Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

28--SEAL,METALLIC,AIRCR

Closed
N0038325QS086Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336412
New
Federal
Fd203062700424 (2995-01-290-1428J)
Solicitation # FD20302700424
The 421st Supply Chain Management Squadron at Tinker Air Force Base is conducting market research via a Sources Sought Synopsis to identify potential manufacturing sources for a Valve Assembly for the F-118 engine, identified by NSN 2995-01-290-1428JU. This effort is intended to determine if the requirement can be competitive or a Small Business Set-Aside under NAICS code 336412. The government is seeking interested parties capable of providing all labor, materials, facilities, and equipment necessary for the manufacture, testing, preservation, packaging, and delivery of completely serviceable units, including the management of supply chains, long-lead parts procurement, and obsolescence issues. To be considered, potential sources must submit a Source Approval Request (SAR) package and a Company Profile to the Oklahoma City Small Business Office. Qualification requires that the company has manufactured the subject or a similar item within the past 36 months for the Department of Defense or the Original Equipment Manufacturer. Essential requirements include a valid Quality Assurance Certificate such as ISO 9001, AS9100, or NATO AQAP-2070, and the ability to provide detailed Process Operation Sheets and Inspection Method Sheets. Interested businesses of all sizes and socioeconomic categories are encouraged to respond with their company details, CAGE code, and documentation of their capabilities. This notice is for planning purposes only; no solicitation is currently available, and no funds have been allocated at this time.
Ok DLA Aviation At Oklahoma City

POSTED

about 11 hours ago

DEADLINE

in 10 days
NAICS: 336412
New
Federal
Igniter, Spark Gas T (3D)
Solicitation # SPRTA127R0103
Solicitation SPRTA127R0103 is a request for proposal issued by the Defense Logistics Agency Weapons Support for the procurement of 159 Gas Turbine Spark Igniters (NSN 2925015034385RV, Part Number 9045600-1) for TF33 engines. These steel components are designated as Critical Safety Items and are used to provide high voltage, high energy pulses to ignite fuel in the combustion section of the engine. The government is seeking firm unit prices for a quantity range between 40 and 239 units, with delivery expected to begin as early as July 31, 2028, at a rate of 10 units per month. The procurement is intended as a limited source action under FAR 6.302, identifying Unison Industries, LLC as a qualified source. The contract mandates strict adherence to quality and safety standards, requiring ISO 9001:2000 certification and Higher Level Contract Quality Requirements. Deliverables must comply with MIL-STD-2073-1 for packaging, MIL-STD-129 for marking, and MIL-STD-130 for Item Unique Identification (IUID). Additionally, all wood packaging materials must be heat-treated and certified per ISPM 15 and ALSC standards. Inspection and acceptance will occur at the point of origin, with shipping terms set as FOB Origin. Proposals are due by November 20, 2026, and will be evaluated based on a combination of price and past performance.
Ok DLA Aviation At Oklahoma City

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 336412
New
DIBBS
COVER ASSEMBLY, METE
Solicitation # SPE4A7-27-T-1569
Solicitation SPE4A7-27-T-1569 is a fixed-price procurement issued by the Defense Logistics Agency for five units of Cover Assembly, Mete, identified by NSN 2915011735343. This procurement is designated as an Air Force Critical Safety Item and requires production in accordance with TDP Rev A Gen 8 and reference drawing NR 13873 EI-011735343. The delivery timeline for the primary items is 263 days, with an FOB Origin designation for both inspection and acceptance. A critical requirement of this contract is the First Article Test, which requires the delivery of three units to Tinker Air Force Base within 30 calendar days of the contract date for government testing. The contractor must maintain a quality management system compliant with SAE AS9100 and adhere to strict sampling methods, including zero-based sampling plans. Packaging must comply with ASTM D3951 and MIL-STD-129, and all payment requests must be processed through Wide Area WorkFlow. Offerors must comply with domestic material restrictions, including the Buy American Act and the Berry Amendment, and are prohibited from using additive manufacturing processes unless specifically authorized. The solicitation also mandates compliance with CMMC Level 2 self-assessment and DFARS cybersecurity reporting requirements. Small business joint ventures must provide specific socioeconomic representations, and all offerors must certify they will not provide covered telecommunications equipment or services.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 336412
New
DIBBS
ADAPTER, INPUT, CONTR
Solicitation # SPE4A7-27-R-X044
Solicitation SPE4A7-27-R-X044 is an Indefinite Delivery Contract issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of an Engine Control Input Assembly Adapter (NSN 1560-01-101-9743). This is a total small business set-aside for a Navy-identified Critical Safety Item. The contract requires a total delivery period of 780 days after receipt of order, which includes specific timelines for production, government production lot testing evaluation, and final delivery to MCAS Cherry Point, North Carolina. The award will be based on a best-value trade-off assessment, with significant weight placed on past performance, specifically SPRS assessments and historical quality and delivery compliance. The contractor must adhere to stringent quality and security standards, including CMMC Level 2 certification and compliance with ITAR and EAR export controls. Technical data access is restricted to approved US/Canada Joint Certification Program participants. Packaging and marking must strictly follow MIL-STD-129 and MIL-STD-130 for unique item identification. Inspection occurs at the source, while acceptance is at the destination. Payment and invoicing are processed through the Wide Area Workflow (WAWF) system. Offerors must submit quotes via email and maintain active registration in the System for Award Management.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 336412
New
DIBBS
DISK, VALVE
Solicitation # SPE4A7-27-T-1601
Solicitation SPE4A7-27-T-1601 is a request for one Valve Disk, identified as NSN 2915-01-528-5417 and designated as a Navy Identified Critical Safety Item. The procurement is managed by the DLA Weapons Support ASC Supplier Oper AE and AF Div, with a required delivery of 160 days after order, targeting a ship date of April 6, 2027. Delivery is set as FOB Origin to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. All quotes must be submitted via the DLA Internet Bid Board System (DIBBS). Offerors are encouraged to provide quantity ranges to accommodate volatile demand and must provide details regarding dealer or distributor certifications. The contract mandates strict adherence to quality and material standards, including SAE AS9100 for quality management and MIL-STD-2073-1E and MIL-STD-129 for packaging and marking. Compliance with the Buy American Act and the Berry Amendment is required, and any use of non-domestic materials must be disclosed. Notably, items produced via additive manufacturing are prohibited unless specifically authorized. The award process involves origin inspection and acceptance, with sampling conducted per MIL-STD-1916 or ASQ H1331. Payment and invoicing must be processed through the Wide Area WorkFlow (WAWF) system, and contractors must register via the Account Management and Provisioning System (AMPS) to maintain access to the Vendor Shipment Module.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract, identified by the notice ID 271ef4086729482ea5a56f6a83fbd8ed, is a solicitation for a metallic air compressor seal under the title "28--SEAL,METALLIC,AIRCR." It falls under the procurement category managed by the Department of Defense, specifically within the Department of the Navy, NAVSUP Weapon Systems Support in Philadelphia. The solicitation number for this contract is N0038325QS086. The notice was posted on January 23, 2025, and it is active with a response deadline set for March 24, 2025, at 16:30 EDT. This contract is classified under NAICS code 336412 and classification code 2840, indicating it involves the manufacture of materials or components for aerospace products. There is no specific type of set-aside indicated for this solicitation. The primary point of contact for inquiries regarding the contract is Sophia Noel, who can be reached at SOPHIA.NOEL@NAVY.MIL or by telephone at 215-697-4313. Although the contract notice description link and other related details are available, the place of performance remains unspecified. The office address for the contracting organization is located in Philadelphia, PA, with the postal code 19111-5098. More details about the opportunity can be accessed via the provided link to the SAM.gov webpage.

General Info

Solicitation for metallic air compressor seal by Navy, deadline March 24, 2025.

Contract Value

$0

NAICS

336412 - Aircraft Engine and Engine Parts Manufacturing

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N763.08|NA|NA|SOPHIA.NOEL@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||ISO9002|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|TBD|TBD|TBD|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|336412|1500||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|||| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130, revision level "L" or latest revison, and IAW the drawing requirements. 1.2 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.3 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;ROLLS ROYCE; drawing number ( ;63005; ) ;23004669; , Revision ;LATEST; and all details and specifications referenced therein. 1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.1.1 Dimensional test (special) ;APPLIES AT CONTRACTORS FACILITY; 4.1.2 Requirements of: ;NA; 4.1.3 Form ;APPLIES; 4.1.4 Fit ;NA; 4.1.5 Function ;NA; 4.1.6 Compliance with drawing ( ;63005; ) ;23004669; , Revision ;LATEST; and specifications referenced therein. 4.2 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.4 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.4.1 The QAR shall be present to witness all First Article Testing. 4.4.2 The following additional personnel shall witness the First Article Testing: ;NAVSUP WSS N23 DCMA FRCSE; 4.5 Disposition of FAT samples 4.5.1 ; ; Sample(s) may be destroyed during testing. 4.5.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.6 Test Sample Coating Instructions 4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.7 Notice to Government of Testing at the contractors facility. 4.7.1 FAR 52.209-3 applies (A) The contractor shall present ;1; ; unit(s) of the following CAGE( ;63005; ; ), Part Number ;23004669; ; , Revision ;LATEST; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;NAVSUP WSS CODE N23 FRCSE DCMA; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.9 Production Lot Test Requirements: The tests to be performed under the production lot sample testing provisions of the contract are as follows: 4.9.1 Workmanship Production lot samples shall be inspected to determine general workmanship. 4.9.2 Dimension check Production lot samples shall be inspected to determine compliance with applicable drawings and/or specifications. ;APPLIES / PLT TO BE PERFORMED AT THE CONTRACTORS FACILITY WITNESSED AND ACCEPTED BY THE DCMA QAR; 4.9.3 Form: ;APPLIES; 4.9.4 Fit: ;NA; 4.9.5 Function: ;N/A; 4.9.6 Requirement of: ;N/A; 4.10 In addition to the above tests, the production lot samples to be delivered hereunder shall also be subjected to those tests which will demonstrate that the samples comply with the contract requirements. 4.11 The contractor will be responsible for providing the necessary parts and repair of the production lot samples during testing. 4.12 Disposition of test samples 4.12.1 ; ; Samples shall not be returned to the contractor because they shall be destroyed during testing. 4.12.2 ;APPLIES; Unless otherwise provided for in the contract, samples shall be returned to the contractor and may be considered as production items under the contract provided the samples can be refurbished to Ready For Issue condition and provided the samples have inspection approval of the cognizant DCMC QAR. Samples may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.12.3 ; ; Samples shall be returned to the contractor but shall not be considered as production due. 4.13 Production Lot Test Criteria: 4.14 (A) As specified in this contract, the contractor shall test ;2; selected at random by the cognizant Government Inspector (DCMC) as production lot samples. At least fourteen (14) calendar days before beginning the production lot sample tests, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so the Government may witness the tests. (B) The contractor shall submit the Production Lot Sample Test Report within 15 calendar days from the date of testing. Forward copies of the report in accordance with the distribution cited on the DD1423. Mark reports as follows: "Production Lot Sample Test Report, Contract No. ________ Lot/item No. ____." Within forty-five (45) calendar days after the Government receives the test report, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the production lot samples. A notice of disapproval shall cite the reasons for the disapproval. Unless expressly permitted elsewhere in this contract, the delivery of the production articles shall not be made until after notification by the Government of the approval/disapproval of the production lot samples; any production items delivered prior to the notification of the approval/ disapproval of the production lot samples shall be at the contractor's risk. (C) In the event the contractor does not receive written notification of approval or disapproval of the samples for a particular production lot within forty-five (45) days from their submission for such testing, the contract delivery schedule shall be equitably adjusted as necessary. (D) If the contractor fails to deliver the test report for any production lot samples within the time or times specified, of if the Contracting Officer disapproves any production lot samples, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract, and this contract shall be subject to termination for default. (E) In order for a production lot to be acceptable, all samples representative of the lot must pass all of the contract requirements. In the event a sample fails to pass such requirements the lot will be rejected. In such event, the Government may, at its option and at no additional cost to the Government, (I) terminate all or any portion of this contract for default, (II) require the manufacture of a new production lot, or a rework of the rejected production lot if the means and procedures proposed by the contractor for rework are acceptable to the Government, or (III) require the submission of additional samples for test. The foregoing procedures shall apply to new or reworked production lots in the same way as they did to the original production lot. (F) For each additional sample or each resubmission of a modified sample which the contractor is required to submit for approval hereunder as a result of the failure of a previous sample to conform to the requirements of the specifications, the contractor shall pay the Government the costs of reinspection, shipping, examination, and retesting by the Government, and the contractor and his sureties (if any) shall be liable for the amount of such costs. 4.15 ALTERNATE OFFERORS - Waiver of Production Lot Testing Approval Requirements Unless otherwise specified in Section E of this solicitation, the Naval Inventory Control Point reserves the right to waive the Production Lot Testing Approval Requirements specified herein for offerors who have previously furnished IDENTICAL production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of Production Lot Testing Approval Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation and (II) the production location to be used for this requirement is the same as used for the previous production run Additionally, the offeror shall submit a certification, to be executed by the officer or employee responsible for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequence of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) In the event waiver of the Production Lot Testing Approval Requirements is granted, the delivery schedule for the production units shall be one hundred and sixty-five (165) days earlier than that which is desired had the waiver not been granted. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers the government. Offeror's Alternative Proposed Delivery Schedule (Based on waiver of Production Lot Testing Approval Requirements) Within Days: Item No._____________ Quantity: _________ After Date of Contract: ____________ 4.16 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;PRESSURE TEST PASSAGES L (ZONE B6) AND M ZONE (C5) PER EIS 1875 CLASS A TO 100 PSIG THE CASTING IS TO PROVIDE THE CAPABILITY OF MEETING FINAL PRESSURE TEST REQUIREMENTS.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.17 . Quality/Inspection Requirements The following quality/inspection requirements apply: MIL-I-45208A and paragraphs 3.1-3.5, 5.1-5.2, 6.1-6.2 of MIL-Q-9858. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS