This Solicitation opportunity from Washington was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 Annual Replacement of Aging and Failing Infrastructure, City of Kirkland, WA #06-26-PW
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Kirkland, Washington, is soliciting bids for the 2026 Annual Replacement of Aging and Failing Infrastructure, solicitation number 06-26-PW. The project involves the rehabilitation of public storm drain conveyance pipes across 26 different sites within the city. The selected contractor will be responsible for providing all necessary labor, tools, materials, and equipment to complete the work, which includes the removal and replacement of 571 total linear feet of pipe across 12, 18, and 24-inch diameters, as well as the ultraviolet cured-in-place pipe lining of 3,620 total linear feet of pipe across those same diameters. In addition to the pipe work, the scope of the contract encompasses all required traffic control, temporary bypassing, and full site restoration. Interested parties must submit their responses by the deadline of July 9, 2026. The project is managed by the City of Kirkland, with Ben Mahony serving as the primary point of contact for the solicitation.
General Info
Place of Performance
Kirkland, WA, 98033, USASet-Aside
Documents
377AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (12)
See All 12 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Removal and Replacement of Storm Pipe:
• 55 linear feet (LF) of 12” diameter pipe,
• 404 LF of 18” diameter pipe, and
• 122 LF of 24” diameter pipe.
Ultraviolet (UV) Cured-in-Place Pipe (CIPP) Lining of Storm Pipe:
• 1,460 LF of 12” diameter pipe,
• 1,835 LF of 18” diameter pipe, and
• 325 LF of 24” diameter pipe.
Work also includes all associated traffic control, temporary bypassing, and site restoration.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
