of a panelboard cover in the welcome center mechanical room, and specific fire alarm control panel identification at the Oak Dormitory, including UL listed red mark labels and updated panel schedules. All work must comply with NEC 2023, OSHA, EPA, and Maryland state regulations. The performance period is scheduled from May 11, 2026, through December 31, 2026. Proposals are due by September 3, 2026, and must be submitted on company letterhead including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Maryland contractor's license. Attendance at the mandatory bid conference is required for consideration. Award will be based on best value, weighing technical quality and price. The contractor must provide comprehensive insurance coverage, including general liability of at least 1 million dollars per occurrence, and guarantee all workmanship for one year. Final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors and suppliers.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
Wind River Job Corps: LAWN EQUIPMENT STORAGE ROOM VENTILATION
Solicitation # wind-river-job-corps-lawn-equipment-storage-room-ventilation
Arbor E & T, LLC dba Equus Workforce Solutions is seeking bids for a subcontracting opportunity to remediate a life safety deficiency at the Wind River Job Corps Center in Riverton, Wyoming. The project involves installing mechanical ventilation in a lawn equipment storage room to mitigate dangerous fuel vapor accumulation. The scope of work includes creating an 18-inch by 18-inch rough opening in an exterior concrete block wall, installing one wall-mounted explosion-proof exhaust fan capable of 600 CFM mounted 15 feet above the floor, and installing two 18-inch by 24-inch door-mounted ventilation louvers. Additionally, the contractor must provide approximately 90 linear feet of conduit and wiring for a 208 volt, 1 phase, 1/3 HP motor designed for continuous operation. All electrical work must adhere to the National Electrical Code, and contractors must follow Lockout/Tagout procedures and use standard commercial PPE. This is a fee-for-service solicitation under NAICS code 238210, with a size standard of 19 million dollars. The award will be based on best value, as determined by Equus. Bidders must submit a price quote on the provided bid sheet, a vendor self-certification form, and signed terms and conditions by September 2, 2026, at 2:00 PM MST. The contract is subject to the Service Contract Act, requiring compliance with Wage Determination No. 2015-5407 Revision 28 for Wyoming. Key federal requirements include adherence to FAR clauses regarding the Combating Trafficking in Persons, Small Business Program representations, and insurance for work on government installations. Final acceptance requires the storage room to be swept clean of debris and surfaces wiped down to return the space to a fully operational state.
EQUUS Workforce Solutions operator of the Wind River Job Corps

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238210
New
Electrical Repair Services
Solicitation # Electrical Services 8-2026
Management & Training Corporation, acting on behalf of the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to provide various electrical repair services at the Centennial Job Corps Center in Nampa, Idaho. The solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified entities. Bids must be submitted via email to Sandra Clore by August 31, 2026, at 3:00pm MST. A pre-bid meeting was scheduled for August 21, 2026. The scope of work includes all electrical services, incidental work required by building codes, and the acquisition of necessary permits. Awardees must provide a one-year written guarantee of workmanship and deliver comprehensive operation and maintenance manuals upon substantial completion. Financial and compliance requirements are stringent, with a mandatory bid bond of 20% and subsequent performance and payment bonds required for bids equal to or exceeding $25,000. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to the provided wage determination for Idaho. Bidders must provide a detailed cost breakout on company letterhead covering labor, materials, equipment, and overhead. Payment is handled through progress payments using AIA G702 and G703 forms, contingent upon the submission of a Schedule of Values. Additionally, contractors must comply with federal security and privacy regulations, including mandatory DOL training and strict data breach liability protocols.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Washington → C-TRAN

Same awarding agency

NAICS: 541330
New
SLED
2026-057-RSOQ-FAC-Water Intrusion Diagnostic Engineering Services
Solicitation # 2026-057-RSOQ-FAC
C-TRAN is seeking Statements of Qualifications from professional engineering firms to provide diagnostic design services to identify and mitigate water intrusion within the underground conduit systems at its Operations Building in Vancouver, Washington. The project involves a four-phase approach: a desktop review of existing documentation, field inspections using advanced diagnostics such as CCTV robotic pipe inspection and ground penetrating radar, forensic isolation and pressure testing, and the delivery of a comprehensive engineering report with remediation recommendations. The goal is to determine the exact source and pathway of water infiltration to develop a practical mitigation plan. The sourcing event was issued on August 25, 2026, with a closing date of September 25, 2026. Following an evaluation period and negotiations, the contract is tentatively scheduled for award on November 11, 2026, with a notice to proceed on November 13, 2026. Proposals are evaluated on a 100-point scale covering the technical response, firm and team qualifications, past performance, and project approach. Submittals must include several mandatory certifications, including a non-collusion affidavit, a conflict of interest affidavit, and certification of compliance with Washington State wage payment statutes. Selected consultants will negotiate a final scope of work and a fixed-fee compensation structure based on raw labor rates and expenses.
Engineering Services

POSTED

4 days ago

DEADLINE

in 27 days
View Details