Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Groundwater Monitoring Wells Installation and Annual Water Quality Monitoring, MNR Northwest Waste Disposal Sites, Ontario

Closed
tender_21475International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
PA-2400377 Conditional Use Permit / Camp Goldstar Project
Solicitation # PA-2400377
Conditional Use Permit PA-2400377 authorizes the construction and operation of Camp Goldstar, a private resort located on McDonald Island in the Sacramento-San Joaquin River Delta within San Joaquin County, California. The development features 25 prefabricated mobile lodges, four of which must be ADA accessible, and a 6,160-square-foot L-shaped marina dock with a capacity for 33 to 44 boats. Supporting infrastructure includes a 6,500-square-foot two-story clubhouse with a caretaker's unit, a 1,440-square-foot garage, a 2,500-square-foot pool and spa area with five cabanas, and various recreational facilities such as bocce ball, volleyball, and pickleball courts. Additional site amenities consist of a picnic shelter, dog run, communal restrooms, a housekeeping and laundry building, a gazebo, two observation towers, and 27 fire pits. The project will utilize on-site private water, sanitary sewer, and storm drainage systems. The project was approved by the Planning Commission on November 6, 2025, following a Mitigated Negative Declaration under CEQA, which determined that proposed mitigation measures would reduce environmental effects to insignificant levels. Key regulatory requirements include compliance with AG-80 zoning and OS/RC General Plan designations, as well as adherence to California Health and Safety Codes for septic systems and specific county standards for storm drainage and lighting. Special mandates include the registration of mobile lodges as recreational vehicles with the State of California and strict adherence to CalGEM guidelines regarding the abandonment of oil and gas wells on the property. Construction is scheduled to begin in January 2026, progressing through site preparation, grading, underground utilities, and building construction, with a projected completion date of November 30, 2026.
San Joaquin County

POSTED

about 15 hours ago

DEADLINE

N/A
NAICS: 541620
New
SLED
Mid-Town Area/Specific Plan Initial Study/Initial Environmental Checklist/Negative DeclarationThe City of South Lake Tahoe is advancing the Mid-Town Area Plan, a comprehensive land use and zoning revision for approximately 780 acres in the heart of the community, designed to align with regional environmental goals set by the Tahoe Regional Planning Agency. This plan expands the existing Town Center overlay from 65 acres to 339 acres, introducing more flexible development standards for height, density, and land coverage to encourage mixed-use, residentially-oriented redevelopment that fosters a walkable, vibrant downtown core. Key environmental designations overlay portions of the plan area, including a stream restoration zone and Shorezone Tolerance District 4, ensuring that development proceeds within the ecological constraints of the Lake Tahoe Basin. The initiative is supported by an Initial Environmental Checklist and Negative Declaration, affirming that the proposed changes, when implemented with specific mitigation measures, will not result in significant environmental impacts under CEQA and TRPA regulations. The project focuses on sustainable growth, targeting improvements in housing availability, transportation efficiency, greenhouse gas reduction, and stormwater management while respecting local infrastructure capacities and noise thresholds defined by CNEL standards. The planning effort is led by the City of South Lake Tahoe with technical support from Ascent Environmental Inc., with primary coordination managed by the City’s Senior Planner, Anna Kashuba. Although this initiative is fundamentally a zoning and environmental planning document rather than a procurement contract, it involves formal administrative review processes requiring compliance with TRPA Code, California Building Code, and state environmental regulations. Inspection and acceptance responsibilities are shared between City and TRPA authorities, who oversee adherence to performance criteria such as erosion controls, hazardous materials handling, geotechnical standards, and wastewater system limits. While no formal contract value, payment terms, solicitation number, or federal acquisition clauses are present, the project operates under a defined timeline for public review from July 21 to August 19, 2026, with subsequent implementation dependent on regulatory approval and community input. The plan serves as the foundational regulatory framework for future development in the designated area, integrating environmental sustainability with urban revitalization objectives without invoking traditional federal contracting mechanisms or procurement structures.
City of South Lake Tahoe

POSTED

about 15 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract involves two main components related to environmental monitoring at the Ministry of Natural Resources (MNR) Northwest Waste Disposal Sites in Ontario. The first deliverable is the 2026 Annual Water Quality Monitoring at 17 designated landfill sites, aimed at ensuring ongoing compliance with provincial environmental standards and regulatory requirements. The second deliverable focuses on the installation of groundwater monitoring wells at specific waste disposal sites as outlined in the Request for Bids. These activities are critical for maintaining environmental oversight and supporting the safe management of landfill operations in the region. Issued by the Government of Canada through Supply Ontario, this solicitation was posted on January 26, 2026, with a response deadline of February 19, 2026. The contracting authority responsible for this opportunity is Ray Dickson, who can be contacted via email or phone for further inquiries. While detailed location data for the performance sites is not specified beyond the general northwest Ontario area, the contract underscores the federal government's commitment to environmental stewardship through systematic water quality and groundwater monitoring initiatives.

General Info

2026 water quality monitoring and groundwater well installation at 17 Ontario landfill sites.

Agency

Government of Canada → Supply Ontario

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Supply Ontario
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Supply Ontario
Office AddressN/A
Contacts
Ray DicksonContracting Authority

Full Description

Show more
The project consists of two deliverables: (1) the 2026 Annual Water Quality Monitoring at 17 MNR Northwest Waste Disposal Sites (WDSs), Ontario, and (6) groundwater monitoring wells installation at certain WDSs outlined in the Request for Bids (RFB).MNR monitors water quality at several of its landfills in northwestern Ontario to ensure compliance with relevant provincial approvals and legislation.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS