24-Inch Highway 49 273 Pleasant Valley Road Sewer Replacement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District is undertaking the 24-Inch Highway 49 273 Pleasant Valley Road Sewer Replacement Project in Diamond Springs, California. The project involves replacing approximately 20 feet of a 24-inch gravity sewer line located within a utility easement along Pleasant Valley Road and Highway 49 near Patterson Drive. This urgent replacement is necessary because a Pacific Gas and Electric power pole ground rod was inserted through the line and a power pole was installed directly above it, creating a risk of structural failure and sanitary sewer spills. The project is categorized as exempt under Class 2 of the California Code of Regulations as it does not increase sewer capacity or impact protected resources. The scope of work includes the excavation of subgrade soil, removal of the damaged segment, installation of a new gravity sewer line with an aggregate base, and restoration of the area to pre-construction grade. To maintain uninterrupted sewer service, a temporary bypass system using a trailer-mounted generator and pump will operate up to 24 hours a day. The estimated duration for the repair is one to two weeks. Required equipment includes excavators, loaders, backhoes, mini-excavators, and semi-trucks. All construction debris will be disposed of according to regulatory requirements, and erosion control best management practices will be implemented for all ground disturbances. Brian Deason serves as the primary point of contact for the project.

General Info

El Dorado Irrigation District will replace a damaged 24-inch sewer line in Diamond Springs.

Agency

California → El Dorado Irrigation District

Place of Performance

Commerce Way and Pleasant Valley Rd, Diamond Springs, CA, 95619

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A

Full Description

Show more
The El Dorado Irrigation District (District) proposes to replace a segment of 24-inch gravity sewer line, which was found to have a Pacific Gas and Electric (PG&E) power pole ground rod inserted through it. Further inspection also revealed that PG&E installed a power pole immediately over this deeply-buried line, causing additional damage adjacent to the area pierced by the ground rod. This section of pipeline is now vulnerable to structural failure, at risk of a sanitary sewer spill, and in need of immediate replacement. The pipeline segment is located within an existing utility easement along Pleasant Valley Road / Highway 49 near Patterson Drive in the community of Diamond Springs. The project will replace approximately 20 feet of damaged gravity sewer line. Work activities will include excavation of subgrade soil, removal of damaged sewer line segment, placement of aggregate base at the bottom of the trench, installation of new gravity sewer line, backfilling base above the pipe, and restoring to pre-construction grade. A temporary bypass will be installed in order to maintain sewer service during the sewer line replacement. Bypass pumping will be performed using a trailer mounted generator and pump and will be required up to 24 hours a day for the duration of the repair, which is expected to take approximately 1-2 weeks to complete. Equipment that will be used will include an excavator, loader, backhoe, mini-excavator, semi-trucks, and trailer mounted generator and bypass pumping equipment. Project activities will not impact public sewer services. Any construction debris that is generated as a result of the sewer line replacement will be removed from the area and will be disposed of in compliance with all applicable regulatory requirements. All areas where ground disturbance occurs will be stabilized using appropriate best management practices for erosion control.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS