Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 4, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

39 CES Compressors Single Source Justification

Awarded
FA568522P0039Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333912
New
DIBBS
CYLINDER HEAD, COMPR
Solicitation # SPE7M4-27-T-0511
Solicitation SPE7M4-27-T-0511 is a request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of five compressor cylinder heads. This is designated as a critical application item, specifically identifying Curtiss-Wright Electro-Mechanical 830Q4 part number 220462F1 under NSN 4310010596086. The technical requirements are governed by TDP Rev A Gen 1, and the procurement incorporates DLA master list technical and quality requirements via RA001. A key environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, with limited exceptions per NAVSEA 5100-003D. The contract specifies a need ship date of October 20, 2026, with an original required delivery date of March 13, 2028. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, DLA Distribution San Joaquin in Tracy, California. Packaging and marking must strictly adhere to MIL-STD-2073-1E, MIL-STD-129, and RP001. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, domestic material restrictions, and the prohibition of covered defense telecommunications equipment. Quotations must be submitted via the DIBBS portal by October 19, 2026.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 18 hours ago

DEADLINE

in 2 days

General Info

NAICS

333912 - Air and Gas Compressor Manufacturing

Place of Performance

Incirlik AB, Adana, 01340, TUR

Set-Aside

NONE

Documents

1

Single+Source+Justification+Compressors_Redacted.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Justification (J&A)

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5685 39 Cons Lgc
Contacts2 people available
OfficeAPO, AE, 09824-0127, USA
Office AddressAPO, AE, 09824-0127, USA
Contacts
Lt. Zachary Ashley
SSgt Stephen Barter

Full Description

Show more
This contract has been awarded as a sole source IAW FAR 13.5. - Bauer Model UN4i/25-E3, five stage, air cooled, pressure lubrication high pressure compressor - Maximum working pressure: 6000 psi Application working pressure: To be advised - Charging Rate: 25.2 SCFM Tolerance on capacity +/- 5%. - E-stop button - BAUER 15-inch HMI touch-screen interface Compressor low oil & high temperature safety shutdowns - FAD3 SCFM: 21.0 - Charging Rate4 SCFM: 25.2 - HP: 20 - RPM: 1300 - Compressor Model: K18.1 II - Purification System: P5 Securus - Air Processing Capability5 (cu ft): 150,000 - The aftercooler shall be designed to cool the discharge air to within 18'F of ambient temperature. The compressor control panel shall include an across-the-line magnetic motor starter, 24-volt DCcontrol power supply and PLC controller. The control panel shall be built in accordance with UL 508A, the standard for Industrial Control Panels and shall be affixed with a UL label. The label shall also include unit data including the unit serial number, date of manufacture, system voltage and electrical phase. - Breathing air station to refill self-contained breathing apparatus (SCBA) cylinders with purified air that meets or exceeds the requirements of CGA Pamphlet G-7, Compressed Air for Human Respiration, the requirements of ANSI/CGA G-7.1, Commodity Specification for Air, Grade E, and all other recognized standards for respirable air. - The station shall be designed for a maximum working pressure of 6,0001 PSIG. The Manufacturer shall operate under a Quality Management System which complies with the requirements of ISO 9001:2015 for the design, manufacture, inspection, test, and service of air & gas compressors and associated spare parts for commercial and military applications. - The air storage system shall include two receivers fabricated, tested and stamped in accordance to Section VIII of the ASME Boiler and Pressure Vessel Code. The receivers shall have a 3:1 safety factor at 6000 PSIG (7000 PSIG MAWP at 200'F).8 Each receiver shall have a capacity of 491 cu ft at 6000 PSIG9. - A NEMA type 4 electrical enclosure - UL electrical panel - A 15 - Human Machine Interface (HMI) multi color screen display shall be provided on the control operations panel - Home screen customizable with distributor contact information - Compressor on / off - Digital Display of Compressor Final Pressure - Digital Display of Compressor Oil Pressure - Digital Display of current Compressor Run Time - Digital Display of Final Separator Cycle Count - Compressor High Temperature Shutdown and Alarm - Full support of the Automatic Condensate Drain system (interval and duration set points adjustable thru the HMI - password protected) - Digital Display of time to next ACD Cycle - Condensate Drain Reservoir full alarm - Full support of CO monitor alarm functions - Full support of the automatic cascade control system - Full support of Tiered operator password security levels - Full support of SECURUS purification system moisture monitor warning and alarm functions - Built in overtime timer set at 5 hours - optional times available - Maintenance Timer (selectable between real time or compressor run time) to give Digital Display of all needed Preventative Maintenance Evolutions - Motor overload alarm - Nonresettable hourmeter - Recoverable Run History (last 5 run periods) - Recoverable Alarm History (last 5 fault shutdowns) - Support of up to 5 Languages (to be specified at time of order; includes English, French, Spanish & Portuguese) - Operator choice of display in BAR or PSI - PLC has removable Terminal Blocks for all connections - EEPROM (Electrically Erasable Programmable Read-Only Memory) upgrade capability - Support of optional remote communication protocols o Via broadband cellular router; 3G and or 4G - The system wiring shall be encapsulated within a flexible braided cover. Each wire end connection shall be machine crimped and numbered -The HMI shall have adjustable system parameters secured by password protection. The HMI will provide display of all safety / fault shutdowns with a text read-out of the potential cause/s for the fault / shutdown.

More opportunities from Department Of Defense → FA5685 39 Cons Lgc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS