This Solicitation opportunity from Illinois was posted on January 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Urbana is seeking a qualified contractor to carry out demolition and site remediation at 211 N Race Street, Urbana, Illinois. The project involves demolishing an approximately 22,500-square-foot building and restoring the site to a mixed-use lot featuring asphalt and grass. Due to the presence of known asbestos and soil contaminants, the contractor must employ specialized procedures to ensure safe removal and disposal, minimizing environmental and health risks. The contract is valued between $300,000 and $600,000 and is managed by the Illinois Public Works - Engineering department.
Interested bidders are encouraged to respond by March 4, 2025, with the project details accessible through the city’s procurement portal. The primary point of contact for inquiries is Ray Garcia, reachable via email or phone. This project emphasizes environmental safety and regulatory compliance, requiring the contractor to handle hazardous materials carefully while completing the demolition efficiently to facilitate future site use.
PDF, High priority: read this firstinspection-report
HighAI Summary for 2023_09_City_of_Urbana_205_N_Race_Street_Asbestos_Inspection_Report: Asbestos Inspection Report for the commercial building at 205 N. Race Street, Urbana, IL, completed in September 2023 by Ideal Environmental Engineering, Inc. The report details the purpose of inspection for demolition, scope of work, and compliance with EPA and Illinois asbestos regulations. It includes general building information, site photos, and a comprehensive summary of sampled asbestos-containing materials (ACM) and non-ACM areas with analysis results, asbestos content, friability, and condition assessments. The report is intended to guide safe demolition practices and identify asbestos hazards prior to demolition activities.
PDF
PDF, High priority: read this firstcomprehensive-site-investigation-report
HighAI Summary for 23-1718 Comprehensive Site Investigation Report and Remedial Action Plan: This document is the Comprehensive Site Investigation Report, Remedial Objectives Report, and Remedial Action Plan (CSIR/ROR/RAP) prepared by Fehr Graham & Associates, LLC for the City of Urbana, dated September 17, 2024. It covers the environmental site investigation at 211 North Race Street, Urbana, Illinois, including site characterization, sampling plans, field activities, and evaluation of contaminants. The report identifies key contaminants exceeding remediation objectives and proposes remedial strategies such as soil excavation and institutional controls to protect human health and the environment in preparation for site redevelopment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Abatement Design Drawings and General Notes: This document contains abatement design drawings and general notes related to asbestos abatement work. It includes detailed instructions for removal and disposal of various materials such as carpet, suspended ceilings, vinyl flooring, drywall, plaster, and other building components. The notes specify procedures for securing containment areas, installing critical barriers, and cleaning support structures. The document emphasizes sequential work in containment areas and the requirement for acceptable clearance results before proceeding. It serves as a technical guide for asbestos abatement contractors, outlining preparation, removal, and disposal protocols to ensure compliance with abatement specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Asbestos Abatement Scope and Specifications Final: This document is the final scope and specifications for an asbestos abatement project for the City of Urbana. It defines key roles including Owner, General Contractor, Environmental Consultant, Abatement Contractor, and Asbestos Project Manager/Air Sampling Professional. It outlines regulatory requirements from IDPH, EPA, and OSHA, and details qualifications for the Abatement Contractor and APM/ASP, including licensing, experience, insurance, and safety protocols. The scope of work includes removal and legal disposal of asbestos-containing materials from various building components prior to demolition, with specific quantities and methods described. Contract time is specified as 6 weeks from commencement, with work shifts and hours defined. Responsibilities of Owner, GC, Engineer, and APM/ASP are also detailed to ensure compliance and project completion.
PDF
PDF, High priority: read this firstinspection-report
HighAI Summary for City of Urbana 205 N Race St Asbestos Inspection Report J25693A1: This document is an asbestos inspection report for the commercial building at 205 N. Race Street, Urbana, IL, prepared for the City of Urbana. It is a supplemental report to IDEAL Number 25693 dated September 2023, with completion dates June 19-22, 2024. The inspection was conducted by Ideal Environmental Engineering, Inc. to identify asbestos content in drywall and drywall joint compound systems prior to demolition. Laboratory analysis by McCall & Spero Environmental, Inc. using Transmission Electron Microscopy (TEM) confirmed asbestos presence in several samples, with chrysotile asbestos detected in varying percentages. The report supports compliance with EPA NESHAP and Illinois asbestos abatement regulations and includes detailed sample results and recommendations for handling asbestos-containing materials during demolition.
PDF
PDF, High priority: read this firstmanual-of-practice
HighAI Summary for City of Urbana Class 2 Erosion Control Permit Manual of Practice: This document is the City of Urbana's Class 2 Erosion Control Permit Manual of Practice, detailing requirements and procedures for erosion control permits for land disturbances between 2,000 square feet and one acre. It includes background on stormwater regulations under the Clean Water Act, City-specific permit requirements, application forms, fee schedules, inspection protocols, and detailed erosion control practices such as stabilized construction entrances, perimeter controls, inlet protection, and final site restoration. The manual serves as a comprehensive guide for applicants to comply with local and federal stormwater management regulations, ensuring effective erosion and sediment control during construction activities.
PDF
PDF, High priority: read this firstitb
HighAI Summary for City of Urbana ITB-099 211 N Race Street Demolition & Site Remediation: This Invitation to Bid (ITB) document, released by the City of Urbana on January 6, 2025, solicits qualified contractors for demolition, asbestos abatement, disposal services, and site remediation at 211 N Race Street, Urbana, IL. The project involves demolishing a 22,500 square foot building and addressing known asbestos and soil contamination to prepare the site for mixed-use development. Key dates include a mandatory pre-submittal meeting on January 28, 2025, a question submission deadline of February 24, 2025, and a bid submission deadline of March 4, 2025, at 1:30 pm. The document outlines submission instructions, evaluation procedures, insurance and bonding requirements, and includes multiple technical attachments such as site plans, asbestos reports, and remediation plans.
PDF
PDF, High priority: read this firstapplication-form
HighAI Summary for DRM-1 Site Remediation Program Application for 211 N. Race Street Urbana: This document is the Illinois Environmental Protection Agency's Site Remediation Program (SRP) Application and Services Agreement (Form DRM-1) for the site at 211 N. Race Street, Urbana, IL. It provides instructions and requirements for enrollment in the SRP, including site identification, remediation applicant details, and project objectives. The form requires submission of a detailed remediation site base map and certification by the remediation applicant. It outlines the types of No Further Remediation (NFR) Letters available and the responsibilities of the applicant. The document includes contact information, submission instructions, and a certification statement by the applicant authorizing the agreement and agreeing to comply with relevant environmental regulations.
PDF
PDF, High priority: read this firstform-drm-2
HighAI Summary for DRM-2 Form for 211 N. Race Street Urbana Site Remediation: This document is the Illinois Environmental Protection Agency's DRM-2 Form used to request review of Site Remediation Program plans and reports. It is submitted for the site at 211 N. Race Street, Urbana, IL. The form includes applicant and consultant contact information, a list of submitted documents such as Site Investigation Reports and Remediation Objectives Reports, and a professional engineer's certification. The form is dated 9/17/24 and outlines the legal and procedural requirements for review under the Illinois Environmental Protection Act and related regulations.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Site Plans Demolition Site Plan Notes: This document contains demolition site plan notes for a construction project, including a legend of site features and detailed instructions for asbestos abatement, site remediation, utility protection, and demolition procedures. It emphasizes compliance with environmental and safety regulations, accurate recording of utilities, notification requirements, and site maintenance during construction. The document also includes cautions about existing utilities and coordination with utility companies prior to excavation. The version or date is not specified.
PDF
PDF, High priority: read this firstspecial-provisions
HighAI Summary for Special Provisions for Soil Remediation 23-1718: This document titled 'Special Provisions for Soil Remediation 23-1718' outlines critical requirements for soil disposal and handling in a remediation project. It specifies that soil from the upper four feet below ground surface must be disposed of off-site at a Subtitle D Landfill, specifically the Brickyard Landfill in Danville, Illinois. Imported fill materials must meet Illinois EPA standards under 35 IAC Part 742 TACO Subpart E, with sampling and testing requirements detailed. The document also mandates a site-specific Health and Safety Plan (HASP) addressing contamination hazards, including mercury, arsenic, and dieldrin, to protect workers during construction. These provisions are essential for compliance with environmental regulations and worker safety.
PDF
PDF, High priority: read this firststandards
HighAI Summary for Utility and Right-of-Way Permit Standards Urbana 2024-12-26: This document titled 'Utility and Right-of-Way Permit Standards' dated December 26, 2024, provides comprehensive standards and application procedures for obtaining Utility and Right-of-Way Permits from the City of Urbana Engineering Division. It includes an introduction to the permit purpose, definitions of right-of-way, frequently asked questions about required permits, application requirements including insurance and bonding, permit fees, submission instructions, and timelines for approval. The document also contains detailed standard details such as traffic control, landscaping, driveway, pavement patching, sewer construction, sidewalk, signs, and utility cut details, along with appendices for traffic control standards, supplemental agreements, special use of public right-of-way, café licenses, and news rack space applications. This is a critical document for contractors and utilities performing work in the City right-of-way to ensure compliance and safety.
PDF
PDF, Low priorityenvironmental-report
LowAI Summary for 23-1718 Urbana Prairie Park Sledding Hill Borrow Source Evaluation: This document is a Borrow Source Evaluation report dated December 17, 2024, prepared by Fehr Graham Engineering & Environmental for the City of Urbana Public Works Department. It details limited soil characterization activities at the Prairie Park Sledding Hill Fill Pile site in Urbana, Illinois. The report includes soil sampling and analysis for various compounds using USEPA methods, comparing results to Illinois EPA Tier I Soil Remediation Objectives for residential properties. The findings indicate that soils meet the criteria for reuse up to 3,000 cubic yards without further testing. Attachments include site figures, analytical result tables, laboratory reports, and a prior CCDD investigation from July 2024.
PDF
PDF, Low priorityother
LowAI Summary for BYC Easement Index 2: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for Illinois EPA Conditional Approval Letter for Urbana Site Remediation: This document is a conditional approval letter from the Illinois Environmental Protection Agency (Illinois EPA) dated November 25, 2024, addressed to the City of Urbana regarding the Urbana site remediation at 211 N. Race Street, Urbana, Illinois. It reviews the Comprehensive Site Investigation Report, Remedial Objectives Report, and Remedial Action Plan submitted by Fehr Graham & Associates, LLC. The letter outlines specific comments and requirements for further evaluation, additional sampling, repair of an asphalt parking lot, evaluation of contaminants, offsite notification, and submission of certified documents. It requests submission of revised reports and advance notice of remedial activities.
PDF
PDF, Low priorityother
LowAI Summary for Index of Attachments for Site Work and Remediation: This document is an index listing various attachments related to a project involving site work, asbestos abatement, site remediation, and City of Urbana standards. It categorizes attachments into sections such as site plans, asbestos abatement specifications and reports, site remediation provisions and reports, and local standards and permits. The document serves as a reference guide to the supporting materials for the project.
PDF
PDF, Low priorityother
LowAI Summary for Race Street Easement Exhibit Main St to Griggs St: This document is an easement exhibit for Race Street from Main Street to Griggs Street, created by Urbana Public Works on 12/11/2024. It includes a map scale and a legend describing easement subtypes and dedication. The document appears to be a supporting or reference exhibit related to public works or property easements.
The City of Urbana is seeking a qualified Contractor, to perform demolition and disposal services to demolish the building and return site to a mixed use lot comprised of asphalt and grass. This site has known asbestos and soil contaminates requiring special care be taken. The building is approximately 22,500 square feet and is located at 211 N Race Street, Urbana, IL
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.