The City of Piqua, Ohio, is soliciting bids for project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted in duplicate using the provided forms, accompanied by a bid bond or certified check for 10 percent of the total bid amount.
The contract is governed by EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Award selection will be based on the lowest and best bid, considering price, relative merits, and subcontractor qualifications. Successful contractors must comply with State of Ohio Prevailing Wage laws, provide performance and payment bonds equal to the contract price, and certify compliance with the Americans with Disabilities Act and Drug Free Workplace programs. Technical requirements specify strict tolerances for pier center location, elevation, and verticality, with structures prohibited from erection until piers reach 75 percent of their design compressive strength. Payment is structured with 90 percent due upon delivery of equipment and the final 10 percent due upon system acceptance and energization.
General Info
City of Piqua bids for seven drilled pier foundations, estimated at $280,000.
PDF, High priority: read this first6 pages · amendment
HighAI Summary for Addendum No. 1 - Piqua The Site Substation & Transmission Line: Addendum No. 1 for Project No. 24-17.XX regarding the Piqua 69kV The Site Substation & Washington Road 69kv Transmission Line. The document provides clarifications to bidder questions across multiple packages, including Control Building and Relay Panels (24-17.9A), Major Equipment (24-17.9B), and Substation Electrical Construction (24-17.10). Key updates include bid deadline extensions to October 21st and 22nd, guidance on award structures, and technical clarifications regarding site preparation, equipment weights, and documentation references.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addendum No. 2 - Project 24-17.12 Drilled Pier Foundations Washington/Farrington Road T-Line: Issued October 6, 2026, by the City of Piqua, Ohio, this addendum provides a revision to the bidding documents for Project 24-17.12. The specific change updates the required Bid Bond percentage to no less than 10%.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Appendix A - Drilled Pier Pole Foundation: Technical drawing/specification for drilled pier pole foundations supporting the Piqua 69kV Site Substation for Piqua Powersystem. Marked as 'Preliminary for Bid' dated 7/07/2026, Project No. 25-0972.
PDF
PDF, High priority: read this first2 pages · bid-bond
HighAI Summary for Bid Guaranty Bond for City of Piqua Project: This Bid Guaranty Bond document serves as a surety agreement between the bidder (principal) and surety to the City of Piqua (owner) for a specified project. It guarantees the bidder's commitment to enter into a contract if awarded and to perform according to the bid, plans, and specifications. The bond penal sum equals the bid amount or a specified minimum, ensuring financial coverage if the bidder defaults. The surety's liability is limited to the penal sum. The bond also covers payment claims by subcontractors and material suppliers. The document includes signature blocks for the bidder, surety, and surety agent, and stipulates that modifications to the contract do not affect the surety's obligations. This bond is a critical part of the bidding process to protect the owner from bidder default.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for City of Piqua Project 24-17.12 - Drilled Pier Foundations - Washington/Farrington Road T-Line: Advertisement for Bids issued by the City of Piqua, Ohio, on September 6, 2026, for project #24-17.12. The project involves the construction of cast-in-place drilled pier foundations for transmission line structures. Bids are due by 1:00pm on October 19, 2026, and can be submitted via Bid Express, email, or hard copy.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for E-7.1 - Conduit Schedule: Technical conduit schedule detailing conduit numbers, cable numbers, routing (from/to), sizes, PVC fitting requirements, and approximate lengths for electrical infrastructure, including transformers and breaker bays.
PDF
PDF, High priority: read this first77 pages · contract-document
HighAI Summary for EJCDC C-700 Standard General Conditions of the Construction Contract (2018): This document is the 2018 EJCDC C-700 Standard General Conditions of the Construction Contract, prepared by the Engineers Joint Contract Documents Committee. It establishes the legal framework and standard terms for construction contracts, covering critical areas such as definitions, bonds and insurance, contractor and owner responsibilities, change orders, claims, and dispute resolution.
PDF
PDF, High priority: read this first15 pages · specifications
HighAI Summary for EJCDC C-800 Supplementary Conditions of the Construction Contract: This document contains the Supplementary Conditions for a construction contract, based on the 2018 EJCDC C-800 template (revised 01.2022). It serves to amend or supplement the EJCDC C-700 Standard General Conditions, specifically addressing insurance requirements, document delivery, commencement of work, and site conditions.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Loading Table - Pole 17: Technical load table for Pole 17, detailing vertical (V), transverse (T), and longitudinal (L) load cases in pounds (lbs) for various components including distribution, communication, static, and conductor phases.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Loading Table Pole 28: Technical load table for Pole 28, detailing structural load cases (1-5) with vertical (V), transverse (T), and longitudinal (L) forces in pounds. Includes specific loading data for static, conductor, communication, and distribution components per phase.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Loading Table Pole 63: Technical load table for Pole 63, detailing vertical, transverse, and longitudinal load cases (1-5) in pounds (LBS) for various components including communication, distribution, and conductor phases.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Load Table - Pole 1: Technical loading table for Pole 1, detailing load cases (1-5) with vertical (V), transverse (T), and longitudinal (L) forces in lbs for communication, distribution, static, and conductor phases.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Load Table - Pole 18: Load Table - Pole 18 showing static, conductor, distribution, and communication per-phase loading cases. Includes V, T, and L load values in pounds across multiple cases and items, likely for pole design/structural analysis.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Load Table - Pole 2: Technical load table for Pole 2, detailing vertical (V), transverse (T), and longitudinal (L) load cases in pounds (LBS) for various components including static, conductor, distribution, and communication lines.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Load Table - Pole 29: Technical loading table for Pole 29, detailing load cases (1-5) with corresponding vertical (V), transverse (T), and longitudinal (L) forces in pounds. The document specifies load requirements for static, conductor, distribution, and communication components per phase.
PDF
PDF, High priority: read this first4 pages · wage-determination
HighAI Summary for Payroll Submittals and Wage Determination Document: This document outlines the requirements for payroll submittals and prevailing wage determinations for public improvement projects as per Ohio Revised Code Sections 4115.03 to 4115.16. It details contractor obligations to submit certified payrolls, schedules of pay dates, and notifications to employees. The document includes penalties for violations and specifies the duties of contractors regarding wage rate postings, payroll reporting, and compliance affidavits. It serves as a guide for contractors to ensure adherence to prevailing wage laws and proper documentation throughout the contract period.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Piqua 69kV Site Substation - Civil Site Plan Details: Technical civil site plan details for the Piqua 69kV Site Substation on Washington Road, Piqua, Ohio. The document specifies swale dimensions, profiles, low-flow channel requirements (2-4 inch stone on geotextile), and culvert specifications (18 inch, 40 LF) for the proposed drive.
XLSX
XLSX, High priority: read this first2 pages · bid-tabulation
HighAI Summary for Piqua Bid Package 24-17.12: Washington Road 69kV Transmission Line Drilled Pier Foundations: A bid tabulation sheet for the City of Piqua, Ohio, regarding the Washington Road 69kV Transmission Line project (Bid Package 24-17.12). The document specifies unit pricing for drilled pier foundations for self-supporting steel poles, dated September 1, 2026.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Guide for Contractors - 2026: A comprehensive guide detailing the responsibilities of contractors regarding Ohio's prevailing wage laws (Chapter 4115 of the Ohio Revised Code) for the 2026 period. It outlines project cost thresholds for applicability, penalties for violations, requirements for apprentice ratios, payroll record-keeping, and specific instructions for submitting certified payroll reports.
PDF
PDF, High priority: read this first71 pages · wage-determination
HighAI Summary for Prevailing Wage Rate Schedule (LCN01-2026ib): Prevailing wage rate document listing skilled craft wage determinations and fringe benefit rates for multiple unions and classifications. Includes effective dates ranging from 2013 to 2026, change numbers (e.g., LCN01-2026ib, LCN02-2013fb), apprentice/journeyman ratios, jurisdictions, special jurisdictional notes, and detailed rate tables for asbestos workers, insulators, boilermakers, and bricklayers. This appears to be a prevailing wage schedule used for construction procurement compliance.
PDF
PDF, High priority: read this first72 pages · specifications
HighAI Summary for Soil Study for Washington and Drake Road Water Main and Sanitary Sewer: Geotechnical soil study report (No. 20001445 0425 077) dated April 9, 2025, prepared by Bowser-Morner, Inc. for Fishbeck. The document details subgrade soil conditions, groundwater levels, and bearing capacities for the installation of 3,800 LF of water main and 7,600 LF of sanitary sewer in Piqua, Ohio. It includes field work results from 17 soil borings, laboratory plasticity and moisture testing, and provides technical recommendations for trench excavation, compaction, and foundation preparation.
PDF
PDF, High priority: read this first49 pages · ifb
HighAI Summary for Washington/Farrington Road T-Line - Drilled Pier Foundations (Project No. 24-17.12): Invitation for Bids (IFB) issued by the City of Piqua, Ohio, for the construction of cast-in-place drilled pier foundations for the Washington/Farrington Road T-Line project. The document, prepared by Encompass Engineers and Architects in September 2026, includes the legal notice, bid submission requirements, proposal forms, and an engineer's estimate of $280,000. Bids are due by 1:00 PM on October 19th, 2026.
PDF
PDF, Low priority1 page · certification
LowAI Summary for Americans with Disabilities Act Compliance Certification: A certification form requiring an authorized officer of a contracting firm to attest that the company is in compliance with the Americans with Disabilities Act (ADA) as of the bid submission date.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for City of Piqua Bid Bond: A standard Bid Guaranty Bond form for the City of Piqua. The document outlines the legal obligations of the bidder (principal) and the surety to ensure the project is contracted upon award, specifying penal sums and conditions for the bond's validity.
PDF
PDF, Low priority1 page · past-performance
LowAI Summary for City of Piqua, Ohio - Contractor's Qualification Statement: A standard form from the City of Piqua, Ohio, dated January 2022, requiring bidders to provide references and details of previous work to establish their responsibility, experience, skill, and financial standing.
PDF
PDF, Low priority1 page · compliance-form
LowAI Summary for Drug Free Workplace Compliance Affidavit Form: A legal affidavit form requiring contractors to certify enrollment and good standing with the Ohio Bureau of Workers' Compensation Drug-Free Workplace Program or a comparable approved program. It includes a requirement that subcontractors also maintain compliance.
CITY OF PIQUA OHIO - Drilled Pier Foundations Washington/Farrington Road T-Line
ENGINEER’S ESTIMATE: $280,000 In general, the work consists of furnishing all labor, materials, and equipment to construct the cast-in-place drilled pier foundations for the transmission line structures for the Washington/Farrington Road T-Line Project - Drilled Pier Foundations for The City of Piqua. State of Ohio Prevailing Wages are required.