Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

2026 Water Plant Rehabilitation - Westador Municipal Utility District

Active
6ae29b9e93331d86a3983150State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2026 Water Plant Rehabilitation project for the Westador Municipal Utility District in Bellaire, Texas, involves extensive maintenance and repair of several storage units. The primary focus is on Ground Storage Tank No. 1, which requires full interior blasting and recoating, seal welding of patches on the floor, walls, and roof, and various structural repairs to gusset plates, rafters, and the center ring. Additional work for this tank includes replacing the interior water fill line and overflow weir box, as well as touch-up coating for the exterior walls and roof vents. Ground Storage Tank No. 2 requires interior roof blasting and recoating, roof patch seal welding, and the replacement of the interior access ladder, along with exterior touch-up coating for drain lines and fill lines. Furthermore, the project includes interior and exterior touch-up coating for Hydropneumatic Tanks No. 1 and No. 2. Responses for this solicitation are due by November 13, 2026.

General Info

Westador MUD water plant rehabilitation project involving storage tank repairs due November 13, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Westador Municipal Utility District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Work includes blasting and recoating the entire interior of Ground Storage Tank No. 1; seal welding patches on the Ground Storage Tank No. 1 floor, walls, roof as needed, as encountered after surface preparation and as directed by the engineer; miscellaneous weld repairs, gusset plate connection repair/replacement and partial rafter replacements as needed, encountered after surface preparation of Ground Storage Tank No. 1 and as directed by the engineer; Ground Storage Tank No. 1 center ring repair; touch-up coating the exterior walls , exterior well fill line and roof vents of Ground Storage Tank No. 1; removing and replacing the interior water fill line inside Ground Storage Tank No. 1 including supports and any other accessories; partial replacement of Ground Storage Tank No. 1 roof hatch curb and other miscellaneous metal repairs; removing and replacing the overflow weir box inside Ground Storage Tank No. 1; blasting and recoating the interior roof of Ground Storage Tank No. 2; seal welding patches on the Ground Storage Tank No. 2 roof as needed, as encountered after surface preparation and as directed by the engineer; touch-up coating the roof vents, exterior drain line piping, and exterior surface water fill line of Ground Storage Tank No. 2; removing and replacing the Ground Storage Tank No. 2 interior access ladder; touch-up coating the interior and exterior walls of Hydropneumatic Tank No. 1; and touch-up coating the interior and exterior walls of Hydropneumatic Tank No. 2.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement utilizes EJCDC standard forms and requires the contractor to provide performance and payment bonds, as well as insurance from companies with an A.M. Best rating of A-VII or better. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Performance begins upon a written Notice to Proceed, and the contractor is responsible for all site-specific safety programs and adherence to technical standards such as NEMA, ASTM, and AMCA.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester, Virginia, has issued solicitation ITB-2026141 for the Jefferson Street Pump Station Replacement. The project involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements include the demolition of existing facilities and the relocation of a fuel tank. All work must be completed within 610 calendar days following the Notice to Proceed, with performance governed by the City of Winchester Standards Manual and VDOT 2020 Road and Bridge Specifications. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, and must be submitted exclusively through the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder registered in the Commonwealth of Virginia. Bidders must provide a bid guarantee via certified check or bid bond, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract amount. Compliance requirements include adherence to the Davis-Bacon Act, OSHA standards, and ADA accessibility for all new sidewalks and ramps. Contractors must certify against the use of forced or child labor for subcontracts over 10,000 dollars and comply with various non-discrimination executive orders. Evaluation factors for the award include bidder qualifications, a detailed Quality Management Plan, a Timeliness Tracking Plan, and a minimum of three references for similar projects. Payment is based on the actual percentage of work completed as determined by the Engineer, with standard payment terms set at 30 days.
WG Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS