Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

38--REVERSIBLE PLOWS, HITCHES, PATROL WING to Grand Canyon Natl Park

Active
P15PS00167Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the procurement and installation of snowplow equipment for the Grand Canyon National Park, specifically reversible plows, plow hitches, and an underbody patrol wing. The purchase includes one 11-foot reversible Henke snowplow with compatible accessories, a wing-style truck-mounted snowplow, and three plow hitches designed for mounting on 2015 Freightliner MS106 dump trucks extended with frame rails and front PTO provisions. The plow hitches will feature in-cab hydraulic controls allowing operators to manage the equipment from the driver's seat. Additionally, the contract includes a 12-foot Henke Alaska Expressway reversible plow and all necessary mounting hardware and components, ensuring compatibility with the specified truck models. Modifications to the contract clarified the requirements and added options, such as installation services for the plow hitches and in-cab hydraulic controls for sanding operations on the trucks. Installation work is expected to be performed at the Grand Canyon National Park's heavy equipment facility. The solicitation is issued as a combined synopsis/solicitation under Federal Acquisition Regulations Subpart 12.6 and includes detailed specifications for equipment dimensions, materials, and functionality. Quotes are to be evaluated based on several line items, excluding the installation line from the lowest price technically acceptable determination, and must include applicable sales tax. The contract aims to enhance the park’s snow removal capabilities through the acquisition and proper installation of specialized plowing equipment.

General Info

Procurement and installation of reversible snowplows, plow hitches, and hydraulic controls for Grand Canyon trucks.

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

Place of Performance

GRAND CANYON NATIONAL PARK<br />1576 SHUTTLE BUS ROAD<br />GRAND CANYON<br />AZ<br />86023<br />USA<br /> 86023 USA, CO

Set-Aside

NONE

Documents

4
PDF, High priority: read this first7 pages · rfq
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first2 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseCombined Synopsis
Posted

Combined Synopsis

Notice updated

The response deadline was removed. The notice title changed. The notice description changed.

Notice updated

The notice title changed. Set-aside removed. The notice description changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
MODIFICATIONS Modification #1, 12/02/14, is to correct the solicitation attachment. No other terms were changed. Modification #2 , 12/22/14, is to add an optional line item to install in cab controls and plumb hydraulic lines to run sanders for the 10-yard trucks, and to clarify information concerning the (3) plow hitches, items D) & G), as follows: It is the intent of Grand Canyon National Park to purchase (3) plow hitches....The contractor shall mount hitches to three 2015 Freightliner MS106 dump trucks with frame rail extensions, including in-cab hydraulic controls to operate plow hitch and snow plows from driver's seat. The 2015 Freightliner dump trucks, on which the contractor will mount the hitches, come with front frame extensions, which will be a minimum of 18 inches. The front frame extensions will also include a stationary grill, radiator, hood, and other equipment required for the installation of a front crankshaft PTO. The PTO, itself, is not included on the dump trucks. The bumper will be the chassis manufacturer's swept-back full width. The frame extension load rating will be at least half the GAWR of the front axle furnished as standard. The NPS has added a line item for hitch installation, assuming the contractor will need to travel to the South Rim of Grand Canyon NP and perform all work at the heavy equipment facility. This line item will not be considered as part of the "Lowest Price Technically Acceptable." NPS will evaluate quotes on the items / deliverables, lines items A ¿ H, and K Applicable Sales Tax. ==There is a .PDF version of this RFQ is attached on FBO & FedConnect.net > Public Opportunities > Reference Number P15PS00167. Please see the attachment for the complete solicitation and modifications. == This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. This request is being issued as Request for Quotation P15PS00167. The Federal Acquisition Regulation (FAR) clauses and provisions enclosed within are those in effect through Federal Acquisition Circular (FAC) 2005-53. FAR clauses and provisions are available through Internet access at http://www.ACQUISITION.gov/far. For the sake of easy reading, we will refer to the National Park Service as Us, We or Park Service, and interested bidders as You / Your. It is the intent of Grand Canyon National Park to purchase the following: A) One (1) reversible 11-foot snowplow. Henke43R12ISTTTE with 1x6 runners, or equal, with compatible accessories. The snowplow shall be reversible, 11 feet wide, J-style steel plow, 43 inches tall with a trip edge. Plow shall utilize a tube push frame with an A frame slide to assure a level lift in all positions. B) One (1) wing style truck mounted snowplow. Henke UBPW 8-8 foot Under Body Patrol Wing Snowplow, or equal. Quote must include installation on Frieghtliner MS106 6x6 56,000 GVW dump truck with in cab hydraulic controls. Mid or rear mount style Leading end height 29-inch and discharge end height 36-inch 3/16-inch thick, high tensile steel rolled plate moldboard with box paneled design Telescoping, spring cushioned, adjustable pushbar All hydraulic lift-no cables Post assembly and mounting hardware, including rear underbody cross tube Rear pintle hitch mount Cutting edge C) Three (3) plow hitches. Henke Plow hitch, or equal. Hitches will be mounted to 2015 Freightliner MS106 dump trucks with frame rail extensions and front PTO provisions. All quotes will include in Cab Hydraulic controls to operate plow hitch and snow plows from driver¿s seat. Universal hitch truck portion Low profile design Fold down lift arm 4-inch x 10-inch single acting lift cylinder Truck attachment kit for freightliner MS106 Flat plate for SQH adapter Hitch painted satin black D) One (1) plow, Henke Alaska Expressway Plow ¿ 12¿ or equal. LINE ITEMS *UPDATED from Modification # 2, 22 Dec 14:* A) 11¿ REVERSIBLE PLOW, HENKE or equal, Configuration 43R12ISTTTE, SSTE, quantity = 1 B) 1¿ x 6¿ RUNNERS for the 11¿ reversible plow, quantity = 1 C) RUBBER SHIELD for the 11¿ reversible plow, quantity = 1 D) PLOW HITCH for the 11¿ reversible plow, quantity = 1 E) TILT FOR PLOW HITCH, quantity = 1 F) 12¿ REVERSIBLE PLOW, HENKE ALASKA EXPRESSWAY OR EQUAL, quantity = 1 G) COMPATIBLE PLOW HITCH, quantity = 2 H) UNDERBODY PATROL WING, HENKE UBPW 8-8 OR EQUAL quantity = 1 I) INSTALL plow hitches at Grand Canyon NP, Coconino County, AZ 86023. Facilities, tools, utilities will be available. J) INSTALL in-cab controls and plumb hydraulic lines to run sanders on (3) NPS ten-yard trucks K) APPLICABLE SALES TAX

Similar Contracts

Same NAICS industry code

NAICS: 333924
New
Federal
35K lb. Base Capacity 4-wheel Sit-Down AC Electric Lift Truck, including Options, Battery, Charger, and Freight
Solicitation # W911S227U0101
Solicitation W911S227U0101 is a total small business set-aside for the procurement of one new, heavy-capacity, four-wheel sit-down AC electric lift truck with a base capacity of 35,000 pounds. The equipment must be current production and is intended for indoor industrial material-handling operations at the McAlester Army Ammunition Plant in Oklahoma. Key technical requirements include a rated lifting capacity of at least 28,700 pounds at a 24-inch load center, a maximum fork height of 103.5 inches, and a 72-volt electrical system or better. The forklift must be delivered fully assembled and include a compatible battery, charger, and all necessary accessories. The contract is awarded on a fixed-price basis to the responsible offeror whose proposal is most advantageous to the government, evaluating both price and technical compliance. Delivery is required on an FOB Destination basis no later than September 30, 2027, with a preferred delivery window of 30 days. The award includes a minimum 12-month or 2,000-hour general warranty and a 36-month or 6,000-hour powertrain warranty. The successful contractor must also provide on-site operator orientation and furnish comprehensive electronic and hard-copy manuals. All quotes must be submitted via the PIEE Solicitation module and include a completed certification of country of origin.
W6QM Micc-Ft Drum

POSTED

about 10 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming. The project scope involves extensive structural, utility, and preservation work on one lodge, eight cabins, one garage, two outbuildings, and a water well structure to convert them into employee housing. Key technical requirements include the installation of a new sanitary sewer collection system, lift station, and water distribution for domestic and fire service, as well as the expansion of the parking lot to include ADA spaces. The project is estimated to have a construction magnitude exceeding 10 million dollars, with a base performance period of 303 calendar days, potentially extending to 669 days depending on the selected CLINs. The government will award the contract using the Best Value Continuum Tradeoff Process, evaluating proposals based on technical approach, project experience, schedule, and past performance, with non-price factors being equally important to price. Contractors must adhere to strict environmental and safety regulations, including potential seasonal closures from February 1 to August 15 for bald eagle nesting and protections for roosting bats. Additionally, the project requires the management of hazardous materials, as surveys have identified potential asbestos and lead-based paint across the facilities. Proposals must be submitted electronically to the Contracting Officer, Tony Jasper, by the specified deadline, and the successful bidder will be required to provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS