Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2nd And Delaware Storm Drain Improvements Project

Closed
20260625035State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds equal to the contract price and insurance from companies with an A.M. Best rating of A-VII or better. Technical standards include AWWA Specification C-600 for pipelines and NEMA MG1 for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of bidding for reimbursement. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The 2nd and Delaware Storm Drain Improvements Project (Project No. 46C006) is a municipal construction solicitation issued by the City of San Mateo, California. The project involves the rehabilitation and replacement of stormwater infrastructure, specifically the removal of existing 8-inch storm drain pipe, a capped storm drain, and a catch basin. The contractor will install new 8-inch Ductile Iron Pipe, 18-inch High-Density Polyethylene Pipe, a G-3 catch basin, and a standard storm manhole. Surface restoration includes 2-inch full-width cold-planing, a 2-inch Hot Mix Asphalt overlay, and new thermoplastic pavement striping, with final adjustments made to existing valve boxes and manhole covers. The engineer's estimate for the construction is $285,000.00. Bids are due by 2:00 p.m. on July 21, 2026, and must be submitted as sealed physical documents to the City Clerk at City Hall. Eligible contractors must hold a valid Class A license and obtain a San Mateo business license. Required submission documents include a non-collusion affidavit, a list of subcontractors, a bidder's statement, and an in-use off-road diesel-fueled vehicle list. The City will award the contract based on its best interests, prioritizing the lowest responsible bidder. Awardees must provide a 100% performance bond, a 100% payment bond, and commercial general liability insurance with a minimum coverage of $5,000,000 per occurrence. Work is governed by Caltrans Revised Standard Specifications and City Standard Drawings, with a one-year warranty period for latent defects.

General Info

San Mateo storm drain project, $285,000 estimate, bids due July 21, 2026.

Place of Performance

San Mateo, CA, 94403, USA

Set-Aside

NONE

Documents

4

City Project No. 46C011: 2nd Ave & Delaware St Storm Drain Improvement Project

PDF, High priority: read this first7 pages · specifications
High

Project 46c006 - Addendum No. 1 (2nd and Delaware Storm Drain Improvements)

PDF, High priority: read this first2 pages · amendment
High

Project No. 46C006: 2nd and Delaware Storm Drain Improvements

PDF, High priority: read this first78 pages · ifb
High

2nd & Delaware Storm Drain Improvements - Plan Holders List

PDF, Low priority3 pages · plan-holders
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Mateo
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Charlie EvansAssistant Engineer

Full Description

Show more
Bid #46C006: The project consists of storm drain improvements at 2nd and Delaware in San Mateo. The scope includes the removal of existing 8-inch storm drain pipe, a capped storm drain, and a catch basin. The contractor will install new 8-inch Ductile Iron Pipe, 18-inch High-Density Polyethylene Pipe, a G-3 catch basin, and a standard storm manhole. Surface work involves 2-inch full-width cold-planing, a 2-inch Hot Mix Asphalt (Type A) overlay, and new thermoplastic pavement striping and markings. The work is completed by adjusting existing valve boxes and manhole covers to the new grade.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS