Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on September 21, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

36--VA797R-14-R-0029 - LITTLE ROCK, AR LAUNDRY EQPT

Awarded
VA797R14R0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, issued by the Department of Veterans Affairs under solicitation VA797R14R0029, outlines the procurement and installation of comprehensive industrial laundry equipment for a textile care processing facility in Little Rock, Arkansas. The scope of work includes the furnishing and installation of a wide array of machinery, ranging from heavy-duty washing and drying systems to specialized finishing equipment. Key items include continuous wash extract tunnel systems, various capacities of washer-extractors and gas-heated tumblers, flatwork ironing systems, and a garment tunnel finisher. Beyond primary washing and drying, the contract covers essential facility infrastructure and support systems. This includes a water storage and pumping system with water softening, a soil storage and sorting conveyor, and the refurbishment of automated monorail systems for both clean and soiled sides. Additional requirements encompass plant management software, air filtration, a central wet/dry vacuum system, and various folding and wrapping machines. All pricing must be inclusive of equipment costs and full installation services, including rigging, plumbing, pressure piping, and electrical work necessary for proper operation.

General Info

Contract Value

$10,192,880

NAICS

333318 - Other Commercial and Service Industry Machinery Manufacturing

Place of Performance

IL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline changed from Apr 10, 2015 to Feb 17, 2016. The notice description changed.

Deadline changed

Response deadline changed from Feb 17, 2016 to May 18, 2016.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Nac Federal Supply Schedule (36F797)
ContactsNo contacts available
OfficeHINES, IL, 60141, USA
Office AddressHINES, IL, 60141, USA
ContactsNo contact information available

Full Description

Show more
SCHEDULE OF SUPPLIES/SERVICES and PRICES/COSTS ITEM # 1 Laundry Ancillary Support Water Storage/Pumping System Equipment, and related systems: Furnish and install new, one (1) system. The laundry ancillary support water storage/pumping system equipment and water softening system. Qty: 1 System Unit Price$ ______________ each Total for 1 System $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 2 Non-Recessed Floor Scales: Furnish and install 2 (ea) non-recessed floor scales with a maximum weight capacity of 3000 pounds, recessed within the floor Qty: 2 Unit Price$ ______________ each Total for 2 $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 3 Soil Storage/Sorting Conveyor System: Furnish and install new, 1 (system). Qty: 1 System Unit Price$ ______________ System Total for 1 System $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 4 Refurbish and Install Automated Soil and Clean Side Monorail System - Refurbish two (2) system automated monorail system on both the clean and soiled sides of the textile care processing facility. Qty: 2 Refurbished System Unit Price$ _________ System Total for 2 Systems $________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 5 Continuous Wash Extract Tunnel Washing Systems: Furnish and install two (2) each, Continuous Wash Extract Washing Systems (CWEWS). . Qty: 2 Systems Unit Price$ ______________ each Total for 2 systems $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 6 400/500-POUND WASHER-EXTRACTOR: Furnish and install new, one (1) each, open pocket automatic loading non-production washer extractor. Qty: 1 each Unit Price$ ______________ each Total for 1 each $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 7 200/300-POUND WASHER-EXTRACTOR: Furnish and install new, one (1) each, open pocket automatic loading non-production washer extractor. Qty: 1 each Unit Price$ ______________ each Total for 1 each $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 8 400/500 POUND GAS HEATED DRYING AND CONDITIONING TUMBLER WITH EXTERNAL LINT COLLECTION: Furnish and install new, one (1) each, 400/500 LB drying and conditioning tumbler. Qty: 1 each Unit Price$ ______________ each Total for 1 each $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 9 100/110 LB Washer Extractors Furnish and install new, three (3) each, 100/110 LB washer extractors. Qty: 3 each Unit Price$ ______________ each Total for 3 each $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 10 110/120 Pound (Non-Production) Gas Heated Drying and Conditioning Tumblers: Furnish and install three (3) each 110/120-pound gas heated dryer with internal lint collection. Qty: 3 each Unit Price$ ______________ each Total for 3 each $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 11 Flatwork Ironing Systems: Furnish and install two (2) each, color touch screen controls & information systems" that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics. Qty: 2 systems Unit Price$ ______________ each Total for 2 systems ____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 12 Small Piece Folding Machines: Furnish and install 4 (ea.) color touch screen controls & information systems" that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 13 Folding Tables: Furnish and install 6 (ea), folding tables and storage devices. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ *************************************************************************************************************ITEM # 14 Central Wet/Dry Vacuum System: Furnish and install one (1), 20 horsepower central wet/dry vacuum system. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ITEM # 15 Industrial Laundry Plant Management System: Furnish and install new, one (1) each Industrial Laundry Plant Management System. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 16 Air Filtration System: Furnish and install new three (3) each Air Filtration Systems. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ *************************************************************************************************************************** ITEM # 17 Garment Tunnel Finisher: Furnish and install 1 (ea) Garment Tunnel Finisher. Qty: 1 Unit Price$ ______________ each Total for 1 $____________ Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 18 Blanket Folder System: The successful offeror shall provide and install one (1) ea. Blanket folding system. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 19 Portable Plastic Wrapping Machine: The successful offeror shall provide and install a plastic, heat seal portable wrapping machine. Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ *************************************************************************************************************

More opportunities from Department Of Veterans Affairs → Nac Federal Supply Schedule (36F797)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS