Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 24, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

23 -- Drash Trailer w/ Power & Environmental Control Unit

Closed
F3LT177255A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
Federal
Skid Steer
Solicitation # W911S227U0040
Solicitation W911S227U0040 is a Request for Quotation issued by the Department of Defense, specifically the W6QM Micc-Ft Drum, for the procurement of one new skid steer. This acquisition is designated as a Total Small Business Set-Aside under NAICS code 333924. The government is seeking a new piece of equipment, explicitly prohibiting used or remanufactured products. The primary requirement is for a CAT Part Number 255 or an approved equal. The equipment must feature a 74 hp diesel engine, an operating weight of 9578 lbs, and a tipping load of 7140 lbs. Required accessories include a 1576 mm front bucket with bolt-on teeth, 1220 mm forks, a CVP110 compactor, and a 100 mm saw. The contract is awarded to the responsible offeror providing the most advantageous offer based on price and technical evaluations. For products offered as an equal to the brand name, bidders must provide descriptive literature, brand and model identification, and any planned modifications to meet the salient characteristics. Delivery is required on an F.O.B. destination basis, with a preferred delivery window of 30 days. All quotes must be submitted via the PIEE Solicitation module and must include a completed Attachment 1 regarding certifications and country of origin to avoid being rejected as nonresponsive. Payment will be processed through the Wide Area Workflow and electronic submission systems.
W6QM Micc-Ft Drum

POSTED

about 23 hours ago

DEADLINE

in 2 days
NAICS: 333924
New
DIBBS
TRACK, LARGE
Solicitation # SPE4A7-27-T-1529
Solicitation SPE4A7-27-T-1529 is a fixed-price procurement issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the acquisition of four units of Large Track, identified by NSN 1450-00-089-4364. The items are to be delivered to the DLA Distribution DDSP New Cumberland facility in Pennsylvania, with a required delivery date of April 23, 2027. All quotes must be submitted through the DLA Internet Bid Board System (DIBBS). To be eligible for award, offerors must possess an approved US/Canada Joint Certification Program (JCP) certification and DLA controlling authority approval to access export-controlled technical data. The manufacturer's inspection system must comply with ISO 9001:2015 or an equivalent standard, and items produced via additive manufacturing are ineligible for award. Evaluation includes a price preference for certified HUBZone Small Business Concerns. The contract mandates strict adherence to MIL-STD-129 for packaging and RP001 for palletization. Inspection and acceptance will occur at the origin, utilizing zero-based sampling plans such as MIL-STD-1916 or ASQ H1331. Payment and invoicing must be processed electronically via the Wide Area WorkFlow (WAWF) system. Additionally, the procurement is subject to the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 regarding the safeguarding of covered defense information.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

2 days ago

DEADLINE

in 6 days

General Info

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

Place of Performance

310 SG/FM730 Irwin Ave, Ste 83 Schriever AFB, CO 80912, CO

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Sep 24, 2007 to Sep 25, 2007. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2550 50 Cons Pkp
Contacts1 person available
OfficeSCHRIEVER SFB, CO, 80912-2116, USA
Office AddressSCHRIEVER SFB, CO, 80912-2116, USA
Contacts
Ann T YoungContract Specialist

Full Description

Show more
The purpose of this amendment is to: 1) Extend response date to 25 September 2007, 4pm Mountain Standard Time 2) Questions & Answers Q1- Dual Rear Stabilizing Jacks: The system we offer to meet power and ECU requirements does not come with rear stabilizing jacks, is this a rigid requirement? The system components and configuration has been evaluated by DoD at Aberdeen proving grounds. A1- 1. This requirement is largely the result of previous trailers utilizing standard tires (they deform too much to provide a stable base). If the solution offered up utilizes run flat tires (like in a HMMWV) and meets DoD standards, the jacks aren't required. Q2- Spare Tire with Mount Assembly: Our trailers use HMMWV run-flat tires, no spares are provided, is this essential? A2- Similar to Q1, above: Our previous solutions did not use the run flat tires, so a spare was critical. In this case, a spare is highly desired by the customer, but not essential. Q3- Request clarification on two salient characteristics: 12.5 - 20 KW Mounted Quiet Diesel Generator with Removable Protective Cage (Must Operate With or Without Cage in Place) & Mounted Marine Fuel Cell with Minimum 19 Gallon Capacity with Removable Protective Cage (Must Operate With or Without Cage in Place). Generator and ECU are enclosed to protect the systems from debris and provide tactically quiet operation, the cage in or out could be done but I would like to understand why this requirement is needed, it seems the equipment could be damaged or the operator could be placed in an unsafe environment. A3- If the solution offered has the generator, ECU and tank fully enclosed, the cages are not required. The trailers we have used before did not have fully enclosed systems, so the cages were essential for protection when we went OTR or up on the range. We would pull the cages for maintenance, etc. Usually, solutions with this gear fully enclosed have built-in access panels, etc., so a cage would not need to be removed for PMIs, etc. Q4- Please provide item description or define the function of: Mounted Marine Fuel Cell with Minimum 19 Gallon Capacity with Removable Protective Cage (Must Operate With or Without Cage in Place) A4- The fuel cell is just the diesel tankage for the generator. We have used marine cells in the past because they hold up to the elements better, but our gens were not mil spec - a mil spec unit would likely have a fully enclosed gen and fuel cell...which pretty much gives you the same benefits. The cage piece discussed previously: it is just there to protect the fuel cell from debris (falling rocks, tools...and people) during transport and ops. We remove it for PMIs, etc. 3) Revised Salient Characteristics SALIENT CHARACTERISTICS: - 20 Foot Trailer - 2-5/16 Inch Adjustable Ball Hitch with Conversion Kit for DOD standard pintle hook assembly - Dual Rear Stabilizing Jacks; Not Required if Solution utilizes Run Flat Tires that meet DoD standards - Minimum 12 Inch Ground Clearance - Spare Tire with Mount Assembly; Not Required if Solution Utilizes Run Flat Tires - MOB42 ECU with Canvas or Similar Dust Cover (ECU with Minimum 96,000 BTU Cooling Capacity & 33,000 BTU Heating Capacity, Minimum Dual Supply Ducts, Single Return Duct, On-Board Thermostat with Emergency Cut-Off. - 12.5 - 20 KW Mounted Quiet Diesel Generator with Removable Protective Cage (Must Operate With or Without Cage in Place); Cage is not required if ECU and Tankage is fully enclosed with - Mounted Marine Fuel Cell with Minimum 19 Gallon Capacity with Removable Protective Cage (Must Operate With or Without Cage in Place); Cage is not required if ECU and Tankage is fully enclosed - Cargo Area must have Lash Points and Topless Cage with Pull-Off Rear Access Gates for Storage Area

More opportunities from Department Of Defense → FA2550 50 Cons Pkp

Same awarding agency

NAICS: 236220
Federal
USSF Construction CSO
Solicitation # USSF-CSO-FY26-2808A
The United States Space Force (USSF) Space Operational Contracting Headquarters has established a Master Commercial Solutions Opening (CSO) under solicitation number USSF-CSO-FY26-2808A to streamline the design, construction, repair, and alteration of base infrastructure. Authorized under 10 U.S.C. § 2808a, this framework utilizes Other Transaction (OT) authority, making all resulting agreements completely exempt from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS). The Master CSO serves as an umbrella solicitation, with specific project requirements published separately as Areas of Interest (AOIs). All awards must be structured as fixed-price agreements, including firm-fixed-price, fixed-price incentive, or fixed-price award fee structures, while cost-reimbursable agreements are strictly prohibited. The solicitation process employs a phased down-select method to minimize industry costs, consisting of a Phase 1 White Paper, a Phase 2 Oral Pitch, and a Phase 3 Full Commercial Proposal. Evaluation focuses on technical merit, constructability, schedule viability, and fair and reasonable commercial pricing. Selected partners must adhere to commercial industry building codes such as IBC and NEC, and may be required to comply with Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) standards. Payment is managed through a milestone-based system, where fixed-price payments are triggered only upon the verifiable completion of work that has passed inspection. Additionally, contractors must comply with Davis-Bacon Act wage rates and maintain specific insurance coverages, including Professional Liability for design-build projects of at least $2M.
Commercial and Institutional Building Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS