Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 3, 2004. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

44--Upgrade to dust collection system in Building 1C Bay 4 at Tobyhanna Army Depot, Tobyhanna, PA.

Awarded
W25G1V-04-R-0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, solicitation W25G1V-04-R-0005, involves the upgrade of the dust collection system in Building 1C Bay 4 at the Tobyhanna Army Depot in Pennsylvania. The project requires the provision and installation of a dust collector and vacuum producer capable of 24/7 operation to support ten vacuum drops in the sanding operation. The system must feature a two-stage filtration process including a centrifugal separation chamber and polypropylene bags cleaned automatically by compressed air, with all particles collected in 55-gallon drums. The scope of work includes minor construction to expand the equipment room, involving the demolition and installation of walls to accommodate the new machinery. Additionally, the contractor is responsible for the removal of existing vacuum tubing containing hazardous materials, specifically metal and paint particles. The total period of performance for the installation, testing, documentation, and training is 128 days from the date of award.

General Info

Contract Value

$103,300

NAICS

333411 - Air Purification Equipment Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W0ML USA Deputy Tobyhanna
ContactsNo contacts available
OfficeTOBYHANNA, PA, 18466-5079, USA
Office AddressTOBYHANNA, PA, 18466-5079, USA
ContactsNo contact information available

Full Description

Show more
This action is pursued in accordance with FAR Parts 12 and 13 (13.5). The required upgrade will include providing and installing a dust collector and vacuum producer, including testing, documentation, and training, to accommodate ten (10) of the vac uum drops in the sanding operation at Tobyhanna Army Depot (TYAD). The system must be capable of operation 24hrs/day 7days/wk. The system shall contain a two-stage filtration system, a centrifugal separation chamber and a second stage or bag chamber of th e separator. The second stage of the filtration system shall consist of a series of Polypropylene bags or equal having a total square footage of cleaning area capable of servicing the simultaneous operation of a minimum of ten (10) vacuum stations. Cleani ng of the filter bags shall be accomplished automatically by means of compressed air. All dust particles shall be collected in a 55 gallon drum located under the hopper. Included in the requirement is a minor construction effort, range is below $25,000.00 , to expand the equipment room wherein the vacuum producer and dustcollector will be co-located with an existing vacuum producer and dust collector. The equipment room has walls which are approximately twenty feet (20 ft) high and are made of wood frame an d drywall; one sixteen foot (16 ft) wall must be demolished; two walls lengthened by eight feet (8 ft); and a new sixteen foot (16 ft) wall installed. Additionally, some existing vacuum tubing must be removed, requiring HazMat removal. The dust particles from the sanding operation are metal and paint; and the paint is considered to be HazMat. The period of performance is 128 days from date of award. See note 1.

More opportunities from Department Of Defense → W0ML USA Deputy Tobyhanna

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS