230-kV Transmission Line Steel Pole Recoating Project near Florin Perkins Road and Elder Creek Road

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento Municipal Utility District (SMUD) will undertake a transmission pole recoating project to extend the service life of seven 125-foot-tall 230-kilovolt steel poles located near Florin Perkins Road and Elder Creek Road in Sacramento, California. The work, scheduled from October 20 to November 8, 2025, will occur between 6 a.m. and 6 p.m., seven days a week, with no disruption to customer power. Poles numbered 983, 984, and 985 will undergo full coating removal from the base up to 50 feet via sandblasting, followed by application of a three-coat system consisting of primer, intermediate, and finish coats. The upper portion of these poles and all other poles—982, 986, 987, and 988—will be recoated using an overcoat method, applying new paint directly over existing coatings. Scaffolding will be erected around poles 983, 984, and 985, and a high-lift aerial platform will be used for access to all poles. Minor grading will be performed adjacent to pole 988 to ensure safe platform operation. Existing coatings contain heavy metals, and a full containment system—including scaffolding wraps, plastic tarps at the pole bases, and secondary sheeting near storm drains and adjacent properties—will be implemented to capture all debris. Removed coating materials will be collected, consolidated in DOT-compliant containers, properly marked and labeled, and transported offsite for hazardous waste disposal. All workers will use P-100 respirators, Tyvek suits, gloves, and adhere to strict safety protocols to prevent exposure to dust and heavy metals. The project is conducted under a CEQA categorical exemption for existing facilities and minor land alterations and complies fully with environmental and safety regulations. No spray painting will be used outside fully contained areas, and all surface preparation and coating application will follow Best Management Practices to prevent environmental release. The work takes place within a heavy industrial zone in Sacramento, and no environmental impacts are anticipated. While the contract does not include formal FAR clauses, award criteria, pricing details, or contractual specifications beyond operational and environmental mandates, the project is overseen by SMUD's Environmental Services Supervisor, Ammon Rice, who serves as the primary point of contact. All waste handling, worker protection, and containment measures are designed to meet DOT and state

General Info

SMUD to recoat seven 230-kV steel poles near Florin Perkins Road with full containment and hazardous waste disposal.

Agency

California → Sacramento Municipal Utility District

NAICS

N/A

Place of Performance

Florin Perkins Road and Elder Creek Road, Sacramento, CA, 58928

Set-Aside

NONE

Documents

(1)

SMUD 230-kV Transmission Line Steel Pole Recoating Project NOE 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sacramento Municipal Utility District
Office AddressN/A
Contacts
Ammon RiceSupervisor, Environmental Services

Full Description

Show more
SMUD proposes surface preparation and coating of seven 125-foot-tall 230 kilovolt (kV) transmission line steel poles. The poles were installed in 1980’s timeframe and require new coatings to help maintain the poles. The goal of the proposed project is to extend the life of the steel transmission poles by recoating the poles to mitigate rust and corrosion. Activities will include constructing scaffolding around the transmission poles numbered 983, 984 and 985, masking, protecting, washing, spot preparation, painting with primer, an intermediate coat, and finishing coat. These 3 poles will require existing coating to be removed from the base and up to 50 feet with sand blasting. From 50 feet up to the top pf the poles, we will utilize an overcoat method, new paint over the existing. The existing coating contains heavy metals. A full containment system will be constructed to capture the coating and blasting material. The old coating will be captured and disposed of in compliance with applicable laws and regulations. The effects of coating transmission poles on the environment have been evaluated and the project will comply with environmental and safety regulations to prevent exposure to human health and the environment. Pole numbers 982, 986, 987 and 988 will be treated using an overcoat method, new paint over old. Painters will use a high lift aerial platform to gain access to all parts of the poles. Spot corrosion mitigation will occur at these poles using a bristle brush with vacuum attachment to capture debris that is removed. The overcoat method paint will be applied with brushes and rollers; no spray shall be utilized in areas that are not fully contained. This project will require minor grading adjacent to pole 988 to level the ground and allow a high lift aerial platform to operate safely on flat ground. No environmental impacts are expected to occur from the proposed project. The project is in an area zoned by the City of Sacramento as heavy industrial, (City of Sacramento Planning and Development Code September 2014). The 230-kV lines will be de-energized for the recoating work, however, there will be no disruption to customer’s power. Maintenance will occur between the hours of 6 am through 6 pm, seven days a week. The project will occur on or around October 20, 2025, through November 8, 2025. Proper protective measures will be used to ensure exposure to metals (no lead detected) and dust does not occur. Protective measures include appropriate respiratory protection (minimum P-100 air purifying half mask), covering for work clothes (e.g. Tyvek), gloves, and proper training. The painting contractors will comply with all environmental regulatory requirements by capturing removed coatings generated and employing Best Management Practices (BMPs) to control releases of coating particulates into the surrounding environment. These measures consist of full containment systems with scaffolding and wrappings and installing a plastic tarp at the base of each tower to collect coatings particulates and debris. The coating particulates and debris will be collected and consolidated in DOT specified containers and marked and labeled prior to removal for offsite disposal. Additional sheeting will be used where there is the possibility of material entering storm drains or being transmitted onto adjacent properties.