This Government Contract opportunity from Department Of Defense was posted on May 30, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

30--SHAFT,STRAIGHT

Awarded
N0038322RP347Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, issued by Navsup Weapon Systems Support, is for the procurement of a straight shaft designated as critical material for a shipboard catapult system. Due to the high risk associated with failure in aircraft launch and recovery operations, the contract mandates strict quality control, including 100 percent inspection of critical and major characteristics and adherence to MIL-STD-130 markings and ANSI Z1.4 sampling rates. The contractor is responsible for all manufacturing aids and must maintain traceability for individual piece parts. A rigorous First Article Testing process is required, necessitating notification to the Government 14 days prior to testing and the submission of a detailed test report within 15 days of completion. Final inspection requires 100 percent Procurement Contracting Officer mandatory inspection at the source under DCMA surveillance. The contract includes a 12-month warranty on supplies and requires that all certifications and inspection documents be available during the First Article presentation.

General Info

Contract Value

$792,000

NAICS

332710 - Machine Shops

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

N0038322RP347.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 4:00 AM UTC on May 19, 2022. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
Contacts

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|N762.06|U8J|+1 (555) 000-0000|contact@example.gov|||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and receiving report combo||TBD|N00383|TBD|TBD|See Schedule|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|333613|750|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.3 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.4 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.5 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.6 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.7 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.8 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;800208-1; ) ;514958-1; , Revision ;F; and all details and specifications referenced therein. 1.9 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.10 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=514958 |80020| F| |C| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;ALL ACTUAL DIMENSIONS OF ANY MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.2 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA/QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;NOMINAL TOLERANCES; 4.3.2 Requirements of: ;LKE DRAWING; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;80020; ) ;514985; , Revision ;F; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;ONE; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;514985-1; ; , Revision ;F; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE ITEM FOR THE CATAPULTS JBD SYSTEM. DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (18-10104): \ DATE OF FIRST SUBMISSION=150 DAC ALL CERTIFICATIONS. TEST REPORTS, AND IN-PROCESS INSPECTION DOCUMENTS NEEDED TO SUBSTANTIATE PRODUCT QUALITY SHALL BE AVAILABLE WITH THE FIRST ARTICLE WHEN PRESENTED FOR INSPECTION AT CONTRACTORS FACILITY TO DCMA.

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation N00383-26-Q-AA77, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the teardown, evaluation, repair, upgrade, and modification of three electrical control panels (NSN 6110-01-433-5020, P/N 014344585). This procurement is governed by Basic Ordering Agreement N00383-25-G-AQ01 and requires all units to be returned to a Ready For Issue condition. The contractor is responsible for providing all labor, materials, and tooling, with a specific prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. The required Repair Turnaround Time is 50 days after receipt of the asset, and the induction expiration date is 365 days after the contract award. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Technical requirements include adherence to ISO 9001/SAE AS9100 quality systems and MIL-STD-2073 packaging standards. Inspection and acceptance will occur at the origin. Offerors must submit their quotations by November 30, 2026, at 4:30 PM local time. Payment will be processed electronically through the Wide Area WorkFlow system. Key administrative provisions include Buy American requirements, security prohibitions regarding Chinese military companies, and strict guidelines for handling Beyond Economical Repair and Missing on Induction assets.
Motor and Generator Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS