Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Kevin Wailes Operation Center Concrete (R&T)

Closed
111-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Lincoln Electric System is soliciting formal bids for the 2026 Kevin Wailes Operation Center Concrete (R&T) project, located at 9445 Rokeby Road in Lincoln, Nebraska. The scope of work involves replacing approximately 9,300 square feet of existing crushed limestone with a poured concrete slab, which includes demolition, sub-grade repair, and the installation of new 9-inch concrete. The project requires the contractor to provide all labor, supervision, equipment, and materials, ensuring that at least one main travel lane remains open during construction. All work must be completed by November 21, 2026, and bidders must submit a tentative work schedule for approval 48 hours before starting. The contract will be awarded to the lowest responsible bidder based on price, completion date, and compliance with contract documents. Successful bidders must execute a standard construction contract, provide proof of insurance from a B+ rated company, and furnish performance and labor and material payment bonds. Additionally, contractors must complete an Equal Employment Opportunity Compliance form and adhere to strict confidentiality and safety standards. Payment is structured with progress payments at 95 percent of approved invoice amounts within 30 days, with the final balance paid after final acceptance and the submission of as-constructed drawings and warranties. Bids are due by September 15, 2026, at 2:00 PM CST.

General Info

Bids for Kevin Wailes Operation Center concrete project due September 15, 2026.

Documents

8

111-26 Proposal Sheet – 2026 LES Concrete Replacement

XLSX, High priority: read this firstrfq
High

2026 Concrete Technical Specifications - Lincoln Electric System

DOCX, High priority: read this firstspecifications
High

2026 LOC RT Concrete - area and concrete legend

PDF, High priority: read this firstspecifications
High

Bid #111-26 Instructions to Bidders - Kevin Wailes Operation Center R&T Concrete

DOCX, High priority: read this firstifb
High

Lincoln Electric System Bid #111-26 Construction Bid Signature Page

DOCX, High priority: read this firstrfq
High

Lincoln Electric System EEO Compliance Form rev April 2025

PDF, Low priorityother
Low

Lincoln Electric System Standard Construction Contract

DOCX, Low prioritycontract-document
Low

Performance and Labor and Material Payment Bond

PDF, Low prioritybond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Lincoln Electric System
Contacts1 person available
OfficeNE, USA
Office AddressNE, USA
Contacts
All questions must be submitted through this bid portal under the clarifications tabLES Procurement Department

Full Description

Show more
Return to Bid List Bid NUMBER 111-26 TITLE 2026 Kevin Wailes Operation Center Concrete (R&T) PROCESS Two Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 21 days: 14 hours: 53 minutes: 12 seconds DESCRIPTION BID DOCUMENTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 111-26 TITLE 2026 Kevin Wailes Operation Center Concrete (R&T) AVAILABLE DATE 8/24/2026 4:05 PM CLARIFICATION DEADLINE 9/8/2026 4:00 PM DUE DATE 9/15/2026 2:00 PM CONTACT INFORMATION LES Procurement Department; contact@example.gov; All questions must be submitted through this bid portal under the clarifications tab. BID TYPE Formal BILL TO Accounts Payable,, 9445 Rokeby Road,, Lincoln, NE 68526 US SHIP TO LES Operations Center, 9445 Rokeby Road, Lincoln, NE 68526 US DESCRIPTION
Lincoln Electric System is requesting bids to furnish all labor, supervision, equipment, and material to construct concrete as per LES Specifications included in this solicitation.
Successful bidder will be required to complete (1) the LES Construction Contract; 2) furnish proof of insurance with coverage specified in the Contract by an insurance company licensed to do business in Nebraska and rated at least B+ in A.M. Bests Rating. Certificate must show LES listed as additional insured for general liability and include waiver of subrogation; 3) furnish a performance and labor and material payment bond from a surety licensed to do business in Nebraska and also rated at least B+ in A.M. Bests Rating; and 4) Complete the Equal Employment Opportunity Compliance Form
BID EVENT INFORMATION EVENT TITLE MANDATORY No EVENT DATE/TIME (CST) LOCATION DESCRIPTION

More opportunities from Nebraska → Lincoln Electric System

Same awarding agency

New
SLED
Purchase of 115kV Break Switches
Solicitation # 149-26
Lincoln Electric System is soliciting formal bids under solicitation 149-26 for the purchase and delivery of 115kV Vertical Break Switches. The equipment must be furnished FOB to a specified location in Lincoln, Nebraska, and must conform to Technical Specification S-26-24 and Drawing 016105. Key technical requirements include the installation of an arc horn gap interrupting device on each single pole unit and the galvanization of all parts after fabrication. Equipment must be designed and tested according to the latest ANSI/IEEE, IEC, ASME, ASTM, NEMA, and NESC standards, with a required test report provided upon delivery. The contract will be awarded based on the lowest total bid price, the completion date, and the consideration of any noted exceptions. Bidders must guarantee delivery by May 26, 2028, as the delivery timeline is considered an essential element of the contract. To qualify, manufacturers must have at least three years of satisfactory reliability service in outdoor substation use and must have supplied at least 100 identical units within the United States. Payment will be made in full within thirty days following the receipt of equipment and successful compliance testing. Submission requirements include a completed proposal form, detailed equipment descriptions, dimensional drawings, and installation manuals. Bidders must also submit a completed Equal Employment Opportunity Compliance Request Form. All proposals must be submitted through the eBid system by the deadline of November 17, 2026, at 2:00 PM, with a clarification deadline of November 11, 2026.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 332312
New
SLED
Purchase Tubular Structures
Solicitation # 148-26
Lincoln Electric System is soliciting formal bids for the design, detailing, manufacturing, and delivery of S-26-22 tubular steel pole structures and associated hardware for the 70th and Bluff and 128th and Adams substations. The scope includes one A-Frame deadend structure, two H-Frame deadend structures, and two static wire support structures (42ft and 52ft), along with their respective anchor bolt assemblies. All manufacturers must be AISC certified and provide evidence of certification, basic preliminary drawings, PLS-Pole files, and design calculations at the time of bidding. Technical standards require adherence to ASCE 48 for structural design, AWS D1.1 for welding, and various ASTM standards for materials and galvanizing. The contract will be awarded based on the lowest total bid price, delivery date, and any noted exceptions. Key delivery milestones include anchor bolt assemblies for H-Frames by October 1, 2027, and all other structures and bolts by September 1, 2028. Deliveries are FOB Lincoln, Nebraska, with transportation charges paid by the vendor. Payment terms are Net30, following successful testing by LES. Bidders must submit their proposals through the LES Procurement Portal by November 10, 2026, at 2:00 PM CT, and are required to complete an Equal Employment Opportunity Compliance Request Form upon winning the bid.
Fabricated Structural Metal Manufacturing

POSTED

7 days ago

DEADLINE

in 12 days
View Details
NAICS: 423430
New
SLED
CISCO ACI Software Support Renewal
Solicitation # 147-26
Solicitation 147-26 is a two-step unsealing procurement process issued by the Lincoln Electric System (LES) in Nebraska for the renewal of Cisco ACI software and hardware support services. The primary scope involves providing 12-month support terms from November 12, 2026, to November 11, 2027, with some specific items having a shorter 8-month term ending July 31, 2027. Deliverables include SMARTnet Solution Support 8x5xNBD for various N9K and APIC hardware, software application solution support with upgrades for ACI-AD products, and SmartNet support for C9500 devices. To maintain warranty terms, only authorized new Cisco products from authorized partners or distributors are acceptable. Bids must be submitted electronically via the LES Online Procurement System by November 10, 2026, at 2:00 PM CT, as paper copies will not be accepted. Awardees must comply with the laws of the United States and the State of Nebraska, including fair employment practices and the Foreign Adversary Contracting Prohibition Act (LB 1300), which requires certification that the bidder is not a scrutinized company. Payment will be made in full within thirty days following successful testing and acceptance by LES. All transportation charges are to be paid by the vendor, and the delivery date specified in the bid is considered an essential element of the contract.
Computer and Computer Peripheral Equipment and Software Merchant Wholesalers

POSTED

7 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS