Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on May 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

30 CES - Pad Mount Transformers (1 of 2)

Closed
FA461025Q0041Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335311
New
International
Design, Supply and Installation of the STATCOM
Solicitation # 25065
The British Columbia Hydro and Power Authority is conducting a Request for Information under solicitation number 25065 for the design, supply, and installation of a Static Synchronous Compensator (STATCOM) solution. This initiative is intended to support a major load project for a large industrial customer located within the North Thompson and Nicola regions of British Columbia. The project scope involves the design, factory simulation testing, supply, and installation of four STATCOMs at both new and existing substations. Technical requirements specify that equipment must be 24 MVAR or above with a base voltage of 138kV, and the STATCOM controller must be fully compatible with an existing 20-year-old ABB controller for a coordinated operation period of six to eight months. The procurement requires adherence to North American Standards, specifically IEEE C57.12.00 and CSA C88, with seismic qualification according to IEEE 693. Key deliverables include testing and commissioning, on-site training with manuals, and the provision of spare parts and special tools. This current process is for information gathering only and does not constitute a pre-qualification or shortlisting event. BC Hydro intends to issue a formal Request for Proposal in the second quarter of 2027, with a target contract award in the fourth quarter of 2027. Responses must be submitted electronically via BC Bid or to the designated contact, Man Kit Suen, by the deadline of November 17, 2026.
British Columbia Hydro and Power Authority

POSTED

about 18 hours ago

DEADLINE

in 28 days
NAICS: 335311
New
DIBBS
CABLE ASSEMBLY-SWITCH,
Solicitation # SPE4A6-27-T-5391
Solicitation SPE4A6-27-T-5391 is a request for quotations from the DLA Weapons Support ASC Commodities Division for the procurement of four electrical switch cable assemblies, identified by NSN 6150-01-733-1778. The items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with a required delivery date of August 18, 2027, and a need ship date of March 21, 2027. The contract specifies a delivery period of 144 days and requires FOB Origin terms. Compliance requirements are stringent, including mandatory adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, with a specific requirement for a cap or plug on one end of the assembly. Quality assurance must meet ISO 9001:2015 standards, and origin inspection is required. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access export-controlled data subject to ITAR or EAR regulations. The procurement incorporates various FAR and DFARS clauses, including those regarding the Buy American Act and the Berry Amendment. A price evaluation preference is available for certified HUBZone small businesses. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Quotations are due by October 27, 2026, and should be submitted via the DLA-BSM Internet Bid Board System.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 19 hours ago

DEADLINE

in 7 days
NAICS: 335311
New
DIBBS
WIRING HARNESS, BRANCHE
Solicitation # SPE4A6-27-T-5390
Solicitation SPE4A6-27-T-5390, issued by the DLA Weapons Support ASC Commodities Division, is for the procurement of three branched wiring harnesses (NSN 6150-01-676-3571). The items must be delivered with caps and plugs, coiled to 10 x 10, and shipped to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The delivery window is 160 days after the order, with a need ship date of April 6, 2027. Inspection and acceptance will occur at the point of origin. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality assurance requires sampling per MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Technical data is subject to ITAR and EAR export controls, and the contractor must comply with CMMC Level 2 and DFARS 252.204-7012 regarding the safeguarding of covered defense information. Invoicing must be processed electronically through the Wide Area WorkFlow system. Award evaluation is based on price, with a specific preference for certified HUBZone small businesses. Offers utilizing additive manufacturing are ineligible for award. The procurement also incorporates standard FAR and DFARS clauses regarding the Buy American Act, the Berry Amendment, and prohibitions on covered defense telecommunications equipment. Item Unique Identification is not required for this specific order.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 19 hours ago

DEADLINE

in 7 days
NAICS: 335311
New
DIBBS
TRANSFORMER, POWER
Solicitation # SPE7M1-27-T-1087
Solicitation SPE7M1-27-T-1087 is a request from the DLA Weapons Support Maritime Supply Chain for the procurement of eight power transformers (NSN 6120-01-595-7610). The items are identified as Commercial Off The Shelf (COTS) and must be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The required delivery date is September 20, 2025, with a need ship date of August 19, 2025. All quotes must be submitted via the DLA Internet Bid Board System (DIBBS), and the procurement may be subject to automated award. The contract mandates strict adherence to military standards for packaging, marking, and preservation, specifically MIL-STD-2073-1E, MIL-STD-129, and MIL-E-17555. Technical and quality requirements are governed by RA001 and the DLA Master List, while RQ011 requires the removal of government identification from non-accepted supplies. Inspection and acceptance will occur at the destination per FAR 52.246-2. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Compliance requirements include the Buy American and Balance of Payments Program (DFARS 252.225-7001) and the Berry Amendment. Offerors must provide representations regarding covered defense telecommunications equipment and safeguarding covered defense information per DFARS 252.204-7012. While the NAICS code is 335311, the solicitation utilizes a HUBZone price evaluation preference. Alternate offerors are required to submit a complete data package for any proposed alternate parts.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 19 hours ago

DEADLINE

in 10 days
NAICS: 335311
New
DIBBS
CABLE ASSEMBLY, SPECIAL
Solicitation # SPE4A6-27-T-5392
Solicitation SPE4A6-27-T-5392 is issued by the Defense Logistics Agency for the procurement of one special purpose electrical cable assembly, identified by NSN 6150-01-564-6021. The contract requires delivery to the DLA Distribution DDSP New Cumberland facility in Pennsylvania, with a delivery window of 411 days after order and a required delivery date of October 31, 2027. The procurement is conducted under the First Destination Transportation program, with both inspection and acceptance occurring at the origin. Compliance requirements are stringent, necessitating that manufacturers maintain an ISO 9001:2015 certified quality system. Technical data is subject to ITAR or EAR export controls, requiring offerors to possess an approved US/Canada Joint Certification Program certification. Quality assurance involves zero-based sampling plans per MIL-STD-1916 or ASQ H1331, and the contract mandates Contractor First Article Testing with a 14-day notice to the government prior to shipment. Packaging must adhere to MIL-STD-2073-1E and specific drawing requirements, while marking must comply with MIL-STD-129. The award process includes a price evaluation preference for SBA-certified HUBZone small businesses and may favor offers with shorter delivery timelines. The contract incorporates various FAR and DFARS clauses, including those for the Buy American Act, Berry Amendment compliance, and NIST SP 800-171 cybersecurity assessment requirements. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 19 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract, issued by the Department of the Air Force at Vandenberg Space Force Base, is a total small business set-aside under NAICS code 335311, focusing on the procurement of five pad-mounted transformers with specific voltage ratings ranging from 112.5 KVA to 750 KVA. The government’s financial obligation is contingent upon the availability of appropriated funds, and no payments will be made until funds are confirmed available and the contractor receives written notice from the Contracting Officer. The transformers must meet detailed technical specifications, including stainless-steel construction, dead-front design, copper windings, mineral oil insulation, and compliance with the 2016 DOE efficiency standards. Additional requirements include specific features such as a "Pentahead" locking mechanism, oil gauges, fuses, a primary load break switch, tap changers, and safety labels, all finished in Munsell-Green paint suitable for outdoor use. The contract emphasizes quality and safety standards, including testing for dielectric and performance conformance per ANSI standards, and guarantees a coil winding temperature rise of 65°C over ambient. The solicitation was posted on May 14, 2025, with responses due by May 30, 2025, and can be accessed via the provided link. The designated points of contact are SrA Christopher Mendoza and TSgt Mark Wheeler, who can be reached via email or phone for further inquiries.

General Info

Air Force solicits five stainless-steel phase pad-mounted transformers, small business set-aside, funds pending.

Agency

Department Of Defense → FA4610 30 Cons Pk

NAICS

335311 - Power, Distribution, and Specialty Transformer Manufacturing

Place of Performance

CA, 93437, USA

Set-Aside

SBA

Documents

4

30 CES Pad Mount Transformers RFQ

PDF, High priority: read this firstrfq
High

Atch+2_PricingSheet - Pad Mount Transformers

XLSX, High priority: read this first4 pages · rfq
High

FA461025Q0034 Clauses and Provisions

PDF, High priority: read this firstspecifications
High

SOW for Power Transformers - Vandenberg Space Force Base

PDF, High priority: read this first4 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4610 30 Cons Pk
Contacts2 people available
OfficeVANDENBERG SFB, CA, 93437-5212, USA
Organization / Agency
Department Of Defense → FA4610 30 Cons Pk
Office AddressVANDENBERG SFB, CA, 93437-5212, USA
Contacts
TSgt Mark Wheeler

Full Description

Show more
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. Five (5) phase pad-mounted transformers shall have the following voltage ratings: - 112.5 KVA, 208Y/120, 12 kV - 150 KVA, 480Y/277, 12 kV - 300 KVA, 480Y/277, 12 kV - 500 KVA, 480Y/277, 12.47 kV - 750 KVA, 480Y/277, 12 kV In addition, the five phase pad-mounted transformers shall meet VSFB electrical requirements below: - All stainless-steel construction (includes tank, cabinet, base, radiators, fasteners, hinges, etc.),stainless-steel grade shall be 304L or 316L (if available). "Pentahead" cabinet locking mechanism/device. - Dead-Front construction (HV-200A load break elbows with shield adapters). - Externally clamped LV bushings with threaded copper stud for full load current below 2,100.amperes - NEMA spades shall be provided per ANSI hole requirements. - Radial feed or Loop feed - Frequency: 60Hz. - Windings: HV/LV copper - Mineral Oil-filled (Non-PCB): Type FR-3 Fluid. - Standard impedance. - Mild steel high-voltage/low-voltage compartment barriers. - Cooling fins. - Proper grounding provisions. - Dial type gauges for oil temperature, liquid level and pressure/vacuum. - Bay-O-Net fuses & current-limiting fuses: properly sized - additionally, the transformer shouldbe equipped with three spare fuses. - Two-position "ON/OFF" load break primary switch - 5-position tap changer: (-5%, -2 - %, 0, +2 - %, +5%) - Automatic pressure relief device mounted on the terminal compartment. - Oil drain valve with sampling device, and an oil-fill/oil-level plug. - Nameplate and NEMA safety labels: include a "UL Listed" symbol on ratings label andnameplate. - Compliant with 2016 DOE Efficiency Standard. - Four (4) lifting lugs. - Entire exterior of the pad-mount transformer and terminal components shall be painted with aMunsell-Green, outdoor color-finish. - Guaranteed to have an average coil winding temperature of 65'C rise over an average ambient airtemperature of 30'C when operated at rated voltage and load conditions. - Provide DGA test to verify conformance to performance requirements as outlined in the latestrevisions of ANSI C57.12.00 and ANSI C57.12.90.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS