This Solicitation opportunity from Oklahoma was posted on February 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2nd BF Switching 470 - 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Western Technology Center is seeking proposals for a switching upgrade at its Burns Flat location for the 2026 funding year. The project involves providing and installing switching hardware across three stacks distributed between two racks to establish a core and distribution network. Key technical requirements include 25 Gb stacking, a redundant 225 Gb LACP inter-rack trunk, and basic Layer-3 functionality. The solution must support local management via CLI and browser GUI without cloud dependency, though a three-year cloud management option may be quoted separately. Hardware must include a mix of fiber-centric core switches and copper access switches with PoE++ and dual power supplies where specified, all backed by a lifetime warranty. The selected vendor will be responsible for the full implementation, including evaluating existing configurations, racking and stacking new equipment, cabling, and performing post-cutover validation. Deliverables include as-built configurations, updated network diagrams, and port maps. Bids must be all-inclusive and submitted by March 21, 2026. Strict compliance with E-Rate rules is mandatory, including USAC registration, a valid SPIN, and adherence to Lowest Corresponding Price regulations. Failure to provide specific pricing or the separation of non-E-Rate eligible items will result in automatic disqualification. Selection will be based on best value, with price serving as the primary factor.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Cybersecurity Maturity Model Certification (CMMC) Program ServicesOpen now
- CIT01277069_System Implementation ServicesOpen now, due in 20 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Scope & Objective WTC seeks proposals to furnish switching hardware and professional services for Rack 1 (Core/Distribution) and Rack 2 (Distribution) at the Burns Flat location. The solution must deliver 25 Gb stacking, a redundant 225 Gb LACP inter-rack trunk, basic Layer-3, and local (on-prem) manageability with an optional 3-year cloud-management add-on. Functionally equivalent solutions meeting or exceeding requirements are welcome; see attached RFP for full specifications.
Target Topology (Summary) - Stack #1 Rack 1 (Core/Distribution): One 24-port 1G_10G fiber-centric core switch plus three 48-port copper access switches (at least one multigig with PoE++/dual PSU) in a single 25 Gb stack; provide 225 Gb LACP to Rack 2/Stack #2. - Stack #2 Rack 2 (Distribution): One 48-port multigig PoE++ (dual PSU) and one 48-port 1G non-PoE switch in a 25 Gb stack. - Stack #3 Rack 2 (Distribution): Two 24-port 1G copper non-PoE switches in a 25 Gb stack. Cable distances: intra-stack links ~12 ft; inter-rack trunk ~12 ft (use SFP28 DAC/SR/LR as appropriate).
Key Hardware/Platform Requirements - 25 Gb SFP28 uplink/stacking across all stacks; stack up to 12 devices. - Basic L3 (static); enterprise features (VLANs, LACP, STP, IGMP snooping v3, ACL, SPAN/RSPAN, DHCP relay, NTP, LLDP, BPDU guard). - Local management via CLI + browser GUI (no cloud dependency). Cloud management optional and must be quoted as a separate 3-year option. - Lifetime warranty/support; no recurring license required for base features. Physical console port required. - Provide/verify compatible optics (e.g., 13 1000BASE-SX + 2 1000BASE-LX in Stack #1) and SFP28 DAC/SR/LR for stacking/uplinks.
Install/Config Services (Summary) Coordinate with WTCs IT Director; evaluate existing configs/cabling; propose best-practice adjustments; implement approved configs; document and label all cabling/port mappings before disconnecting; remove old gear; rack/stack new gear (including PSUs and 25 Gb links); reconnect; and perform post-cutover validation (VLAN/L3, LACP, PoE where applicable, stack health). Deliver as-built configs, updated L2/L3 diagrams, and port maps.
Pricing & Compliance Submit all-inclusive pricing (hardware, optics, PSUs, stack cables, install/config, shipping, travel, taxes/fees). List non-E-Rate-eligible items separately. Any vendor not meeting any of these terms will be automatically disqualified: USAC Registration & SPIN: Must be registered with USAC, possess a valid SPIN, and comply with all E-Rate rules. Lowest Corresponding Price (LCP): Must comply with FCC LCP rules. Complete Cost Disclosure: All costs must be included in the bid. Separation of Ineligible Items: All non-E-Rate eligible items must be listed separately. Specificity of Bid: Bids must be specific to the Form 470 services requested. Generic descriptions or laundry lists will be disqualified. Prohibited Automated Responses: SPAM and/or robotic responses will not be considered valid and will be disqualified.
Evaluation & Submission Best-value selection with price as the primary factor; see RFP. Proposals due by March 21, 2026 (11:59 PM). Direct questions and submissions per instructions in the attached RFP.
Attachment: RFP Switching Upgrade (Burns Flat Location) (full specs, SOW, mandatory requirements, disqualification criteria, format, and schedule).
Requested services (4 line items): - Category 2 — Basic Maintenance Of Internal Connections — Switches - Category 2 — Internal Connections — Switches And Necessary Software And Licenses - Category 2 — Internal Connections — Antennas, Connectors, And Related Components - Category 2 — Internal Connections — Cabling
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260022453/139923/21205547-USAC_FCC_FORM_470_APPLICATION_260022453_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260022453/139923/21205115-2ndRFP_WTC_ERate_RFP_Switching_Core_Upgrade_BurnsFlat.docx
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
