The South Jersey Port Corporation is soliciting proposals for project SJPC-26-169 to install new electric vehicle charging infrastructure at the Balzano Marine Terminal in Camden, New Jersey. The primary objective is to establish charging capabilities for two Taylor ZLC-995 top loader trucks and five Ford Lightning work trucks. The technical scope includes the installation of one 1MVA transformer, one 112.5kVA transformer, a 1200A main disconnect, 480V and 208V panels, two 200kW DC fast chargers, and five 11.5kW chargers. Additional requirements include the installation of underground conduits, ground rings, precast transformer pads, and the restoration of blacktop surfaces. All 200kW charging stations must be Build America, Buy America compliant, and the project must adhere to NEC 2020 Article 110 and NFPA 70E safety standards. The contract will be awarded to the lowest responsible bidder. Submission requirements include a bid security of 10 percent of the total bid price, capped at 20,000 dollars, along with various certifications including business registration, non-collusion affidavits, and prevailing wage compliance declarations. Awardees must provide performance and payment bonds and comply with New Jersey Executive Order 151 regarding equal employment opportunity and affirmative action. Furthermore, the project incorporates a small business set-aside goal of 25 percent. Contractors are required to maintain redline drawings and ensure all personnel accessing the marine terminal operations area possess the necessary security clearances. Packaging for materials must utilize recycled cardboard and avoid single-use plastics.
General Info
Agency
Place of Performance
USASet-Aside
Documents
10AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Utility Electrical & Instrumentation InstallationOpen now, due in 31 days
- FRSMP277009/JLM-Lighting Phase 2Open now, due in 16 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Balzano Lift Truck project’s goal is to provide facilities to charge 2 new Taylor ZLC-995 top loader trucks, and the capability to charge 5 Ford Lightning work trucks. This will be accomplished by installing one (1) new 1MVA transformer (13.2:0.480kV), one (1) 1200A Main Disconnect, one (1) 480V panel, two (2) 200kW chargers, one (1) 112.5kVA (480:208V) transformer, one (1) 208V panel, and five (5) 11.5kW chargers.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS