Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

321-100-139-01 | Renovate Building 603

Open
321-100-139-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Human Services is seeking an Architect/Engineer (A/E) for the comprehensive renovation and modernization of the 61,162 square foot Medical/Surgical Building 603 (BX062) at the Shapiro Developmental Center in Kankakee, Illinois. The project aims to accommodate approximately 80 residents in a medium-secure forensic developmental disability setting. The scope includes renovating the east and west wings to provide resident rooms, nurse stations, dining and common areas, and support spaces. Key requirements include the installation of anti-ligature and ligature-resistant fixtures, structural repairs, restoration of the building envelope, and upgrades to plumbing, electrical, and HVAC systems. Site improvements will feature secure anti-climb perimeter fencing, a secure vehicle sally port, and a secure outdoor recreation area. The A/E must ensure the design complies with the Illinois Stretch Energy Code and achieve a minimum of LEED Silver Certification or an equivalent green building standard. The project involves hazardous materials and requires ongoing consultation with the State Historic Preservation Office. Coordination with the Department of Innovation & Technology (DoIT) is required for telecommunications and networking. The A/E is responsible for identifying and applying for utility incentives and grants, and must provide cost estimates that align with the project budget to avoid redesigns. The project has a combined MBE/WBE goal of 20%, requiring the participation of at least one MBE and one WBE firm. There is no set-aside status specified for this contract.

General Info

Architect/Engineer sought for renovating Shapiro Developmental Center's Medical/Surgical Building 603.

NAICS

N/A

Place of Performance

IL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstsow
High

Read the document

Due in 20 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Department of Human Services
Contacts1 person available
OfficeIL
Office AddressIL
Contacts
Maus GaryProject manager

Full Description

Show more
The Medical/Surgical Building 603 (BX062) is a 61,162 square foot, 4-story building established in 1951.
The scope of work provides for the comprehensive renovation and modernization of Building 603 (BX062) at the Shapiro Developmental Center in Kankakee, Illinois, to accommodate approximately 80 residents in a medium- secure forensic developmental disability setting. The project will renovate the currently vacant east and west wings, including resident rooms, toilet and bathing facilities, nurse stations, dining and common areas, offices, and associated support spaces. Work shall include correction of deferred maintenance and code compliance deficiencies, building-wide accessibility and life/safety improvements, structural repairs to foundations, walls, floors, and other deteriorated components, restoration of the building envelope, including masonry, windows, doors, glazing, and sealants, and replacement of interior finishes. Existing elevators shall be evaluated and upgraded or replaced as necessary to meet applicable codes and accessibility requirements. The project shall include evaluation, rehabilitation, and replacement of deteriorated plumbing supply, waste, and vent piping, plumbing fixtures, fire protection systems, electrical distribution, lighting, communications, nurse call and resident notification systems, and remaining HVAC components as necessary. Resident rooms, bathrooms, and other applicable areas shall incorporate anti-ligature and ligature-resistant design features, fixtures, furnishings, electrical devices, and building components appropriate for the anticipated resident population and associated behavioral health and safety requirements. The work shall also include asbestos abatement, lead-based paint mitigation, and associated architectural restoration, with appropriate consideration for the historic character of the facility.
Site improvements shall include accessible routes, sidewalks, ramps, parking lot improvements, site lighting, loading dock rehabilitation, grading, drainage, retaining wall repairs, landscaping, and associated site restoration. Security improvements shall include medium-security anti-climb perimeter fencing, secure pedestrian and vehicle gates, a secure vehicle sally port and resident intake area, security screening at windows, secure entry and exit doors, access controls, surveillance systems, and other improvements necessary to accommodate the intended resident population. Cable television infrastructure shall be provided throughout the renovated residential wings. Improvements will also provide a secure outdoor recreation area for resident use, enclosed with an anti-climb security fence. The area shall be designed to allow residents access to fresh air and outdoor activities in a safe environment. Work shall include the installation of accessible sidewalks/walkways and a reinforced concrete pad sized to accommodate one or more picnic tables. All site improvements shall be coordinated to provide safe access, proper drainage, and durable, low-maintenance surfaces suitable for year-round use.
The project shall be coordinated with recently completed and ongoing roof, HVAC, and communications improvements to avoid duplication of work, ensure proper integration of building systems, and preserve existing warranties. The A/E shall coordinate with a separately contracted, independent third-party commissioning agent retained by the CDB, incorporate applicable commissioning requirements into the construction documents, and assist with resolution of deficiencies identified during the commissioning process. Construction shall be phased to accommodate continued use of occupied portions of the facility, with security improvements coordinated with the anticipated occupancy of the renovated residential wings. The A/E shall verify existing conditions, evaluate the full extent of required improvements, coordinate with applicable regulatory and historic preservation authorities, and develop a comprehensive renovation design within the established project budget.
Hazardous materials will be encountered.
The State Historic Preservation Office should be consulted during every phase of this project.
If applicable, the A/E will be required to coordinate all telecommunications and networking requirements with the Department of Innovation & Technology (DoIT) during design and construction. If applicable, a minimum of LEED Silver Certification or equivalent green building standard certification will be required.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
The design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS