230-kV Transmission Line Steel Pole Recoating Project near Florin Perkins Road and Elder Creek Road

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento Municipal Utility District is undertaking the 230-kV Transmission Line Steel Pole Recoating Project near Florin Perkins Road and Elder Creek Road in Sacramento, California. The primary objective is to extend the lifespan of seven 125-foot-tall steel transmission poles by performing surface preparation and applying new coatings to mitigate rust and corrosion. The project is scheduled to take place from approximately October 20, 2025, through November 8, 2025, with maintenance activities occurring daily between 6 am and 6 pm. While the 230-kV lines will be de-energized for the work, no disruption to customer power is expected. The work area is located within a heavy industrial zone, and the project includes minor grading near pole 988 to ensure safe operation of high-lift aerial platforms. The technical scope varies by pole number to ensure effective maintenance and environmental safety. For poles 983, 984, and 985, contractors will construct scaffolding to perform sandblasting for coating removal from the base up to 50 feet, followed by an overcoat method for the remaining height. These poles require a full containment system to capture blasting materials and heavy metals from the existing coating for compliant disposal. For poles 982, 986, 987, and 988, an overcoat method will be used via high-lift aerial platforms, utilizing brushes and rollers rather than spray to prevent particulate release. Spot corrosion mitigation will involve vacuum-attached bristle brushes to capture debris. Strict safety protocols, including the use of P-100 respiratory protection and specialized clothing, will be enforced to prevent human and environmental exposure to dust and metals.

General Info

SMUD will recoat seven steel transmission poles in Sacramento from October to November 2025.

Agency

California → Sacramento Municipal Utility District

NAICS

N/A

Place of Performance

Florin Perkins Road and Elder Creek Road, Sacramento, CA, 58928

Set-Aside

NONE

Documents

(1)

SMUD 230-kV Transmission Line Steel Pole Recoating Project NOE 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sacramento Municipal Utility District
Office AddressN/A
Contacts
Ammon RiceSupervisor, Environmental Services

Full Description

Show more
SMUD proposes surface preparation and coating of seven 125-foot-tall 230 kilovolt (kV) transmission line steel poles. The poles were installed in 1980’s timeframe and require new coatings to help maintain the poles. The goal of the proposed project is to extend the life of the steel transmission poles by recoating the poles to mitigate rust and corrosion. Activities will include constructing scaffolding around the transmission poles numbered 983, 984 and 985, masking, protecting, washing, spot preparation, painting with primer, an intermediate coat, and finishing coat. These 3 poles will require existing coating to be removed from the base and up to 50 feet with sand blasting. From 50 feet up to the top pf the poles, we will utilize an overcoat method, new paint over the existing. The existing coating contains heavy metals. A full containment system will be constructed to capture the coating and blasting material. The old coating will be captured and disposed of in compliance with applicable laws and regulations. The effects of coating transmission poles on the environment have been evaluated and the project will comply with environmental and safety regulations to prevent exposure to human health and the environment. Pole numbers 982, 986, 987 and 988 will be treated using an overcoat method, new paint over old. Painters will use a high lift aerial platform to gain access to all parts of the poles. Spot corrosion mitigation will occur at these poles using a bristle brush with vacuum attachment to capture debris that is removed. The overcoat method paint will be applied with brushes and rollers; no spray shall be utilized in areas that are not fully contained. This project will require minor grading adjacent to pole 988 to level the ground and allow a high lift aerial platform to operate safely on flat ground. No environmental impacts are expected to occur from the proposed project. The project is in an area zoned by the City of Sacramento as heavy industrial, (City of Sacramento Planning and Development Code September 2014). The 230-kV lines will be de-energized for the recoating work, however, there will be no disruption to customer’s power. Maintenance will occur between the hours of 6 am through 6 pm, seven days a week. The project will occur on or around October 20, 2025, through November 8, 2025. Proper protective measures will be used to ensure exposure to metals (no lead detected) and dust does not occur. Protective measures include appropriate respiratory protection (minimum P-100 air purifying half mask), covering for work clothes (e.g. Tyvek), gloves, and proper training. The painting contractors will comply with all environmental regulatory requirements by capturing removed coatings generated and employing Best Management Practices (BMPs) to control releases of coating particulates into the surrounding environment. These measures consist of full containment systems with scaffolding and wrappings and installing a plastic tarp at the base of each tower to collect coatings particulates and debris. The coating particulates and debris will be collected and consolidated in DOT specified containers and marked and labeled prior to removal for offsite disposal. Additional sheeting will be used where there is the possibility of material entering storm drains or being transmitted onto adjacent properties.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS