This Solicitation opportunity from Pennsylvania was posted on February 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Montgomery Township is soliciting sealed bids for Contract 25-00913, the 2026 Curb and Curb Ramp Project. The scope of work includes the replacement of vertical and depressed concrete curbs at various locations, the field design and installation of curb ramps, and concrete testing along township roads. Work is scheduled to commence on or before May 1, 2026, with substantial completion required within 90 calendar days and final payment readiness within 120 calendar days. The project is managed by Montgomery Township and was developed by Gilmore and Associates, Inc.
Bids must be submitted via PennBid by March 3, 2026, at 10:30 AM. Requirements for bidders include a 10 percent bid bond, with the successful awardee providing performance and payment bonds each totaling 100 percent of the contract amount. The project must comply with the Pennsylvania Prevailing Wage Act and the Pennsylvania Public Works Employment Verification Act. Comprehensive project specifications cover quality control, traffic regulation per PennDOT standards, landscape protection, demolition, and detailed closeout procedures. Payment is based on a unit price method for the removal and replacement of curbs, ramps, and sidewalks.
General Info
Montgomery Township bids for 2026 curb and ramp replacement due March 3, 2026.
HighAI Summary for 2500913 BidTable BT-48KZ Summary: This document is a bid table for solicitation 2500913, identified as BT-48KZ. It contains detailed pricing information from multiple vendors for various construction-related line items such as removing and replacing concrete curbs, curb ramps, sidewalks, and concrete testing. The table highlights the lowest prices and selected items using color coding. Total costs for each vendor are summarized, with NJS Concrete offering the lowest total bid at $395,460. The document serves as a comparative pricing tool to evaluate bids for contract award decisions.
PDF
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for Advertisement for Bids - 2026 Concrete Submittals Section: This document is part of the Advertisement for Bids for the 2026 Concrete project, specifically Section 01 33 00 covering Submittals. It outlines submittal procedures including product data, shop drawings, samples, design data, test reports, and certificates. The section details requirements for construction progress schedules, submittal review timelines, and coordination with related contract sections. It provides instructions for submitting and revising submittals, scheduling, and distribution, ensuring compliance with contract documents and facilitating project progress and quality control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Construction Facilities and Temporary Controls Section: This document is Section 01 50 00 titled Construction Facilities and Temporary Controls, dated 2026-02-17. It outlines the contractor's responsibilities for temporary utilities, controls, and construction facilities during the project. Key content includes requirements for temporary electricity and sanitary facilities, barriers, water control, protection of installed work, security, progress cleaning, waste removal, project identification, removal of temporary utilities and controls, and dust control measures. The section references related sections for traffic regulation and contract closeout. No products or execution details are included in this section.
PDF
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for Contract 25-00913 - 2026 Curb & Curb Ramp Project Advertisement for Bids: This Advertisement for Bids dated February 2026 announces that Montgomery Township will receive sealed bids online via PennBid for Contract 25-00913 - 2026 Curb & Curb Ramp Project until March 3, 2026 at 10:30 AM. The project involves replacement of vertical/depressed concrete curb, curb ramp field design, and concrete testing at various township roads. Bids require a 10% Bid Bond, with successful bidders submitting 100% Performance and Payment Bonds. The project is subject to Pennsylvania Prevailing Wage Act and Public Works Employment Verification. Bids remain valid for 60 days post-opening. Montgomery Township reserves rights to reject bids or waive informalities. Work starts by May 1, 2026, with substantial completion in 90 days and final payment readiness in 120 days.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Contract Closeout Procedures Section 01 70 00: This document is Section 01 70 00 titled Contract Closeout, detailing procedures for project closeout including final cleaning, adjusting, project record documents, operation and maintenance manuals, spare parts, and other documentation. It outlines submission requirements for certification of work completion, final inspections, punch list completion, and final payment applications. The section specifies final cleaning tasks, equipment adjustments, maintenance of record documents, and other documentation such as payroll certifications, compliance certificates, waivers of liens, maintenance bonds, and change order submissions. The document is essential for ensuring proper project closeout and final acceptance of work.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Contract Considerations Section 01 29 00: This document is Section 01 29 00 titled Contract Considerations, detailing contract administration procedures for a construction project. It includes instructions on the schedule of values, applications for payment, change procedures, and alternates. The document references related sections and EJCDC forms for payment applications and change orders. It outlines submission requirements, formats, and timelines for payment applications and change requests, including stipulated price, unit price, work change directives, and time and material change orders. The section emphasizes maintaining detailed records and proper documentation for changes and payments. The document is a critical part of the contract's general conditions and administrative requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Coordination and Meetings Section 01 31 00: This document is Section 01 31 00 titled Coordination and Meetings from a project manual. It outlines the coordination requirements and project conditions, field engineering responsibilities, and procedures for preconstruction and progress meetings. Key content includes scheduling coordination, stakeout and field engineering tasks, meeting agendas, required attendees, and documentation of meeting minutes. The document is intended to ensure efficient sequencing of construction activities and communication among project participants.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Demolition Section 02 41 16 Agreement: This document is Section 02 41 16 titled 'Demolition' from an agreement, detailing the scope of demolition work including removal of damaged concrete curbs, sidewalks, and other features. It outlines general requirements such as minimizing interference, maintaining access, and controlling dust. The document specifies execution steps including protection of utilities and existing structures, orderly demolition, and site cleanup. No products are specified in this section. The document is part of a construction agreement and provides critical technical specifications for demolition work.
PDF
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for Instructions to Bidders - EBID 2025: This document titled 'Instructions to Bidders' (Document 00 21 13) provides comprehensive guidance for bidders participating in the EBID 2025 procurement. It includes defined terms, procedures for obtaining bidding documents, bidder qualifications, examination of bidding documents and site conditions, and instructions on bid preparation and submission. The document outlines responsibilities related to subsurface conditions, hazardous environmental conditions, and coordination with other work at the site. It serves as a critical resource for bidders to understand the bidding process, requirements, and evaluation criteria for the contract award.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Instructions to Bidders - Quality Control Section 01 40 00: This document is Section 01 40 00 Quality Control from the Instructions to Bidders for the 2025 project. It outlines quality assurance and control measures for installation, including tolerances, references and standards, mock-ups, testing laboratory services, observation services, and manufacturers' field services. It specifies requirements for monitoring quality control over suppliers, workmanship, and site conditions, compliance with manufacturers' instructions and standards, and procedures for testing and observation. The section also covers examination and preparation of substrates before work application. This document is critical for ensuring the work meets specified quality standards and contract requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Measurement and Payment Section 01 22 00: This document is Section 01 22 00 titled 'Measurement and Payment' from a project manual, detailing criteria for measurement and payment under a unit price payment method. It includes procedures for measurement by the Resident Project Representative, responsibilities of the contractor, and specific payment terms for removal and replacement of vertical/depressed concrete curb, concrete curb ramps, and plain cement concrete sidewalk. The document references compliance with PennDOT standards and specifies materials, construction methods, and restoration requirements. It serves as a technical specification guiding payment and measurement for concrete work in the project.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for Project Manual for Contract No. 25-00913 2026 Curb & Curb Ramp Project: This document is the Project Manual for Contract No. 25-00913 titled '2026 Curb & Curb Ramp Project' prepared for Montgomery Township, located at 1001 Stump Road, Montgomeryville, PA. The manual was prepared in February 2026 by Gilmore & Associates, Inc., a firm specializing in engineering, land surveying, planning, and GIS consulting. The document serves as a comprehensive guide for the project, likely containing specifications, plans, and other essential contract information.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 Traffic Regulation - Contractor Traffic Control Requirements: This document is Section 01 55 26 titled Traffic Regulation, outlining the contractor's obligations for maintaining safe and efficient traffic movement near construction sites. It includes requirements for traffic control plans, notification procedures, construction parking controls, flag persons, haul routes, traffic signs and signals, and other related requirements. The section references Pennsylvania Department of Transportation standards and specifies execution details such as advance notifications, flagger training, and work time restrictions. The document ensures compliance with PennDOT guidelines and local authority approvals to manage traffic safely during construction activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 56 39 Landscape Protection: This document is Section 01 56 39 titled Landscape Protection, detailing provisions for protecting landscape elements during construction. It includes requirements for temporary fencing, quality assurance referencing Pennsylvania Dept. of Transportation standards, and job conditions for contractor site assessment. The document specifies materials for fencing, execution steps such as site preparation, general protection requirements, erection of fencing, pruning standards per National Arborist Association, and fertilization guidelines for disturbed trees. The purpose is to ensure survival of plant materials through protective measures during and after construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 Material and Equipment: This document is Section 01 60 00 titled 'Material and Equipment' and outlines the requirements for products, transportation, handling, storage, protection, product options, and substitutions related to the work. It includes instructions on the use of materials, handling and storage procedures, and conditions for product substitutions during the bidding period. The document specifies that substitutions must be documented and approved, with detailed procedures for submission and evaluation. It also references related sections such as Instructions to Bidders and Quality Control. Parts 2 and 3 of the section are not used.
PDF
PDF, Low prioritylist-of-drawing-sheets
LowAI Summary for 2026 Curb & Curb Ramp Project List of Drawing Sheets: This document titled 'List of Drawing Sheets' pertains to the 2026 Curb & Curb Ramp Project. It includes two drawing sheets: Sheet 1 of 2 is a Location Map, and Sheet 2 of 2 contains Construction Details. The document serves as an index to the drawings associated with the project.
PDF
PDF, Low prioritytable-of-contents
LowAI Summary for Montgomery Township 2026 Curb & Curb Ramp Project - Table of Contents: This document is the Table of Contents for the Montgomery Township 2026 Curb & Curb Ramp Project, Contract 25-00913. It outlines the structure of the procurement and contracting requirements, general requirements, and specifications groups. Key sections include procurement requirements such as Advertisement for Bids, Instructions to Bidders, Bid Form, and Bid Bond; contracting requirements including Agreement, Performance and Payment Bonds, General and Supplementary Conditions; general requirements like Summary of Work, Quality Control, and Contract Closeout; and detailed specifications covering Demolition, Concrete Formwork, Paving, ADA Detectable Warning Tiles, and Landscaping. Appendices include Prevailing Minimum Wage Determination and Public Works Employment Verification Form.
PDF
PDF, Low priorityspecifications
LowAI Summary for Section 01 42 13 Organization and Reference Acronyms: This document section 01 42 13 provides a listing of acronyms and associated organizations and references cited in the Project Manual. It includes acronyms for various standards organizations, industry groups, and codes relevant to construction and engineering projects, such as AASHTO, ACI, ANSI, ASTM, NFPA, OSHA, and others. The document serves as a reference for understanding terminology used throughout the project documentation.
Ref. #: Montgomery Township, Montgomery County ADVERTISEMENT FOR BIDS Montgomery Township will receive sealed bids online for Contract 25-00913 – 2026 Curb & Curb Ramp Project. Sealed bids may be submitted and updated online via PennBid (www.pennbid.net) until March 3, 2026 at 10:30 AM at which time the bids shall be publicly opened and read aloud at 1001 Stump Road, Montgomeryville, PA 18936. The Work to be completed under this contract consists of all labor, equipment, and materials to perform the replacement of vertical/depressed concrete curb at various locations, a curb ramp, and concrete testing along various roads within the Township. Designs for the curb ramp will not be provided. Curb ramps are to be field designed by the Contractor during construction. Work shall commence on or before May 1, 2026, and be substantially completed within 90 calendar days and ready for final payment 120 calendar days after the Contract Times commence. All documents and solicitation details are available online at no cost on PennBid. A nominal fee of 0.33% of the bid amount (minimum $150 and maximum $6,000) is assessed by PennBid only to bidders who are awarded contracts. A Bid Bond in the amount of 10% of the maximum amount bid is required to be submitted with each bid. The successful bidder will be required to submit within the time limit specified in the Contract Documents, the Performance Bond and Payment Bond each in an amount of 100% of the contract amount. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended, the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry, and to applicable provisions of Act 127 Pennsylvania Public Works Employment Verification as amended. All bids shall remain subject to acceptance for sixty (60) days after the Bid Opening or for such period of time that Bidder may agree to in writing upon request. Bids may be withdrawn within two (2) business days after the opening of bids only by the withdrawing Bidder’s strict compliance with 73 P.S. Section 1602 and any subsequent amendments. Montgomery Township reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids. The project will be managed by Montgomery Township. By order of:
Owner: Montgomery Township
Dated: February 2026
More opportunities from Pennsylvania → Montgomery County
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.