Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Technology Cabling Project

Closed
2026-RFQ-019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers across six locations, including RP-1, RP-2, RP-4, RP-5, CCWRF, and CDA. The scope of work comprises three primary objectives: performing visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and conducting comprehensive oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure and provide on-site training for up to 20 agency staff members on inspection tools and defect identification. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by technicians certified to ASNT Level 1 or higher. This is a fixed-pricing contract with a not-to-exceed total price, intended as a single award to the most capable and cost-effective offeror. Evaluation criteria include the proposer's past performance, specifically requiring at least two similar projects completed within the last five years, as well as the proposed staffing plan, methodology, and fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed company profile, project approach, and various required forms such as a Non-Collusion Statement and Workers Compensation Certificate. Selected contractors must be registered with the Department of Industrial Relations as public works contractors and must accept electronic payments via ACH.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, repair, and certification of emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. The contractor is responsible for inventorying all fixtures, performing functional testing by simulating utility outages, applying durable tracking labels to each fixture, and integrating recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from a surety company with at least an A- rating. Evaluation is based on overall best value. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance requirements include adherence to the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and Executive Order 13706 regarding paid sick leave. Contractors must provide certificates of disposal for hazardous materials and manufacturer warranties for all equipment and workmanship. Final payment is contingent upon a joint substantial completion inspection and the resolution of any punch list items.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves upgrading the network infrastructure at the District's Stockton campus by relocating existing cabling within walls and ceilings in several older buildings, excluding five newer facilities. This work covers network cabling, distributed antenna system wiring, and audio/video surveillance wiring. Currently, cables are surface-mounted in conduits due to the buildings' age, and the project aims to enhance both aesthetics and performance by minimizing visible surface raceways and improving cabling placement. The solicitation, identified as the "2026 Technology Cabling Project" with number 2026-RFQ-019, was posted on May 27, 2026, with a response deadline of July 1, 2026. The project is managed by the Procurement, Contracts & Auxiliary Services office in California, with the primary point of contact being Chalon Rogers, a Senior Procurement Specialist. The work will take place in Stockton, California, and is organized under the State, Local, and Education (SLED) category. Interested parties can find additional information and submit responses through the designated procurement portal.

General Info

Upgrade network cabling inside Stockton campus buildings, excluding five newer facilities, for improved performance.

Documents

12

2026 Technology Cabling Project RFQ San Joaquin Delta College

PDF, High priority: read this firstrfq
High

Agreement to be Bound for San Joaquin Delta Community College District PLA

PDF, High priority: read this firstagreement-to-be-bound
High

Cabling Project SOQ Responsiveness Checklist

PDF, High priority: read this firstsources-sought
High

RFQ-2026-019 Technology Cabling Project Qualification Questionnaire

PDF, High priority: read this firstsources-sought
High

San Joaquin Delta CCD Design-Build Contract for Technology Cabling Project

PDF, High priority: read this firstcontract-document
High

Technology Cabling Project Design-Build RFQ Document Chart

DOCX, High priority: read this firstrfq
High

Acknowledgement of Addenda for Technology Cabling RFQ

PDF, Low priorityacknowledgement-of-addenda
Low

Applicant Declaration for Technology Cabling RFQ

PDF, Low priorityapplicant-declaration
Low

Attachment E - Cabling Non-Discrimination Declaration

PDF, Low priorityother
Low

Authority to Release Information for Technology Cabling RFQ/RFP

PDF, Low priorityauthorization-to-release-information
Low

Conflict of Interest Certification for Technology Cabling RFQ

PDF, Low priorityconflict-of-interest-certification
Low

Non-Collusion Declaration for Technology Cabling RFQ

PDF, Low prioritynon-collusion-declaration
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement, Contracts & Auxiliary Services
Contacts1 person available
OfficeStockton, CA, 95207, USA
Office AddressStockton, CA, 95207, USA
Contacts
Chalon RogersSr. Procurement Specialist

Interested Companies (33)

ZeektekRoseville, CA
The Builders' Exchange of San Joaquin
ExhibitOneTempe, AZ

See All 33 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project addresses network cabling, distributed antenna system wiring, and audio/video surveillance wiring in legacy buildings at the District's Stockton campus, excluding five newer facilities. Due to the age of these structures, cables are currently surface-mounted in conduits. The District intends to relocate cabling within walls and above ceilings, or minimize surface raceways, to improve aesthetics and infrastructure performance.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS