Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Water Well 43 Pilot Hole and Development Project

Closed
20260720016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The City of Delano is soliciting bids for the drilling and development of a new water well, designated as Well 43, to a total depth of 1,020 feet. The scope of work includes drilling an 18-inch diameter pilot hole using the reverse rotary method, followed by reaming to a 28-inch diameter. The contractor is responsible for furnishing and installing approximately 720 feet of 16-inch solid casing and 300 feet of 16-inch perforated casing, along with zone isolation sampling, gravel envelope installation, annular sealing, and associated tubing. Additional tasks encompass deep water sampling, electronic logging, well development through swabbing, airlifting, pumping, surging, production testing, and a final video inspection. All work must comply with applicable industry standards including AWWA C900, NEMA MG 1, and NEMA 250, as well as local, state, and federal codes. The contractor must submit detailed record documents, operations and maintenance manuals, testing reports, and warranties upon completion. The project is to be performed at the designated site in Delano, California, with all work executed on-site under the supervision of the City’s representative. The contract is structured as a Firm Fixed Price arrangement, with payment tied to progress submissions and final acceptance upon satisfactory completion. The City retains final authority for all inspection and acceptance decisions, and independent testing agencies may be engaged for verification, though approval authority remains solely with the City. Bids must be submitted as sealed physical packages with wet ink signatures by the deadline of August 13, 2026, and electronic submissions are not accepted. The lowest responsible and responsive bidder will be selected for award, following a Lowest Price Technically Acceptable methodology. Contractors must provide performance and payment bonds amounting to 100% of the contract value, along with specific insurance coverage and proof of registration with the California Department of Industrial Relations. Unauthorized personnel, including visitors, must be logged and wear identification badges, and no photography or recording is permitted without prior written approval. The proposal must include a signed Bidder’s Statement disclosing any past contract disqualifications, and any affirmative response regarding fraud, bribery, or antitrust convictions within the past three years will result in automatic disqualification. All equipment must be properly labeled with manufacturer identification, approved agency codes, model and serial numbers, and performance characteristics. There is no defined contract value in the solicitation due to blank pricing fields in

General Info

Drill 1,020-foot water well in Delano with 16-inch casing, casing, sealing, and development by August 13, 2026.

Agency

California → City of DelanoView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Delano, CA, 93215, USA

Set-Aside

NONE

Documents

(1)

Bid Package for 2026 Water Well 43 Pilot Hole and Development Project

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Delano
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Delano
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Bid #2026_WTR_002: The project consists of drilling and developing a new water well (Well 43) to a depth of 1,020 feet. The work includes drilling an 18-inch diameter pilot hole using the reverse rotary method, collecting deep water samples, and performing electronic logging. The pilot hole will then be reamed to a 28-inch diameter. The contractor will furnish and install approximately 720 feet of 16-inch solid casing and 300 feet of 16-inch perforated casing. Additional work includes zone isolation sampling, installation of a gravel envelope, annular seal, and associated tubing. The project concludes with well development activities such as swabbing, airlifting, pumping, surging, production testing, and a final well video inspection.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS