26-19 Sac883604A (Sac)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Nutrient Reduction Wetland Project, managed by the Iowa Department of Agriculture and Land Stewardship, involves the construction of a wetland designed to treat water from an existing ditch using a solar-powered pump. Located in Sac County, Iowa, the scope of work includes selective clearing, excavation, grading, the installation of tile and outlet structures, a lift station with solar panels, riprap placement, and seeding. Key technical requirements include approximately 7,800 cubic yards of earthwork, 726 linear feet of pipe installation, 67 tons of rock, 140 tons of trench stabilization material, and 4.9 acres of seeding. The estimated construction cost for the project ranges between $175,000 and $275,000. Construction must be completed by November 1, 2027, with seeding completed by December 15, 2027. The contract will be awarded to the lowest responsible bidder based on bid price and bidder qualifications. Bidders must submit unit price bids via the IMPACS portal by December 30, 2026, and provide a bid bond of ten percent. The successful contractor must furnish a performance and payment bond for one hundred percent of the contract price and be registered with the Iowa Department of Inspections, Appeals and Licensing. Payment for approved work is processed via progress pay requests and is due within thirty days of receipt.
General Info
NAICS
Place of Performance
Set-Aside
Documents
11Read all 11 documents
Due in 39 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 11 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, lift station with solar-powered pump, tile installation, riprap placement, and seeding. This project includes around 7,800 total cubic yards of earthwork, 726 linear feet of pipe installation, 67 tons of rock, 140 tons of trench stabilization material, installation of a Modified SW-401 concrete outlet structure, two-chamber water control structure, lift station with pump assembly and solar panels, 738 LF of straw wattle and 4.9 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.
More opportunities from Iowa → Agriculture and Land Stewardship
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
