Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

78--2026 Steel Pavilions

Awarded
140L1726Q0036Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332311
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E5-27-T-0354
Solicitation SPE8E5-27-T-0354 is a Request for Quotations issued by the DLA Troop Support Construction and Equipment office for the procurement of six extension ladders, identified by NSN 5440-99-407-0294 and part number G414/4779/1. The government requires the exact product from the specified entity, WFE Ltd (CAGE K7705), and any other offerings will be considered alternate products. The delivery is set for 167 days after the order, with a need ship date of April 26, 2027, and a final required delivery date of September 8, 2027. The items are to be delivered FOB Origin to the DDSP New Cumberland Facility in Pennsylvania, where both inspection and acceptance will take place. The contract mandates strict adherence to DLA Master List technical and quality requirements, which take precedence over ASTM D3951 packaging standards. All packaging must be marked and labeled according to MIL-STD-129, and any hazardous materials must comply with the Hazard Communication Standard and include a Safety Data Sheet to avoid being deemed non-responsible for the award. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Additionally, the contractor must comply with the Buy American Act, the Berry Amendment, and various DFARS cybersecurity and telecommunications prohibitions. Quotations are due by November 9, 2026.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 19 hours ago

DEADLINE

in 11 days
NAICS: 332311
New
Federal
ID-KOOSKIA NFH-FORMALIN STORAGE BLDG
Solicitation # 140FF027Q0032
The Department of the Interior, through the Fws Contracting Activity, is soliciting a Firm-Fixed-Price purchase order for the manufacture and delivery of one fully assembled outdoor chemical storage locker, specifically Model SBB1600SA or an equivalent. The unit will be delivered to the Kooskia National Fish Hatchery in Idaho. This procurement is a total small business set-aside under NAICS code 332311, with a price evaluation preference available for HUBZone small business concerns. The award will be based on the Lowest Price Technically Acceptable method, requiring offerors to maintain active SAM registration and submit a completed bid sheet along with a technical narrative detailing their procedures and schedule. The storage locker must accommodate 16 standard 55-gallon drums and feature a minimum sump capacity of 272 gallons, meeting EPA and OSHA secondary containment standards. Technical specifications include 12-gauge galvannealed steel exterior walls, 20-gauge interior walls, a UL Classified commercial-grade keyed lockset, and UV- and chemical-resistant paint. Mandatory features include a pre-wired electrical system, insulation, heating systems, explosion relief panels, and compliance with NFPA 1, NFPA 30, and SMaRT Certified Gold standards. Delivery is expected within 12 to 23 weeks from the award date, and the contractor must provide shipment tracking and coordinate offloading with facility personnel. Invoicing must be processed electronically through the Invoice Processing Platform.
Fws Contracting Activity

POSTED

about 24 hours ago

DEADLINE

in 7 days
NAICS: 332311
New
DIBBS
PANEL ASSEMBLY
Solicitation # SPE8E5-27-T-0182
Solicitation SPE8E5-27-T-0182 is a fixed-price request for quotations issued by the Defense Logistics Agency Troop Support Construction and Equipment for the procurement of four Panel Assemblies, identified by NSN 5411-01-265-5017. The assembly consists of two frame installations and one closeout panel assembly measuring 60.81 inches wide by 79.31 inches high with two environmental control unit openings. Delivery is required within 20 days after order, with a required delivery date of April 10, 2025, shipped FOB Origin to the CCDC Soldier Center in Natick, Massachusetts. Inspection and acceptance will occur at the destination. The contract mandates strict adherence to the DLA Master List of Technical and Quality Requirements, including specific packaging standards under ASTM D3951 and MIL-STD-129. Contractors must maintain supply chain traceability and are restricted to authorized sources, specifically Quality Aviation Inc. and Charlotte Aircraft Corporation. Key compliance requirements include the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Additionally, the solicitation prohibits the use of additive manufacturing without prior approval and requires strict compliance with hazardous material labeling and Safety Data Sheet submissions per 29 CFR 1910.1200. A price evaluation preference is available for certified HUBZone small businesses.
Defense Logistics Agency

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 332311
New
DIBBS
SHIPPING AND STORAGE C
Solicitation # SPE8ED-27-T-0086
Solicitation SPE8ED-27-T-0086 is a Request for Quotations issued by DLA Troop Support, Construction and Equipment Containers, for the procurement of miscellaneous shipping and storage containers under NSN 8145015409695. This acquisition is a set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The total requirement consists of 265 units divided across two delivery locations: 200 units to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania and 65 units to DLA Distribution San Joaquin in California. Delivery is required within 53 days after receipt of order, with an original required delivery date of February 19, 2027. The terms are FOB Origin, with inspection and acceptance occurring at the destination. The contract mandates strict adherence to packaging and marking standards, specifically ASTM D3951 and MIL-STD-129, with the DLA Master List of Technical and Quality Requirements and RP001 taking precedence. All payment requests and receiving reports must be processed electronically through the Wide Area WorkFlow (WAWF) system. Key regulatory requirements include compliance with the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Quotations must be submitted via the DLA Internet Bid Board System (DIBBS) by the specified deadline.
CONSTRUCTION & EQUIPMENT CONTAINERS

POSTED

2 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Solicitation 140L1726Q0036 is a firm-fixed-price request for quotations for the manufacture and delivery of 29 prefabricated steel pavilions for the Bureau of Land Management. The requirement includes 24 10x10 ft pavilions for Rob Jaggers Campground and five pavilions for Datil Campground, consisting of one 20x20 ft and four 16x16 ft units. The scope is strictly limited to the supply, transport, and offloading of the structures, as well as the provision of engineered drawings and foundation designs sealed by a licensed engineer. All field erection, excavation, and concrete installation are explicitly excluded from the contractor's scope. The final delivery date for all items is January 31, 2027, with shipping destinations located in Fort Stanton and Socorro, New Mexico. This procurement is 100% set aside for Indian Small Business Economic Enterprises and HUBZone Small Businesses under NAICS 332311. Technical specifications require all steel members to be primed and powder coated, with roof panels of at least 26 gauge and adherence to ASTM standards for steel tubing, plates, and hardware. Award will be based on best value, with a 50% weight on price and 50% on non-price factors, including technical capability, past performance, and a minimum ten-year warranty on materials and workmanship. Offerors must be registered in SAM.gov and submit their quotations in two parts, covering both pricing and non-price factors, to the contracting officer by the specified deadline.

General Info

24 prefabricated metal shelters for Fort Stanton, NM, via Indian small business set-aside, SAM.gov registered, quotes due August 17, 2026.

Contract Value

$314,375

NAICS

332311 - Prefabricated Metal Building and Component Manufacturing

Place of Performance

MULTIPLE, Fort Stanton, NM, 88323, USA

Set-Aside

ISBEE

Award Issued Date

Documents

11

140L1726Q0036 Amendment 0008

PDF, High priority: read this first9 pages · amendment
High

A06_RFO_NCA Picnic Shelters Specifications JV 2026

PDF, High priority: read this first3 pages · specifications
High

Amendment 0001 to Solicitation 140L1726Q0036 for Steel Pavilions

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140L1726Q0036

PDF, High priority: read this first3 pages · amendment
High

Amendment 0003 to Solicitation 140L1726Q0036

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 140L1726Q0036

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 140L1726Q0036

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 140L1726Q0036

PDF, High priority: read this firstamendment
High

Amendment 0007 to Solicitation 140L1726Q0036 for Prefabricated Steel Pavilions

PDF, High priority: read this firstamendment
High

Datil Well Campground Pre-fab Engineered Picnic Shelter Specifications

DOCX, High priority: read this firstspecifications
High

Solicitation 140L1726Q0036 for Prefabricated Steel Pavilions

PDF, High priority: read this first12 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

8 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Aug 17, 2026 to Aug 24, 2026. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 24, 2026 to Aug 25, 2026. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Colorado State Office
Contacts1 person available
OfficeLakewood, CO, 80225, USA
Office AddressLakewood, CO, 80225, USA

Full Description

Show more
Amendment 0008: The purpose of this amendment is to clarify shipping and material terms subject to inquiry. The solicitation due date is extende3d to August 25th at 0800 MT. All other terms and conditions remain unchanged.

Timber is not a qualifying substitute.

CLIN 0011 Shipping Address: Rob Jabbers CG: 1612 NM-220, Fort Stanton, NM 88323

CLIN 0020, 0030 Shipping Address: Socorro Field Office, 901 South Highway 85, Socorro, NM 87801-4168


Amendment 0007: The purpose of this amendment is to provide answers to submitted questions:

1. Snow and Wind Design Criteria: The specifications state that the structures must meet site-specific snow and wind load criteria, while the actual ground snow load and wind speed values are left ¿to be determined by site specific design.¿ Please confirm whether the contractor/manufacturer is responsible for determining these site-specific design loads through its licensed engineer, or whether BLM will provide the required design values.
A1. This amendment hereby modifies requirements 4 & 5 of the attached specification to remove CUSTOM wind and snow load requirements. Wind and snow load requirements shall be based on building codes applicable to the delivery locations.

2. Delivery Schedule: The solicitation establishes a delivery date of October 30, 2026. Please confirm whether all required shelters must be delivered and accepted by this date and whether partial or phased deliveries are permitted.
A2. The delivery due date for all items is 01/31/2027

3. Scope of Work: Please confirm that the contractor¿s scope is limited to furnishing, transporting, and offloading the Rob Jaggers Campground shelters, including the required engineered drawings, foundation/footing design, and installation instructions. The specifications require the manufacturer to provide engineered drawings and foundation/footing design, and state that the contractor is responsible for offloading. Please confirm that field erection, concrete foundations/footings, anchoring, and final installation are not included in the contractor¿s scope.
A3. This is correct... Supply delivery and tech data only

Amendment 0006: In response to a vendor submitted question:
Q1. The summary and coating paragraph indicate 24 shelters, while the post/upright color paragraph indicates 27. Page 1 also includes a ¿Quantity: 8 Total¿ reference. Could you please confirm the total number of shelters we should use for pricing purposes?

A1. The requirement is for the following quantities. Any inconsistencies to volume shall be clarified to the following.
CLIN 00011: 10 ft x 10 ft prefabricated Steel Pavilion, 24 each, Rob Jaggers Campground (incl freight)
CLIN 00020: 20 FT X 20 FT prefabricated Steel Pavilion, 1 each, Datil Campground
CLIN 00030: 16 FT X 16 FT prefabricates Steel Pavilion, 4 each, Datil Campground
CLIN 00040: Freight costs allocable to Datil Campground



Amendment 0005: The purpose of this modification is to clarify prior question and answer. All other terms and conditions remain unchanged.

3. Post/Upright Quantity: Under the coating requirements, the specifications reference color selection for the "24 each ¿ 10' x 10'" post/uprights, while the procurement is for 24 shelters. Please confirm that this is a typographical error and that the requirement applies to all posts/uprights associated with the 24 shelters.

RE: Datil Well CG Shelters ONLY ¿ Minimum Specifications: Quantity of 5 (five) as specified:
1. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters
2. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters

RFO: Rob Jaggers Faciltiy requires quantity of 24 Each.
Total = 24 ¿ 10¿ x 10¿ (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations


Amendment 0004:

The purpose of this modification is to provide the below questions and answers.

1. Snow and Wind Loads: The specifications state that the ground snow load and wind speed loading are to be determined by site-specific design(by manufacturer), but the required PSF and MPH values are blank. Can BLM provide the required ground snow load and design wind speed for the Rob Jaggers Campground location?
RE: Datil Well CG Shelters ONLY ¿ these values are blank as a requirement of the building manufacturer to calculate and provide in the response to this solicitation. These values need to be based on the site-specific locations, as provided and current building codes. BLM does not have the expertise to determine wind and snow load and that is why BLM is requiring those structural loads to be calculated by the building manufacturer.
RFO: Manufacture will have to use any national or local codes for load and wind specifications.

2. Applicable Building Code: The specification references "2018 IBC, or newer." Can BLM confirm the specific edition of the IBC and any locally applicable amendments that should be used for the engineered shelter and foundation designs?

RE: Datil Well CG Shelters ONLY ¿ the Building Codes, as specified in the SOW, shall be determined by the manufacturer literally as ¿2018 IBC or newer¿, which the building manufacturers must be capable to determine and show compliance with. These values are based on the provided site-specific locations and the most current building codes. BLM does not have the expertise to determine these and that is why BLM is requiring code compliance to be determined by the building manufacturer. This response applies to both shelter and foundation design.
RFO: Concur with the above statement.

3. Post/Upright Quantity: Under the coating requirements, the specifications reference color selection for the "24 each ¿ 10' x 10'" post/uprights, while the procurement is for 24 shelters. Please confirm that this is a typographical error and that the requirement applies to all posts/uprights associated with the 24 shelters.
RE: Datil Well CG Shelters ONLY ¿ Minimum Specifications: Quantity of 5 (five) as specified:
1. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters
2. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters
RFO: Rob Jaggers Faciltiy requires quantity of 24 Each.
Total = 24 (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations
4. Delivery vs. Installation: Please confirm that this procurement is for manufacture and delivery only, and that installation, excavation, concrete foundations/footings, anchor installation, and shelter erection will be performed by others. The specifications require engineered foundation drawings and anchor templates but do not expressly state that the contractor is responsible for construction/installation.
RE: Datil Well CG Shelters ONLY ¿ Exactly as the Specifications indicate this procurement is for manufacture and delivery only. There will be absolutely no installation, excavation, concrete foundations/footings, anchor installation, since the shelter erection will be performed later by others. Vendor must follow delivery instructions.
RFO: Same as above.
5. Offloading: The specifications state that the contractor is responsible for offloading and that site conditions will require an off-road forklift or equivalent machine. Can BLM confirm whether the contractor must furnish and operate the off-road forklift/telehandler at delivery, with no Government-furnished unloading equipment available?
RE: Datil Well CG Shelters ONLY ¿ BLM will offload if the required advanced notice is provided. Vendor must follow delivery instructions.
RFO: Contractor will need to provide offloading services of the above mentioned equipment.
6. Delivery Date: The solicitation identifies October 30, 2026 as the delivery date. Please confirm whether all 24 (29 in this combined Solicitation) shelters must be delivered in a single shipment by October 30, or whether phased/partial deliveries prior to October 30 are acceptable.

RE: Datil Well CG Shelters ONLY ¿ The shelters can be delivered as either a partial or complete quantity, if the delivery instructions are followed. However, payment cannot be invoiced or paid until the entire quantity is delivered, inspected, and accepted. For Datil CG the final delivery date is flexible based on manufacturers required lead time.
RFO: Same as above.
7. Warranty: The evaluation criteria state that a minimum ten-year warranty should be offered for "materials and/or workmanship," while the specifications state a minimum ten-year warranty against manufacturer defects. Please confirm the required warranty standard and whether a manufacturer's standard 10-year warranty against manufacturing defects satisfies this requirement.
RE: Datil Well CG Shelters ONLY ¿ If the Industry Standard as offered by the Manufacturer for "materials and/or workmanship," is 10 years, BLM will not accept a warranty less than the manufacturer's and industry standard.
RFO: Same as above.
8. Quantity Clarification: The solicitation calls for 24 shelters, but the specifications contain the language "Quantity: 8 Total: 24 each of 10' x 10' shelters." Please confirm that the total required quantity is 24 shelters.
RE: Datil Well CG Shelters ONLY ¿ Minimum Specifications: Quantity of 5 (five) as specified:
3. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters
4. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters
5. RFO: Rob Jaggers Faciltiy Specs require quantity of 24 Each 10 feet x 10 feet all steel, square, hip roof shelters.
Total = 24 (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations
9. Foundation Engineering: The manufacturer is required to provide sealed foundation/footing designs for the installation area. Will BLM provide geotechnical or soil-bearing information for the Rob Jaggers Campground site, or should offerors use an assumed allowable soil-bearing capacity for design?
RE: Datil Well CG Shelters ONLY ¿ offerors shall use an assumed allowable soil-bearing capacity for design. BLM will not provide geotechnical or soil-bearing information for design.
RFO: Same as above statement.


Amendment 0003

The purpose of this modification is to update the required delivery date for all items to 01.31.2027. All other terms and conditions remain unchanged.

Amendment 0002

The purpose of this amendment is to remove line 10 and substitute with line 11. No other changes are made.


AMENDMENT 0001
The amendment adds 1 each 20 ft x 20 ft steel pavilion and 4 each 16ft x 16ft pavilion to the requirement. CLIN 0010 reference RFO NCA Attachment. CLIN 0020, 0030, 0040 reference SFO Datil Well Attachment. The solicitation is extended by one week to provide for updates to quotations.

RFQ NARRATIVE

The Bureau of Land Management requests quotation for 24 pre-fabricated Steel Pavilions pursuant to the specifications. The resultant order will be for a firm-fixed-price contract type. This RFQ is issued pursuant to the procedures of FAR Parts 12 Acquisition of Commercial Products and Commercial Services.

Instructions to Offerors:
Basic Contracting Requirements:
1. Active Registration - www.sam.gov - check it now please. If having issues with your sam.gov registration, don't pay anyone. Free assistance is available at your local APEX Accelerators -https://www.apexaccelerators.us/#/
2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments
3 Part 12 - Acquisition of Commercial Products and Commercial Services
4. Indian Small Business Economic Enterprise Set Aside Set Aside for NAICS 332311 Prefabricated Metal Building and Component Manufacturing Size Std 750 Employees
5. Type of Contract - Firm Fixed Price
6. Government Past Performance Systems including SAM.gov and CPARS.gov will be evaluated to support the determination of responsibility required per FAR 9.104-1.

Instructions to Offerors:
1. Provide in your quotation in two parts: PART I (Non-price factors) PART II (Pricing Proposal)
2. Send quotation to contact@example.gov no later than the suspense date. Late quotes will not be considered.
3. Questions are to be submitted to contact@example.gov no later than 11 August 2026 at 0800 MT. Any questions will be responded to via RFQ amendment to the vendor pool.
4. Quotes shall be valid for not less than 120 days.

More opportunities from Department Of The Interior → Colorado State Office

Same awarding agency

NAICS: 236220
New
Federal
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
Solicitation # 140L1726R0001
Solicitation 140L1726R0001 is a Firm Fixed Price construction project for warehouse improvements at the Montrose Public Lands Center in Montrose, Colorado. The scope of work includes asbestos abatement, bathroom remodeling, flooring replacement, installation of a new rooftop heating and cooling unit, and the replacement of a manual overhead door with an electric one. Additional requirements involve upgrading luminaires and electrical outlets, maintaining the metal roof, repairing existing overhead doors, and replacing a photovoltaic inverter. The project is a 100% Total Small Business Set-Aside under NAICS 236220, with a performance period scheduled from November 16, 2026, to May 30, 2027. The contract is governed by FAR Part 15 and FAR Part 36, with award based on Best Value using an acceptable/unacceptable rating for technical approach, experience, and past performance. Contractors must comply with Davis-Bacon Act wages for Montrose County and maintain active registration in SAM.gov. For contracts exceeding 150,000 dollars, 100% performance and payment bonds are required, and a bid guarantee of 20% of the bid price must be submitted. Invoicing is processed electronically through the Invoice Processing Platform with 14-day prompt pay and progress payments. The prime contractor is required to self-perform at least 15% of the contract value, excluding materials.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
Federal
B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Solicitation # 140L1726R0010
Solicitation 140L1726R0010 is a total small business set-aside construction contract issued by the Department of the Interior's Colorado State Office. The project focuses on hydrologic restoration to benefit the endangered Gunnison sage-grouse in the Crawford, Colorado area. The primary objective is to improve drainage on approximately 7.75 miles of rural roads by installing 204 rolling dips and associated lead-out ditches. These structures are designed to redirect surface water off roadways and onto adjacent sagebrush vegetation to mimic natural hydrologic flow. Construction is strictly limited to a work window between August 30, 2027, and October 22, 2027, although the overall period of performance extends through October 29, 2027. The government will utilize a best-value tradeoff award method, weighing price equally against the combined factors of technical approach, past performance, and schedule. Technical requirements are stringent, requiring rolling dips to be constructed at approximately a 30-degree angle with a cross slope between 4% and 8%, and lead-out ditches not to exceed 57.5 feet in length. Performance is monitored via a Quality Assurance Surveillance Plan, with a 95% acceptance threshold for inspected structures and zero tolerance for disturbances in identified avoidance zones. The contract is subject to Davis-Bacon Act wage determinations and requires contractors to maintain liability insurance and provide resumes for key personnel demonstrating significant experience in project planning and well installation.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS