Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on January 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

4486-122-R Hillsborough Co., McLane Middle Sch., Gen

Awarded
State & Local
Solicitation #
H0981

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under the Hazard Mitigation Grant Program, this contract awards $561,979.20 to provide backup power for McLane Middle School in Brandon, Florida, which serves as a designated emergency shelter. The project involves the purchase and installation of a diesel-powered permanent generator, estimated at 1000-kW or a size determined by an electrical engineer, equipped with a 1,700-gallon fuel tank capable of 24 hours of operation. The installation includes an Automatic Transfer Switch to ensure safe power transfer and must comply with National Electrical Code working clearance requirements. To ensure resilience, the generator must be protected against a 500-year flood event by being located outside the Special Flood Hazard Area or implementing specific mitigation activities in accordance with National Flood Insurance Program requirements. Additionally, the unit must feature a rated enclosure and anchoring that meets ASCE 7 wind standards. All activities must be completed in strict compliance with federal, state, and local regulations, with a performance period extending through January 31, 2026. This contract is managed by the Florida Executive Office of the Governor and is not designated as a set-aside.

General Info

$561,979.20 grant for a backup generator at McLane Middle School by January 2026.

Contract Value

$561,979.2

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

January 31, 2026

Documents

1
PDF, Low priorityaward
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program (HMGP) project, the Sub-Recipient shall provide backup power to McLane Middle School located at 306 North Knights Avenue, Brandon, Florida 33510. Coordinates: (27.943551, -82.291488). The HMGP project shall provide protection by purchasing and installing a 1000-kW permanent generator, or the adequate size determined by the vendor and/or an electrical engineer during the bid process to provide backup power in the event power is lost. The generator shall be powered by diesel and include a fuel tank. The fuel tank shall have a capacity of 1,700 gallons and can run the generator for 24 hours before needing refueling. The generator shall be purchased with all accessories necessary for its operation at the building, including an Automatic Transfer Switch (ATS) to allow for safe transfer of power. McLane Middle School is designated as an emergency shelter in the event of a disaster. By installing the generator to provide backup power, the project shall enable to building to be functional in the event of an outage and avoid loss of vital emergency shelter services. The generator shall be protected against a 500-year flood event by implementing specific activities or by locating the generator outside the Special Flood Hazard Area (SFHA), comply with applicable National Flood Insurance Program (NFIP) requirements and shall be protected against wind with a rated enclosure and appropriate anchoring based on its location requirements per ASCE 7 standards. The selected site shall provide sufficient space to maintain and fuel the generator and shall comply with the National Electrical Code working clearance requirements. Activities shall be completed in strict compliance with Federal, State and Local Rules and Regulations.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS