This Solicitation opportunity from City of Sidney was posted on April 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
26-09 RWPS Generator & Electrical Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the installation of a new standby power system at the RWPS site, featuring a natural gas generator, an automatic transfer switch, and necessary electrical modifications to accommodate the new equipment including a variable frequency drive and a vertical turbine pump motor replacement. The scope also includes modifications to piping and the construction of a raised concrete pad for the generator, all detailed in the provided technical specifications and drawings. Additionally, there is an alternate option to abandon or remove an existing underground storage tank system along with its associated piping and conduit. A non-mandatory pre-bid meeting is scheduled for May 4, 2026, at the Water Treatment Plant in Sidney, Ohio. The contract is estimated at $1,130,000 and is subject to State of Ohio prevailing wage rates for building construction. Proposals must be submitted by May 21, 2026. The project is being managed by the City of Sidney and aims to enhance electrical reliability and infrastructure through these improvements.
General Info
Agency
Place of Performance
USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The project consists of the installation of new standby power system which includes a natural gas-fueled generator and new automatic transfer switch (ATS), electrical system modifications for ATS and new variable frequency drive, vertical turbine pump, motor replacement, piping modification and construction of elevated concrete generator pad as indicated in the Drawings and Technical Specifications.
An alternate is included to possibly abandon/remove existing underground storage tank (UST) system and associated piping/conduit as indicated in the Drawings and Technical Specifications.
A NON-MANDATORY pre-bid meeting is scheduled for Monday, May 4, 2026 at 10:00 am located at the WTP, 880 E. Court Street, Sidney, Ohio.
State of Ohio Prevailing Wage Rates for Building Construction apply.
Estimate: $1,130,000
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
