This Solicitation opportunity from Ohio was posted on October 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work primarily consists of receiving and installing owner-purchased major equipment, including liquid-filled step-down transformers, circuit breakers, and switches. The contractor is responsible for the installation of 69kV structures, foundations, bus work, and conduit, as well as site grading, drainage, and fencing. Final payment is contingent upon the satisfactory energizing and acceptance of the total system by the owner.
The contract is governed by the 2018 EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Bidders must provide a bid bond of no less than 10 percent of the total bid amount, and the successful awardee must furnish performance and payment bonds equal to the full contract price. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace requirements is mandatory. Award selection will be based on a comparison of the relative merits of each offering, with the owner reserving the right to select the best bid considering pertinent quality and price factors.
General Info
City of Piqua seeks bids for 69kV substation electrical construction estimated at $1,310,000.
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addendum #2 - Project 24-17.10 Electrical Construction Piqua 69kV The Site Substation: Addendum No. 2 dated October 6, 2026, for the City of Piqua project 24-17.10 (Electrical Construction Piqua 69kV The Site Substation). This document updates the bid bond percentage requirement to no less than 10%.
PDF
PDF, High priority: read this first6 pages · amendment
HighAI Summary for Addendum No. 1 - Piqua The Site Substation & Transmission Line: Addendum No. 1 for Project No. 24-17.XX regarding the Piqua 69kV The Site Substation & Washington Road 69kv Transmission Line. The document provides clarifications to bidder questions across multiple packages, including Control Building and Relay Panels (24-17.9A), Major Equipment (24-17.9B), and Substation Electrical Construction (24-17.10). Key updates include bid deadline extensions to October 21st and 22nd, guidance on award structures, and technical clarifications regarding site preparation, equipment weights, and documentation references.
PDF
PDF, High priority: read this first7 pages · amendment
HighAI Summary for Addendum No. 2 - Piqua The Site Substation & Transmission Line: Addendum No. 2 for Project No. 24-17.XX (Piqua 69kV The Site Substation & Washington Road 69kv Transmission Line) issued by Encompass Engineers and Architects, Inc. for the City of Piqua, Ohio. The document provides technical clarifications in response to bidder questions regarding control building relay panels, major equipment specifications, steel structures, substation and transmission line construction (including fiber optic ADSS cable requirements and tree clearing responsibilities), and drilled pier foundations. It also clarifies prevailing wage documentation requirements.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addendum No. 3 - Project 24-17.10 Electrical Construction Piqua 69kV The Site Substation: Addendum No. 3 dated October 19, 2026, for the City of Piqua's Electrical Construction project (24-17.10). This document extends the bid opening date to October 29, 2026, at 11:00am EDT and updates the Bid Bond percentage requirement to no less than 10%.
PDF
PDF, High priority: read this first14 pages · specifications
HighAI Summary for Appendix A - Electrical Drawing Set - Piqua Substation: Technical electrical drawing set for the Piqua Substation project in Piqua, Ohio. The document includes an index of drawings (one-line, plan views, elevations, grounding, and conduit plans), a legend for control and protection logic, and specific technical details for the power system. Prepared by Encompass Engineers & Architects for the City of Piqua, dated 7/20/26.
PDF
PDF, High priority: read this first2 pages · bid-bond
HighAI Summary for Bid Guaranty Bond for City of Piqua Project: This Bid Guaranty Bond document serves as a surety agreement between the bidder (principal) and surety to the City of Piqua (owner) for a specified project. It guarantees the bidder's commitment to enter into a contract if awarded and to perform according to the bid, plans, and specifications. The bond penal sum equals the bid amount or a specified minimum, ensuring financial coverage if the bidder defaults. The surety's liability is limited to the penal sum. The bond also covers payment claims by subcontractors and material suppliers. The document includes signature blocks for the bidder, surety, and surety agent, and stipulates that modifications to the contract do not affect the surety's obligations. This bond is a critical part of the bidding process to protect the owner from bidder default.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for C-1.0 Civil Site Plan - Conceptual Grading Plan: A conceptual grading and civil site plan for a crowned fenced area with a perimeter swale. The document specifies grading slopes (0.5%), dimensions for crowns/pads, and the use of lightweight concrete masonry bricks for the swale and curb.
PDF
PDF, High priority: read this first82 pages · ifb
HighAI Summary for City of Piqua - 69kV The Site Substation Electrical Construction (Project 24-17.10): Invitation for Bids (IFB) and technical specifications for the electrical construction of the 69kV The Site Substation for the City of Piqua, Ohio. Dated September 2026, the document includes a legal notice, bid submission requirements, an engineer's estimate of $1,310,000, and a detailed index of specifications and drawings. Bids are due by October 19, 2026.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for City of Piqua Project 24-17.10 - Electrical Construction Piqua 69kV The Site Substation: Advertisement for Bids issued by the City of Piqua, Ohio, for project #24-17.10 regarding electrical construction at the Piqua 69kV The Site Substation. Bids are due by 11:00am on October 19, 2026, and can be submitted via Bid Express, email, or hard copy. The notice includes submission instructions, plan availability, and was advertised on September 6, 2026, under Resolution No. R-136-25.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for E-7.1 - Conduit Schedule: Technical conduit schedule detailing conduit numbers, cable numbers, routing (from/to), sizes, PVC fitting requirements, and approximate lengths for electrical infrastructure, including transformers and breaker bays.
PDF
PDF, High priority: read this first77 pages · contract-document
HighAI Summary for EJCDC C-700 Standard General Conditions of the Construction Contract (2018): This document is the 2018 EJCDC C-700 Standard General Conditions of the Construction Contract, prepared by the Engineers Joint Contract Documents Committee. It establishes the legal framework and standard terms for construction contracts, covering critical areas such as definitions, bonds and insurance, contractor and owner responsibilities, change orders, claims, and dispute resolution.
PDF
PDF, High priority: read this first15 pages · specifications
HighAI Summary for EJCDC C-800 Supplementary Conditions of the Construction Contract: This document contains the Supplementary Conditions for a construction contract, based on the 2018 EJCDC C-800 template (revised 01.2022). It serves to amend or supplement the EJCDC C-700 Standard General Conditions, specifically addressing insurance requirements, document delivery, commencement of work, and site conditions.
PDF
PDF, High priority: read this first4 pages · wage-determination
HighAI Summary for Payroll Submittals and Wage Determination Document: This document outlines the requirements for payroll submittals and prevailing wage determinations for public improvement projects as per Ohio Revised Code Sections 4115.03 to 4115.16. It details contractor obligations to submit certified payrolls, schedules of pay dates, and notifications to employees. The document includes penalties for violations and specifies the duties of contractors regarding wage rate postings, payroll reporting, and compliance affidavits. It serves as a guide for contractors to ensure adherence to prevailing wage laws and proper documentation throughout the contract period.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Piqua 69kV Site Substation - Civil Site Plan Details: Technical civil site plan details for the Piqua 69kV Site Substation on Washington Road, Piqua, Ohio. The document specifies swale dimensions, profiles, low-flow channel requirements (2-4 inch stone on geotextile), and culvert specifications (18 inch, 40 LF) for the proposed drive.
XLSX
XLSX, High priority: read this first4 pages · bid-schedule
HighAI Summary for PIQUA ELECTRICAL CONSTRUCTION BID TABULATION: A detailed bid tabulation and material list for electrical construction, specifically focusing on 69kV structures, foundations, major equipment (transformers, circuit breakers, switches), and bus work. It includes quantities, unit types, manufacturer details, and specific bid item references (e.g., EL-200, SS-100, ME-500).
XLSX
XLSX, High priority: read this first4 pages · bid-tabulation
HighAI Summary for Piqua Electrical Construction Bid Tabulation - Package 24-17.10: Bid tabulation document for the City of Piqua, Ohio, regarding the 69kV Site Substation Electrical Construction (Bid Package 24-17.10), dated September 1, 2026. The document contains detailed bid items for steel structures, foundations, major equipment (transformers, breakers, switches), and bus work, including quantities, unit descriptions, and manufacturer part numbers.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for Piqua The Site Substation - Foundation Drawing Set: Preliminary for bid foundation drawing set for the Piqua 'The Site' Substation in Piqua, Ohio. Dated 7/20/2026, the document includes an index of drawings (foundation plans, details, and oil retention plans) and initial foundation design notes requiring contractor correlation of dimensions.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Guide for Contractors - 2026: A comprehensive guide detailing the responsibilities of contractors regarding Ohio's prevailing wage laws (Chapter 4115 of the Ohio Revised Code) for the 2026 period. It outlines project cost thresholds for applicability, penalties for violations, requirements for apprentice ratios, payroll record-keeping, and specific instructions for submitting certified payroll reports.
PDF
PDF, High priority: read this first71 pages · wage-determination
HighAI Summary for Prevailing Wage Rate Schedule (LCN01-2026ib): Prevailing wage rate document listing skilled craft wage determinations and fringe benefit rates for multiple unions and classifications. Includes effective dates ranging from 2013 to 2026, change numbers (e.g., LCN01-2026ib, LCN02-2013fb), apprentice/journeyman ratios, jurisdictions, special jurisdictional notes, and detailed rate tables for asbestos workers, insulators, boilermakers, and bricklayers. This appears to be a prevailing wage schedule used for construction procurement compliance.
PDF
PDF, High priority: read this first72 pages · specifications
HighAI Summary for Soil Study for Washington and Drake Road Water Main and Sanitary Sewer: Geotechnical soil study report (No. 20001445 0425 077) dated April 9, 2025, prepared by Bowser-Morner, Inc. for Fishbeck. The document details subgrade soil conditions, groundwater levels, and bearing capacities for the installation of 3,800 LF of water main and 7,600 LF of sanitary sewer in Piqua, Ohio. It includes field work results from 17 soil borings, laboratory plasticity and moisture testing, and provides technical recommendations for trench excavation, compaction, and foundation preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Virginia Transformer Corp - Liquid Filled Step Down Transformer Cutsheet: Technical specification sheet for a Virginia Transformer Corp liquid filled step down transformer (Serial: 47012MA285-DA523B). Document includes electrical ratings (12000/16000/20000 kVA), voltage levels (69kV HV / 13.8kV LV), cooling class (ONAN/ONAF/ONAF), and physical dimensions/lifting diameters.
PDF
PDF, Low priority1 page · certification
LowAI Summary for Americans with Disabilities Act Compliance Certification: A certification form requiring an authorized officer of a contracting firm to attest that the company is in compliance with the Americans with Disabilities Act (ADA) as of the bid submission date.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for City of Piqua Bid Bond: A standard bid guaranty bond form for the City of Piqua. The document outlines the obligations of the bidder (principal) and the surety to ensure the bidder enters into a contract if awarded, specifying penal sums and conditions for the bond's validity.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for City of Piqua Bid Bond: A standard Bid Guaranty Bond form for the City of Piqua. The document outlines the legal obligations of the bidder (principal) and the surety to ensure the project is contracted upon award, specifying penal sums and conditions for the bond's validity.
PDF
PDF, Low priority1 page · past-performance
LowAI Summary for City of Piqua, Ohio - Contractor's Qualification Statement: A standard form from the City of Piqua, Ohio, dated January 2022, requiring bidders to provide references and details of previous work to establish their responsibility, experience, skill, and financial standing.
PDF
PDF, Low priority1 page · compliance-form
LowAI Summary for Drug Free Workplace Compliance Affidavit Form: A legal affidavit form requiring contractors to certify enrollment and good standing with the Ohio Bureau of Workers' Compensation Drug-Free Workplace Program or a comparable approved program. It includes a requirement that subcontractors also maintain compliance.
CITY OF PIQUA OHIO - Electrical Construction - Piqua 69kV The Site Substation
ENGINEER’S ESTIMATE: $1,310,000 In general, the work consists of performing electrical construction for the Piqua 69kV The Site Substation Project for The City of Piqua. State of Ohio Prevailing Wages are required.