26-046 Hollice T. Williams Stormwater Park
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Pensacola is soliciting bids for the construction of the Hollice T. Williams Stormwater Park, a 47-acre project involving comprehensive site development that includes demolition, grading, erosion and sediment control, and the installation of new infrastructure as outlined in the IFC design drawings. Key improvements encompass a full stormwater management system featuring new inlets, culverts, conveyance channels, detention facilities, and underground StormCapture units, along with a dedicated pump station at Long Hollow Pond equipped with electrical, mechanical, and conveyance systems. The project also integrates multipurpose recreational areas designed to function as stormwater retention zones, including park pavement, site planting and soils, irrigation, lighting, signage, furnishings such as benches and bike racks, and other miscellaneous site elements. All work must comply with the contract documents and City of Pensacola standards. The contractor is responsible for coordinating with third-party utility owners to resolve conflicts and manage relocations, as well as working closely with FDOT on any modifications to existing manhole structures tied to state infrastructure, with prior notice required for FDOT field observation. Coordination with CSX is mandatory for any activities near or within railroad rights-of-way, ensuring full compliance with CSX’s requirements. The project is governed by strict adherence to municipal and contractual specifications, and all construction must be executed in alignment with these guidelines. Submissions are due by August 10, 2026, with the solicitation open to qualified contractors through the City of Pensacola’s procurement portal, and primary contact information is provided for inquiries regarding this public infrastructure initiative.
General Info
Agency
NAICS
Place of Performance
222 W. Main St., Pensacola, FL, 32502, USASet-Aside
Documents
(22)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Proposed improvements include construction of comprehensive stormwater management system improvements which includes, but is not limited to: (a) installation of new stormwater infrastructure (i.e. inlets, culverts, conveyance channels, detention facilities, etc.), (b) construction of a new underground detention (i.e., StormCapture units), (c) construction of a pump station at Long Hollow Pond with installation of associated electrical, mechanical, and conveyance infrastructure, (d) construction of multipurpose recreational areas that also serve as stormwater management facilities (e) construction of park pavement and surfacing, (f) installation of site planting and planting soils, (g) construction of irrigation infrastructure, (h) installation of site lighting and electrical, (i) installation of signage and wayfinding, (j) installation of site furnishings (benches, bollards, water fountains, bike racks, trash receptacles), and (k) installation of other miscellaneous site features.
Contractor’s work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work.
Contractor’s work shall include coordination with FDOT on works directly related to FDOT infrastructure (manhole structure modifications). FDOT has indicated to be notified of construction activities involving FDOT infrastructure so that they may have a representative onsite.
Contractor’s work shall include coordination with CSX on field or construction activities within or adjacent to the railroad tracks and right-of-way. The Contractor shall coordination with CSX to understand all requirements related to work in and around CSX infrastructure.
All work shall be in accordance with the standards and specifications of the Contract Documents and the City of Pensacola.