Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Electrical and Ground Power Substation Replacement

Closed
Solicitation200State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Metropolitan Airports Commission is soliciting bids for the 2026 Electrical and Ground Power Substation Replacement at Minneapolis-St. Paul International Airport. This comprehensive project involves the procurement, installation, and commissioning of medium voltage substation switchgear, automatic transfer switches, and distribution boards to provide normal and emergency power for the Concourse C shell space. Key electrical work includes removing existing substations and switchboards near Gate C1, converting that space into an electrical room with distribution switchboards, and establishing power feeds via a new duct bank from the generator building to the new Concourse C emergency substation. Telecommunication upgrades will include new network connections for IP controllers and equipment monitoring. The scope of work extends to significant civil, mechanical, and structural improvements. Civil requirements include apron pavement removal and replacement, excavation, and the installation of manholes and duct banks. Construction activities encompass asbestos abatement, concrete work, masonry, steel framing, waterproofing, and the installation of curtain walls and metal soffit panels. Mechanical upgrades involve replacing an existing exhaust system with a new chilled water cooling unit, rerouting return air pathways to air handling unit C02, replacing two unit heaters, and rerouting underground storm and sanitary lines. Bids for this project are due by September 15, 2026, with a small business utilization goal of 11 percent.

General Info

Bids for MSP Airport electrical substation replacement and infrastructure upgrades due September 15, 2026.

Documents

3

Addendum No. 01 - 2026 Electrical and Ground Power Substation Replacement

PDF, High priority: read this firstamendment
High

Addendum No. 02 - 2026 Electrical and Ground Power Substation Replacement

PDF, High priority: read this firstamendment
High

MAC 106-2-1119: 2026 Electrical and Ground Power Substation Replacement

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota → Metropolitan Airports Commission
Contacts1 person available
OfficeMN, USA
Office AddressMN, USA
Contacts
Chris Roy Director of Airport Development Project Delivery

Interested Companies (22)

Gov AlphaBrooklyn, NY
ConstructconnectCincinnati, OH
Dawson Civil

See All 22 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Provide the electrical equipment for medium voltage substations for both normal and emergency power at the shell space at Concourse C. These rooms will connect to an existing electrical room by Gate C1 by building ductbank on the apron, and will provide emergency power feeders back from the Generator building to the new C concourse emergency substation. The electrical room near Gate C1 will be rebuilt for this effort. Civil work will include apron pavement removal and replacement, excavation, duct bank and manhole installation, and backfilling. Construction will include asbestos abatement, concrete work, masonry, steel framing and grating, waterproofing, curtain wall, metal soffit panel installation, doors, gypsum board work, and painting. Mechanical work will include replacement of an existing exhaust system in an electrical room with a new chilled water cooling unit, and rerouting of existing return air pathways back to air handling unit C02. To accommodate the electrical work, two unit heaters will be replaced and underground storm and sanitary lines will be rerouted. Electrical work will include the removal of the existing medium voltage substation in the electrical room by the C1 gate area, along with existing switchboards. The existing electrical substation room will then be converted into an electrical room with distribution switchboards. The medium voltage substations for both normal and emergency power for Concourse C will be provided from the newly built-out space from the previous project. This project will be responsible for the procurement, installation and commissioning of medium voltage substation switchgear, automatic transfer switches, distribution boards, and associated equipment in the new built-out electrical substation rooms. Lastly, electrical work will also include power feeds from the new normal and emergency substation rooms to the electrical room by C1 via the duct bank per this project. Telecommunication work will include new network connections for the new IP controllers and monitoring of new electrical substation equipment.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS