Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on July 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-006 Western Ave. Pedestrian Lights Installation Only

Closed
184138State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency (IEUA) is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing comprehensive oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for agency staff on inspection tools, and develop standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award based on a fixed-pricing, not-to-exceed contract structure. Evaluation criteria focus on the offeror's past performance, requiring at least two similar projects completed within the last five years, one of which must be for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed staffing plan, methodology, and required certifications such as a Non-Collusion Statement and Workers' Compensation Certificate. The contract emphasizes labor compliance with the Department of Industrial Relations and requires contractors to demonstrate a commitment to cybersecurity goals. Payment will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, repair, and certification of emergency lighting systems to ensure full compliance with NFPA 101 (2024 Edition), NFPA 70 (National Electrical Code), and OSHA safety regulations. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. The award will be based on overall best value. Bidders must submit a signed lump sum bid form accompanied by a detailed cost breakout on company letterhead and a bid guarantee of 20% for bids equal to or exceeding $25,000. Awarded contractors with bids of $25,000 or more must provide performance and payment bonds from a surety company with at least an A- rating within five business days of the intent to award. The contractor is required to apply durable, uniquely numbered labels to all tested fixtures for future tracking. Compliance requirements include adherence to the Davis-Bacon Act and Construction Wage Rate Requirements for Canyon and Gem Counties, Idaho, as well as FAR 52.222-4 regarding overtime compensation. Contractors must provide one hour of paid sick leave for every 30 hours worked per EO 13706. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. First-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the installation of new pedestrian lighting infrastructure along Western Avenue, requiring the removal of existing light poles, mounted receptacles, wiring, and modifications to the current electrical service cabinet. The scope includes installing new pedestrian poles with appropriately sized wiring, splices, and terminations to ensure a complete and functional lighting system. Additionally, the project entails removing receptacles from trees and at-grade locations, assigning pole numbers, and installing GFCI receptacles on the new pedestrian poles to meet safety standards. The City of Avondale in Arizona is seeking a qualified licensed general contractor to perform all aspects of the work, which must be bid comprehensively, including plans, specifications, construction drawings, and reference documents, to ensure responsiveness. The project is valued between $500,000 and $1,500,000, with a response deadline set for August 21, 2025. The primary point of contact is Laura Robinson, reachable via email or phone. The solicitation emphasizes adherence to detailed technical specifications and comprehensive bid submission to qualify for contract award. The work is part of a broader effort to enhance pedestrian safety and infrastructure, aligning with city standards and specifications. The contract also references related technical documents, including specifications for sewer and pipeline rehabilitation, which provide additional context for project scope, measurement, and payment procedures, ensuring contractors understand all requirements for successful project completion.

Documents

8

26-006 Western Ave. Pedestrian Lights Installation Only

PDF, High priority: read this firstifb
High

Avondale Western Avenue Pedestrian Street Lights - Final Plans

PDF, High priority: read this firstspecifications
High

City of Avondale - Western Avenue Pedestrian Street Lights Technical Specifications

PDF, High priority: read this firstspecifications
High

EN 25-006 Western Ave Pedestrian Lights Pricing Sheet

XLSX, High priority: read this firstbid-schedule
High

IFB Substitution/Equal Request Form

PDF, High priority: read this first2 pages · substitution-form
High

Payment Bond for City of Avondale Contract

PDF, Low priority1 page · payment-bond
Low

Performance Bond for City of Avondale Contract

PDF, Low priority1 page · performance-bond
Low

Wage_Determination_-_Davis-Bacon.txt

TXT

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Avondale
Contacts1 person available
OfficeN/A
Organization / AgencyArizona → City of Avondale
Office AddressN/A

Full Description

Show more
The Work included in this Project consists of removal of the existing pedestrian light poles, mounted receptacles, wiring, and modifications to the existing electrical service cabinet; installation of new pedestrian poles, wiring (conductors, sized per plans, including splices and terminations for a complete system), removal of receptacles on trees and at grade, pole numbering, GFCI receptacles on the pedestrian light poles. Please refer to drawing construction notes too . The City is issuing this IFB to secure a qualified General Licensed Contractor to perform the Work and provide Materials as more particularly described in the Specifications attached to this IFB, and incorporated herein by reference. Bidders must submit Bids encompassing the entire Project, inclusive of the related Plans, Specifications, related construction drawings and Reference Documents. Failure to do so may result in a determination that the Bid is non-responsive.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS