Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on August 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2WS/557WW Demountable Walls

Closed
FA460026Q0095 Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 55 CONS intends to award a sole source, firm-fixed-price contract to Encompass Corporation for the reconfiguration of Haworth Demountable Walls at Offutt AFB, Nebraska, supporting the 2WS and 557WW. This project, categorized under NAICS code 238390 and Product Service Code N017, is a 100% total small business set-aside. The work involves extensive modifications to office layouts, including the disassembly and relocation of wall panels to create independent spaces, the merger of multiple rooms into open-concept footprints, and the installation of new demountable door panels. Specific tasks are divided between general 2WS modifications and the B185 lower-level workspace expansion, which includes the reconfiguration of rooms L421, L422, and L423. The contractor is responsible for providing all labor, project management, and materials, maximizing the reuse of legacy panels and hardware. Key deliverables include as-built drawings, redlined installation drawings, O&M manuals, and a one-year workmanship warranty. All work must adhere to federal safety standards and various building codes, including the International Building Code and NFPA 72. The contractor must also manage security clearances and escort badges for personnel. While the government will handle HVAC air transfer grilles, the contractor must restore the site to its original or better condition within 10 workdays of completion. The award is expected to be made prior to September 30, 2026, using RFO part 12 Simplified Procedures.

General Info

DoD sole source contract for Encompass Corporation to reconfigure walls at Offutt AFB.

NAICS

238390 - Other Building Finishing Contractors

Place of Performance

0, NE, 68113, USA

Set-Aside

SBA

Documents

2

B185 LL Demountable Walls SOW

DOCX, High priority: read this firstsow
High

WOC+2WS+STATEMENT+OF+WORK++20+July+2026.cfb

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4600 55 Cons Pkp
Contacts2 people available
OfficeOFFUTT AFB, NE, 68113, USA
Office AddressOFFUTT AFB, NE, 68113, USA

Full Description

Show more

PRE-SOLICITATION


OFFUTT AFB 2WS/557WW Demountable Walls 55 CONS/PKB - FA4600


106 PEACEKEEPER LN, STE 2N3, OFFUTT AFB, NE 68113


27 August 2026


Product/Service Code:           N017


NAICS code:                          238390


Place of Performance:           Offutt AFB, Nebraska


Proposed Set Aside:              100% Total Small Business Set-Aside


DESCRIPTION


55CONS intends to award a sole source, firm-fixed-price contract to Encompass Corporation for the reconfiguration of Haworth Demountable Walls for the 2WS and the 557WW. This notice is not a request for competitive quotes; however, interested parties who believe they can meet the requirements listed below may submit capability statements for consideration.  Please see the attached PWS's for further specifications of this requirement. 


Summary of Performance Work Statements:


2WS


4.1 Wall Modifications


  • Rooms 1340 & 1342 Partition: Disassemble existing demountable wall panels dividing Rooms 1340 and 1342. Salvage, inspect, and reuse hardware to relocate and install the wall, completely enclosing Room 1342 as an independent space.

  • Room 1332 Reconfiguration: Install new demountable partition walls to divide the current footprint into two (2) fully enclosed offices and a shared communal area, including all ceiling tracks, floor channels, acoustic seals, and trim.

  • Room 1343 Deconstruction: Fully disassemble and remove demountable walls, door frames, and hardware from Room 1343 to restore it to an open-plan layout. Hand over salvaged components to the 557th WW Facility Manager (or legally dispose/recycle as directed).

  • Rooms 1220, 1221, & 1222 Merger: Disassemble and remove the demountable partitions dividing Rooms 1220, 1221, and 1222 to merge them into a single, open-concept footprint. Patch and repair affected ceiling grids, floor surfaces, and adjacent walls.


4.2 Door Installations


The Contractor shall install four (4) 40-inch demountable door panels configured to open inward at the following locations:


  • Room 1342: One (1) door panel.

  • Room 1332: Two (2) door panels (one for each of the newly constructed offices).

  • Room 1332 (from Room 1320): One (1) door panel.


4.3 HVAC (Government Furnished Property/Work)


  • Air Transfer Grilles: Install return air transfer grilles between Room 1340 and the new office space, and between the new offices within Room 1332 to balance static pressure and ensure proper airflow distribution.

  • Note: This specific task (4.3) will be accomplished by the 557th Weather Wing Facilities office and is excluded from the contractor's performance requirements.


B185


The contractor shall perform the following teardown, relocation, and installation tasks:


  1. Room L422 Relocation and Reconfiguration:
    1. Dismantle and move the L423 four (4) West wall panels to the East by approximately 8ft.
    2. Utilize the existing L422 door and glass panel to establish the new L422 door space.
  2. Room L423 Expansion and Reconfiguration:
    1. Reclaim and integrate existing L423 and legacy L422 demountable panels to expand the designated work area.
    2. Use on hand demountable wall stock to fill in existing wall gaps to complete the room (~25ft).
    3. Install double solid wood doors in the Southeast corner of the room, complete with appropriate framing and HAWORTH-compatible commercial hardware. Final door location determined at install (adjust as needed to accommodate install)
  3. Room L421 Configuration
    1. Use existing material stock to install new walls to close in Collaboration and training space.  Approximately 25 linear feet of panels, configured as two intersecting runs of approximately 23 feet and 2 feet. Final adjustment allowed during install.
    2. Extract the legacy L423 door and associate hardware and re-install door to serve as the new entrance for Room L421. TBD during install (Adjustments allowed as needed)


This requirement will be awarded using RFO part 12 Simplified Procedures.  The award will be made prior to 30 September 2026. 


If you have any questions please reach out via email to A1C Hunter Hendrix (hunter.hendrix.1@us.af.mil) or TSgt Jennifer Prestridge (jennifer.prestridge.1@us.af.mil).

More opportunities from Department Of Defense → FA4600 55 Cons Pkp

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS