Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Small Diameter ACP Sewer Rehabilitation Project

Closed
2026-IFB-055State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and utilizes EJCDC standard forms for its contracting requirements. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a bid bond, evidence of authority to do business in North Carolina, and documentation of good faith efforts to meet MBE and WBE participation goals, which are set at 10 percent combined for the state and approximately 10.9 percent for MBE and 10.4 percent for WBE per EPA goals. Performance and payment bonds, as well as proof of insurance, are required. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Technical requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass electrical and instrumentation upgrades, rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, and general excavation and surveying. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities, with a specific emphasis on DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and trucking, are due by November 17, 2026, with the final bid date set for November 18, 2026. Any exceptions to standard subcontract forms must be submitted as redlines alongside the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Village of Schaumburg, through its Engineering and Public Works agency, is seeking proposals for the 2026 Small Diameter ACP Sewer Rehabilitation Project. This solicitation, identified as 2026-IFB-055, focuses on infrastructure improvements within the state of Illinois. Interested parties must submit their responses by the deadline of August 28, 2026, at 3:00 PM. The project is managed by Scott Shirley and overseen by Purchasing Supervisor Jillian Ostman. Detailed information and submission portals are available through the village's procurement website.

General Info

Village of Schaumburg seeks proposals for 2026 ACP sewer rehabilitation by August 28, 2026.

Documents

4

2026-IFB-055 2026 Small Diameter ACP Sewer Rehabilitation Project

PDF, High priority: read this firstifb
High

2026 Small Diameter ACP Sewer Rehabilitation Project Specifications

PDF, High priority: read this firstspecifications
High

Village of Schaumburg 2026 Small Diameter ACP Sewer Rehabilitation Project Plan Set

PDF, High priority: read this firstspecifications
High

2026 Small Diameter ACP Sewer Rehabilitation Project - Engineer's Cost Estimate

PDF, Low priorityengineers-cost-estimate
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Engineering and Public Works
Contacts2 people available
OfficeSchaumburg, IL, 60193, USA
Office AddressSchaumburg, IL, 60193, USA
Contacts
Scott ShirleyProject Manager
Jillian OstmanPurchasing Supervisor

Interested Companies (10)

Insituform TechnologiesChesterfield, Missouri
National Power RoddingChicago, Illinois
Hoerr ConstructionGoodfield, Illinois

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Schaumburg is the largest center of economic development in the State of Illinois, outside the City of Chicago. In addition to the 9.5 million square feet of retail and restaurant space, the village has over 12 million square feet of office space and 13.5 million square feet of industrial space. With a daytime population of 150,000, thousands of businesses, 30 hotels, over 200 restaurants, highly educated workforce, superb location and high quality of life, Schaumburg is 'The Place for Business'.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS