26-28 Gleason Street to Kuther Road Sanitary Sewer Replacement CM26AD
Open
50185State & Local
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The City of Sidney, Ohio, is soliciting bids for the 26-28 Gleason Street to Kuther Road Sanitary Sewer Replacement project (CM26AD). The scope of work involves replacing approximately 4,200 feet of existing 8-inch sanitary sewer with 12-inch sanitary sewer, including the implementation of sanitary sewer bypass systems designed for HS-20 loading. The engineer's estimate for the project is $1,714,915. All work must comply with the 2010 ADA Standards for Accessibility, Ohio Revised Code §153.011 regarding domestic steel use, and various City of Sidney and ODOT standard construction drawings and specifications.
Bids must be submitted electronically via Bid Express by December 10, 2026, at 11:30 a.m. EST. The contract will be awarded to the lowest and best bidder who can demonstrate the necessary financial resources, facilities, and ability to perform the work. Requirements include the submission of a bid bond, non-collusion affidavit, and a municipal income tax questionnaire. The successful contractor must adhere to State of Ohio prevailing wage rates for heavy highway construction and comply with Ohio Administrative Code Chapter 123 regarding equal employment opportunity.
Contractors are required to provide insurance that names the City of Sidney and its officials as additional insureds using specific ISO forms, with the contractor's coverage serving as primary. Performance bonds are required upon contract execution. Payments are based on work completed as determined by the Public Works Director. The contractor is responsible for the safety of all methods used and must submit certified payroll records within three weeks of each pay date. There is no specified set-aside status for this solicitation.
General Info
Sidney, Ohio seeks bids for a sanitary sewer replacement project by December 2026.
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for Affidavit of Contractor Compliance - Prevailing Wages: A legal affidavit template used to certify that a contractor or subcontractor has complied with the prevailing wage requirements of Chapter 4115 of the Ohio Revised Code. This document must be executed by a company officer and submitted to the public authority before the release of surety or final payment.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Appendix A - State EEO Minority Manpower Utilization Goals: This document outlines the Minority Manpower Utilization Goals and Timetables for State EEO bid conditions. It specifies required percentages of work hours for various trades across Ohio's Standard Metropolitan Statistical Areas (SMSA), including Akron, Cincinnati, Cleveland, Columbus, Dayton, Toledo, and Youngstown-Warren.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix C - State EEO Bid Conditions (Female Utilization Goals): This document outlines the female utilization goals and requirements for state-involved contractors under OAC 123:2-3-05 and Executive Order 84-9. It specifies a minimum female utilization rate of 6.9 percent, consistent with federal standards, to be calculated via work hours.
PDF
PDF, High priority: read this first3 pages · ifb
HighAI Summary for City of Sidney - Instructions to Bidders: Instructions to Bidders for the City of Sidney, Ohio. The document outlines electronic submission requirements via Bid Express, bid security (10% bond or certified check), non-collusion policies, and performance bond requirements (100%). It includes critical mandates regarding prevailing wage rates per Ohio Revised Code Chapter 4115, liquidated damages for delays, and the requirement for certified payroll submissions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Sidney, Ohio - General Provisions: This document outlines the General Provisions for a construction project for the City of Sidney, Ohio. It defines key roles (Owner, Public Works Director, Contractor, Inspector), establishes the scope of work, and details the authority of the Public Works Director regarding quality control and project management. It also specifies that the State of Ohio Dept. of Transportation Construction and Material Specifications shall govern the project.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City of Sidney - Sanitary Sewer Replacement (26-28 Gleason Street to Kuther Road): Legal notice for an Invitation for Bid (IFB) issued by the City of Sidney for the replacement of approximately 4,200 feet of 8-inch sanitary sewer with 12-inch sewer (OPWC #CM26AD). Bids are due electronically via Bid Express by December 10, 2026. The project requires compliance with Ohio Revised Code domestic steel requirements, prevailing wage rates for Shelby County, and specific bonding requirements. Completion is expected by September 30, 2027.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Contract Security & Insurance Requirements: This document outlines the mandatory security and insurance requirements for contractors working with the City of Sidney. It specifies the need for a surety bond equal to 100% of the contract price and details minimum coverage limits for Commercial General Liability ($5M), Automobile Liability ($1M), Workers' Compensation, Builder's Risk, Professional Liability, and Pollution Legal Liability. It also defines requirements for naming the City as an additional insured and the necessary endorsements for primary coverage and claims-made policies.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for General Specifications - Gleason Street to Kuther Road Sanitary Sewer Replacement: General specifications for the City of Sidney sanitary sewer replacement project (OPWC# CM26AD) from Gleason Street to Kuther Road. The document mandates adherence to City of Sidney Standard Drawings and the State of Ohio (ODOT) Construction and Material Specifications Manual, providing specific references to curb details, manhole types, trench details, and ODOT supplemental specifications.
PDF
PDF, High priority: read this first26 pages · specifications
HighAI Summary for Gleason St. to Kuther Rd. Sanitary Sewer Replacement Plans: Engineering plans and general specifications for the City of Sidney and Clinton Township sanitary sewer replacement project, released for bidding on November 19, 2026. The document includes a vicinity map, sanitary sewer bypass exhibit, and detailed general notes regarding construction standards, utility coordination, and record drawing requirements.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Instructions for Preparing Certified Payroll Reports: This document provides detailed instructions for contractors and subcontractors on how to prepare and submit certified payroll reports in compliance with Ohio's Prevailing Wage Law (Ohio Revised Code Chapter 4115). It outlines requirements for the payroll heading, employee information, work classifications, hours worked, base rates, and the reporting of fringe benefits.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Threshold Levels 2026: This document provides the prevailing wage threshold levels for public improvements in Ohio effective January 1, 2026. It specifies the cost thresholds for 'new' and 'reconstruction' projects for both building construction and road/bridge construction to determine when prevailing wage rates must be applied.
PDF
PDF, High priority: read this first3 pages · wage-determination
HighAI Summary for Prevailing Wage Contractor Responsibilities: A summary of contractor responsibilities regarding Ohio's prevailing wage laws under Chapter 4115 of the Ohio Revised Code. It outlines project cost thresholds for applicability, penalties for violations, and specific requirements for wage payments, apprentice ratios, payroll record-keeping, and the submission of certified payrolls to the Bureau of Wage and Hour Administration.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for Prevailing Wage Payroll Dates Form: A compliance form for contractors and subcontractors to report payroll dates and payment schedules in accordance with Ohio Revised Code 4115.071(C) for projects managed by the City of Sidney.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for PW Notification to Employee: A template for a Prevailing Wage Notification to Employee for projects managed by the City of Sidney, OH. The document outlines the required fields for project identification, contractor contact information, and a table for specifying labor classifications, base rates, and fringe benefits.
PDF
PDF, Low priorityspecifications
LowAI Summary for Appendix B - State EEO Bid Conditions: This document outlines the specific affirmative action steps and Equal Employment Opportunity (EEO) requirements for contractors. It details the necessary procedures for increasing minority and female utilization, methods to demonstrate compliance, and the basic components of an acceptable Affirmative Action Program.
PDF
PDF, Low priority2 pages · bond
LowAI Summary for Bid Guaranty & Contract Bond: A legal template for a Bid Guaranty and Contract Bond pursuant to Section 153.571 of the Ohio Revised Code, intended for use by the City of Sidney. It establishes the obligations of the Principal and Surety to ensure the bidder enters into a contract and performs the work as specified.
PDF
PDF, Low priority1 page · other
LowAI Summary for Disclosure of Personal Property Taxes Affidavit: Affidavit for City of Sidney, Ohio competitive bids and municipal contracts under Ohio Revised Code Section 5719.042. The signer swears whether the bidder/contracting party has delinquent personal property taxes in relevant Ohio counties, and if so, states the amount due. The form notes that the statement must be incorporated into the contract and may be transmitted to the county treasurer if delinquent taxes exist. It includes notary acknowledgment and signature blocks.
PDF
PDF, Low priority1 page · other
LowAI Summary for Non-Collusion Affidavit: Non-collusion affidavit for a bidder to certify that a bid is genuine, independently prepared, and not submitted through collusion, sham bidding, or agreement with other bidders. Includes signature, title, notary acknowledgment, seal, and commission expiration lines. No solicitation, contract, or pricing schedule is included.
PDF
PDF, Low priority1 page · certified-payroll
LowAI Summary for PW Certified Payroll Report - City of Sidney: A blank Certified Payroll Report template for projects under the City of Sidney. The document includes fields for employer information, employee work classes, hours worked, base rates, and fringe benefits, along with a certification statement regarding compliance with prevailing wage rates and the Ohio Revised Code Chapter 4115.
PDF
PDF, Low priority1 page · fringe-benefits-form
LowAI Summary for PW Fringe Benefits Form: This document is a Fringe Benefits form related to prevailing wage requirements. It requests contractors and subcontractors to complete and return the form to the Prevailing Wage Coordinator before project commencement. The form collects information about the project name, contractor details, and how fringe benefits are paid—either in cash, to benefit programs, or both. It also asks for details on health & welfare, pension, miscellaneous plans, and apprenticeship programs, including addresses. The form is intended for use by the City of Sidney, Ohio, with contact information for the Prevailing Wage Coordinator provided.
26-28 Gleason Street to Kuther Road Sanitary Sewer Replacement CM26AD The project consists of the replacement of approximately 4200' of existing 8" sanitary sewer with 12" sanitary sewer. State of Ohio Prevailing Wage Rates for Heavy Highway Construction apply. Engineer's Estimate: $1,714,915
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.