Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

23001 SX0 Long Quarter Interceptor Rehabilitation

Active
BPM058911State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Baltimore County Government, through the Department of Public Works and Transportation, is soliciting bids for the Long Quarter Interceptor Rehabilitation project (Solicitation 23001 SX0). This water and sewer utilities project is located across Districts 8c3 and 9c3 in Lutherville, Timonium, Loch Raven, and Towson, Maryland. The scope of work includes the rehabilitation of 8,400 linear feet of CIPP lining (8-42 inches) and 5,840 linear feet of sprayed-in-place liner (60-66 inches), along with manhole lining using cementitious, epoxy, and SAPL materials. Additionally, the contractor must grade 466,100 square feet to provide site access and implement all necessary flow control measures. The project has a performance period of 365 calendar days. Bidders must meet a 22 percent MBE/WBE participation goal and submit required documentation, including Forms A, B, B-Prime, and a signed Form C at the time of bid submission. Evaluation factors emphasize contractor and product experience, timely submittals, and compliance with prevailing wage requirements. Prequalification F-6 and Cost Group H are specified. Technical requirements include strict adherence to ASTM F1216 for alternative CIPP curing and specific testing protocols for manholes and SAL installation, verified by independent third-party lab technicians. The bid opening is scheduled for October 29, 2026, and all submissions must include a signed acknowledgment of Addendum No. 1.

General Info

Baltimore County seeks bids for water and sewer interceptor rehabilitation in Maryland.

Documents

1

Contract 23001 SX0 Long Quarter Interceptor Rehabilitation - Addendum No. 1

PDF, High priority: read this first20 pages · amendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaryland → Baltimore County Government
Contacts1 person available
OfficeMD, USA
Office AddressMD, USA
Contacts
Barbara WENTWORTHProcurement Officer / Buyer

Full Description

Show more
To obtain the solicitation, specifications, drawings, addendums and award information see link below or call +1 (555) 000-0000.https://www.baltimorecountymd.gov/departments/public-works/engineering/contracts/current-solicitations
Category: Water and sewer utilities
Additional Instructions: To obtain the solicitation, specifications, drawings, addendums and award information see link below or call +1 (555) 000-0000.https://www.baltimorecountymd.gov/departments/public-works/engineering/contracts/current-solicitations
Procurement Goals: MBE: 0.22

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operational station equipped with mechanical and electrical systems, a generator, odor control equipment, stormwater facilities, and fencing. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide a bid bond and, upon award, furnish performance and payment bonds along with proof of insurance. The project is governed by EJCDC standard general and supplementary conditions. Payment is processed via monthly applications for payment submitted to the Engineer, with payments becoming due thirty days after presentation to the owner. Performance begins upon the issuance of a Notice to Proceed, and the work must adhere to strict technical standards, including NEMA, ASTM, and AMCA specifications.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of open and covered concrete structures, relining or replacement of steel and ductile iron piping and supports, and the installation of valves and piping appurtenances. Additional technical requirements involve the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. A critical requirement for all subcontractors is the mandatory use of union labor. Additionally, potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and concrete restoration, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Maryland → Baltimore County Government

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS