Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

24-037 Gull Point Community Center Earth Stabilization Project

Closed
24-037State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Gull Point Community Center Earth Stabilization Project, solicitation number 24-037, is issued by the City of Pensacola Department of Public Works and Facilities to address critical erosion and drainage failures within Baywoods Gulley. The project focuses on repairing or replacing failed reinforced concrete pipes and clearing sediment and debris from the storm drainage system extending from Spanish Trail Road to the bottom drop inlet. To ensure long-term stability, the contractor will grade the west end of the gulley to a consistent slope, install pinned sod, and replace riprap lined with filter fabric around the structure. Additional requirements include the placement of stone at the site entrance to prevent contamination, ongoing landscape maintenance until sod rooting is successful, and the provision of a full erosion control plan meeting FDEP standards. Managed under NAICS code 237110, this solicitation requires bidders to submit proposals by June 28, 2024, accompanied by a certified check or bid bond for 5 percent of the base bid. The comprehensive project manual and construction plans outline detailed specifications for demolition, storm sewers, concrete work, and asphalt pavement. Due to limited site access, the project may necessitate construction easements. Interested parties are directed to the City of Pensacola's procurement guidelines, with primary coordination handled through the Engineering and Construction Services Division.

General Info

City of Pensacola project for Baywoods Gulley erosion repair and drainage stabilization.

Documents

2
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstitb
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Pensacola
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → City of Pensacola
Office AddressN/A

Full Description

Show more
This project shall correct an erosion problem caused by a failed concrete storm pipe located inside of Baywoods Gulley. Currently, water does not flow through the pipes and westmost inlet box as designed. Rather, the water channelizes down the slope surface, carrying sediment downhill causing sediment deposits downstream. This all creates an unpredictable and unserviceable stormwater control area. The failed stick (or sticks) of reinforced concrete pipe (RCP) shall be repaired or replaced as needed. Sediment and debris shall be completely removed from the storm drainage system from Spanish Trail Road to the drop inlet at the bottom of the gulley. After the pipes and inlet are repaired, the west end of Baywoods Gulley shall be graded to a consistent slope that drains into the inlet box at the bottom of the gulley. The slope shall be stabilized with pinned sod. Riprap lined with filter fabric shall be replaced around the structure to prevent erosion. The contractor shall place stone at the site entrance to stabilize the ground and prevent contamination outside the site entrance. The contractor shall be responsible for maintenance of the landscape until the sod has successfully rooted to the slope. A full erosion control plan to FDEP standards shall be furnished by the contractor. This project may require construction easement due to limited site access.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS