This Solicitation opportunity from Georgia was posted on December 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 Groundwater Expansion and Distribution Storage
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves expanding the existing groundwater system by installing two new wells, each equipped with skid-mounted treatment systems and chemical addition capabilities, along with the construction of a 1-million-gallon ground-level storage tank and a high service pump station. These facilities will be centrally located off a private drive near Charlie Smith Road, designed to support a future interconnection with Barrow County. The scope also includes laying approximately 4,900 linear feet (about one mile) of 16-inch water main to connect this new infrastructure seamlessly to the current distribution system, along with all necessary system piping and appurtenances. Bidders are invited to attend a pre-bid meeting scheduled for January 20, 2026, at Braselton Public Works, followed by a site visit. The deadline for submitting bids is February 17, 2026, at the Town of Braselton Town Hall. The project timeline mandates completion within 300 consecutive calendar days from the official "Notice to Proceed." Interested parties can obtain contract documents and technical information by contacting designated representatives. The solicitation is issued by the Town of Braselton, Georgia, with all contractual and technical inquiries directed to specified contacts provided by the town.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
- Lift Station No. 85 ReplacementOpen now, due in 26 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
A pre-bid meeting will be held at 10:00 a.m. local time on Tuesday, January 20, 2026, at Braselton Public Works, 4986 Hwy 53, Braselton, GA 30517 followed immediately by a visit to the project site. Then, bids will be received at the Town of Braselton, Town Hall, 4982 Hwy 53, Braselton, GA 30517, until 10:00 a.m. local time on Tuesday, February 17, 20265. The Project consists of, but is not limited to the following major elements:
The project includes two new wells, a packaged treatment system, 1-million-gallon ground level storage tank, high service pump station, 4,900 linear feet of 16¿ water main, and all system piping and appurtenances.
Time of completion for all work associated with this project shall be three hundred (300) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. For general information and free digital copies of the Contract Documents, Specifications, and Construction Drawings contact Jessica James at +1 (•••) •••-••••Sign up to see this detail or •••••@•••••.•••Sign up to see this detail. For technical questions regarding this project, you may contact Wiley Helm at +1 (•••) •••-••••Sign up to see this detail, or •••••@•••••.•••Sign up to see this detail.